B.S Sieve Size Wt. Retained (g) % Retained % Passing Specification Limits
10 0.0 0.0 100.0
6.3 0.0 0.0 100.0
2 682.7 43.0 57.0
1 357.2 22.5 34.5
0.425 289.0 18.2 16.3
0.075 221.0 13.9 2.4
< 0.075 38.3999999999999 2.4
FLAKINESS INDEX
BS Sieve in mm 50 37.5 28 20 14 10 6.3
a Wt passing screen g.
b Wt retained on screen g.
c Total wt of sample (a+b)
d Flakiness Index (a/c)%
e % Retained on screen (b/c)%
g
a s s i n
f Product (d x e)
P
%
100 G r a d i n g C u r v e
90
80
70
60
50
40
30
20
10
0
0. 01 0. 1 1 10 100
Remarks:
Engineer Contractor
Date
Observation
Project: Isebania-Kisii-Ahero (A1) Road Project; Lot 1: Isebania-Kisii Road Project
Contract No: KeNHA/RD/D&C/2138/2017
MECHANICAL ANALYSIS TEST OF AGGREGATES
(ISO SIEVES)
Sample Number 1106 Date Sampled 04-Feb-21
Location Awendo Quarry Date Tested 04-Feb-21
Total weight of sample 1514 (g) Sample Size 0~6
B.S Sieve Size Wt. Retained (g) % Retained % Passing Specification Limits
10 0 0.0 100.0
6.3 0.0 0.0 100.0
2 653.8 43.2 56.8
1 344.7 22.8 34.0
0.425 278.8 18.4 15.6
0.075 201.7 13.3 2.3
< 0.075 35 2.3
FLAKINESS INDEX
BS Sieve in mm 50 37.5 28 20 14 10 6.3
a Wt passing screen g.
b Wt retained on screen g.
c Total wt of sample (a+b)
d Flakiness Index (a/c)%
e % Retained on screen (b/c)%
g
a s s i n
f Product (d x e)
P
%
100 G r a d i n g C u r v e
90
80
70
60
50
40
30
20
10
0
0. 01 0. 1 1 10 100
Remarks:
Engineer Contractor
Date
Observation