JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT

K30 Plate Load Test Record


Commission Dept. PT Wijaya Karya persero. Tbk. Report NO. JBHSR-WIKA6-K30-20200407-02
Project Name JBHSR - ST. Karawang DK 41 Commission NO. JBHSR-WIKA6-K30-20200407-02
Construction Milleage DK 40+950 ~ DK 40+080 Record NO. JBHSR-WIKA6-K30-20200407-02
Filler Name TANAH MERAH Compaction method VIBRATOR MACHINE
Design Foundation ≥110 Mpa Test Date April 7, 2020
Managemen Range of Temp. Relative
Instrument Name Model Definition
t NO. Value (℃) Humidity(%)
Instrument and
Coefficient
Environment Condition
K30 Manual G 100376 19 25 Mpa of Subgrade 33 63%
Reaction
Packing Compaction Adoption Standard
Filling Layer Thickness h cm Test Elevation H m Load Plate Diameterφ 300 mm
Hydraulic Sinkage(Dial Gauge Index) Load Plate
Load Load Intensity Gauge S(0.01mm) Sinkage(0.01m
Order σ(MPa) Index
Table1 Table2 Table3 Average
P(MPa
Preload
0.04 2.1 49 32
ing
Reset 0.00 0 0 0 0 0.00
1 0.04 2.1 26 28 27 0.27
2 0.08 3.9 45 52 49 0.49
3 0.12 5.7 83 89 86 0.86
4 0.16 7.6 113 118 115.5 1.16
5 0.20 9.4 138 141 139.5 1.40
6 0.24 11
7 0.28 12.9
8 0.32 14.3
9 0.36 16.4
10 0.40
σ —S Relation curve:
Load Intensity σ (MPa)
0.00 0.04 0.08 0.12 0.16 0.20 0.24
0.00
Settlement S (mm)

0.50

1.00
y = 1.8973x2 + 6.767x - 0.0104
R² = 0.9957
1.50

Load corresponding to settlement of 1.25 mm σ S 0.157 Mpa Foundation Coefficient K30 125.7 MPa/m
Remarks : 16 Passing

Tested By: Calculated By: Checked By:


JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
K30 Plate Load Test Record
Commission Dept. PT Wijaya Karya persero. Tbk. Report NO. JBHSR-WIKA6-K30-20200407-01
Project Name JBHSR - ST. Karawang DK 41 Commission NO. JBHSR-WIKA6-K30-20200407-01
Construction Milleage DK 40+950 ~ DK 40+080 Record NO. JBHSR-WIKA6-K30-20200407-01
Filler Name TANAH MERAH Compaction method VIBRATOR MACHINE
Design Foundation ≥110 Mpa Test Date April 7, 2020
Managemen Range of Temp. Relative
Instrument Name Model Definition
t NO. Value (℃) Humidity(%)
Instrument and
Coefficient
Environment Condition
K30 Manual G 100376 19 25 Mpa of Subgrade 33 63%
Reaction
Packing Compaction Adoption Standard
Filling Layer Thickness h cm Test Elevation H m Load Plate Diameterφ 300 mm
Hydraulic Sinkage(Dial Gauge Index) Load Plate
Load Load Intensity Gauge S(0.01mm) Sinkage(0.01m
Order σ(MPa) Index
Table1 Table2 Table3 Average
P(MPa
Preload
0.04 2.1 49 32
ing
Reset 0.00 0 0 0 0 0.00
1 0.04 2.1 23 27 25 0.25
2 0.08 3.9 59 63 61 0.61
3 0.12 5.7 60 79 70 0.70
4 0.16 7.6 119 127 123 1.23
5 0.20 9.4 129 138 133.5 1.34
6 0.24 11
7 0.28 12.9
8 0.32 14.3
9 0.36 16.4
10 0.40
σ —S Relation curve:
Load Intensity σ (MPa)
0.00 0.04 0.08 0.12 0.16 0.20 0.24
0.00
Settlement S (mm)

0.50

1.00
y = -0.279x2 + 6.9844x - 0.0077
R² = 0.9714
1.50

Load corresponding to settlement of 1.25 mm σ S 0.160 Mpa Foundation Coefficient K30 127.7 MPa/m
Remarks : 16 Passing

Tested By: Calculated By: Checked By:


JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
K30 Plate Load Test Record
Commission Dept. PT Wijaya Karya persero. Tbk. Report NO. JBHSR-WIKA6-K30-20201207-01
Project Name JBHSR - ST. Karawang DK 41 Commission NO. JBHSR-WIKA6-K30-20201207-01
Construction Milleage DK 41+120 ~ DK 41+220 Record NO. JBHSR-WIKA6-K30-20201207-01
Filler Name TANAH MERAH Compaction method VIBRATOR MACHINE
Design Foundation ≥110 Mpa Test Date December 7, 2020
Managemen Range of Temp. Relative
Instrument Name Model Definition
t NO. Value (℃) Humidity(%)
Instrument and
Coefficient
Environment Condition
K30 Manual G 100376 19 25 Mpa of Subgrade 33 63%
Reaction
Packing Compaction Adoption Standard
Filling Layer Thickness h cm Test Elevation H m Load Plate Diameterφ 300 mm
Hydraulic Sinkage(Dial Gauge Index) Load Plate
Load Load Intensity Gauge S(0.01mm) Sinkage(0.01m
Order σ(MPa) Index
Table1 Table2 Table3 Average
P(MPa
Preload
0.04 2.1 49 32
ing
Reset 0.00 0 0 0 0 0.00
1 0.04 2.1 25 28 27 0.27
2 0.08 3.9 49 52 51 0.51
3 0.12 5.7 88 91 90 0.90
4 0.16 7.6 119 124 121.5 1.22
5 0.20 9.4 136 140 138.0 1.38
6 0.24 11
7 0.28 12.9
8 0.32 14.3
9 0.36 16.4
10 0.40
σ —S Relation curve:
Load Intensity σ (MPa)
0.00 0.04 0.08 0.12 0.16 0.20 0.24
0.00
Settlement S (mm)

0.50

1.00
y = -2.0089x2 + 7.6446x - 0.025
R² = 0.9912
1.50

Load corresponding to settlement of 1.25 mm σ S 0.175 Mpa Foundation Coefficient K30 139.8 MPa/m
Remarks : 16 Passing

Tested By: Calculated By: Checked By:


JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
K30 Plate Load Test Record
Commission Dept. PT Wijaya Karya persero. Tbk. Report NO. JBHSR-WIKA6-K30-20201207-02
Project Name JBHSR - ST. Karawang DK 41 Commission NO. JBHSR-WIKA6-K30-20201207-02
Construction Milleage DK 41+120 ~ DK 41+220 Record NO. JBHSR-WIKA6-K30-20201207-02
Filler Name TANAH MERAH Compaction method VIBRATOR MACHINE
Design Foundation ≥110 Mpa Test Date December 7, 2020
Managemen Range of Temp. Relative
Instrument Name Model Definition
t NO. Value (℃) Humidity(%)
Instrument and
Coefficient
Environment Condition
K30 Manual G 100376 19 25 Mpa of Subgrade 33 63%
Reaction
Packing Compaction Adoption Standard
Filling Layer Thickness h cm Test Elevation H m Load Plate Diameterφ 300 mm
Hydraulic Sinkage(Dial Gauge Index) Load Plate
Load Load Intensity Gauge S(0.01mm) Sinkage(0.01m
Order σ(MPa) Index
Table1 Table2 Table3 Average
P(MPa
Preload
0.04 2.1 49 32
ing
Reset 0.00 0 0 0 0 0.00
1 0.04 2.1 28 32 30 0.30
2 0.08 3.9 56 59 58 0.58
3 0.12 5.7 79 84 82 0.82
4 0.16 7.6 117 121 119 1.19
5 0.20 9.4 134 137 135.5 1.36
6 0.24 11
7 0.28 12.9
8 0.32 14.3
9 0.36 16.4
10 0.40
σ —S Relation curve:
Load Intensity σ (MPa)
0.00 0.04 0.08 0.12 0.16 0.20 0.24
0.00
Settlement S (mm)

0.50

1.00
y = -3.0692x2 + 7.5317x - 0.0023
R² = 0.9949
1.50

Load corresponding to settlement of 1.25 mm σ S 0.162 Mpa Foundation Coefficient K30 129.8 MPa/m
Remarks : 16 Passing

Tested By: Calculated By: Checked By: