SUMMARY
A GENERAL ................................................................................................................................... 4
A.1 PROJECT DESCRIPTION ......................................................................................................................... 5
A.1.1 GENERAL .......................................................................................................................................................................................... 5
B TECHNICAL DESCRIPTION................................................................................................... 6
B.1 PAPER MACHINE DATA ........................................................................................................................... 7
B.2 HEADBOX OPERATING PARAMETERS ............................................................................................... 8
B.2.1 HEADBOX ROUGHNESS SPECIFICATION .................................................................................................................................... 9
B.6 AUXILIARIES............................................................................................................................................. 28
C STANDARDS ............................................................................................................................ 29
C.1 UNITS ........................................................................................................................................................... 30
C.2 TECHNICAL STANDARDS ...................................................................................................................... 31
C.3 SHOP ERECTION ...................................................................................................................................... 33
C.3.1 GENERAL ........................................................................................................................................................................................ 33
C.3.2 HEADBOX ....................................................................................................................................................................................... 33
D ENGINEERING ....................................................................................................................... 34
D.1 GENERAL ................................................................................................................................................... 35
D.2 MANUALS ................................................................................................................................................... 37
D.3 ENGINEERING STANDARDS ................................................................................................................. 38
A.1.1 GENERAL
HEADBOXES
TOP LAYER HYDRAULIC HEADBOX with its attenuator
This will give the possibility for future production increase of 20% considering the same
retention and headbox consistency.
Header : 16 0.20
Nozzle : 4 0.10
B.4.1 MANIFOLD
Function Carries stock from inlet piping across the machine and
disperses stock to tube bank.
Construction Stainless steel 304L and stainless steel 316L for all part
in contact with the pulp.
Parabolic shape
Function Allows the volume of flow through the edge tubes in the
tube bank to be manually regulated.
Flow can be locally from 160% to 60% of the nominal
flow. So to supply solution to any edge issue may occur
Position for the edge flow control system will be
provided
CPM JK PAPER Paper Machines part
6023-21 V2 Page 15 of 42
Our Reference : SM 24 May 2021
Equipment Location At edges of tube bank. System is inside oversized edge
tubes.
B.4.7 LAMELLAS
Function Optimize final stock flow from the slice. Maintaining the
optimized micro-turbulence created on the turbolence
generator up to the slice lip while pulp is accelerating to
machine speed.
Equipment Location Two are supplied: on the front and on the back pond
side in the sheet region.
Feature Replaceable.
Equipment Location Between the tube bank and the slice body knuckle.
Eccentric outer knuckle attaches tube bank to slice
body.
Pitch 150 mm
B.4.16 SHOWER
Equipment Location This shower is located under the Headbox and directed
under the nose of the bottom lip.
Equipment Location In line between the stock piping an inlet pipe section of
the header.
Equipment Location Mounts just after the headbox flow on the two edges.
Included
Equipment Location Spans the width of the headbox front to back and a
ladder to either the forming walking surface elevation or
to the floor elevation.
Q.ty 38 valves.
Item Reference
Tolerances ISO
Surface roughness ISO/R468
ISO 1302
Metric thread ISO 68
ISO 261
ISO 262
Pipe thread ISO 7/1
ISO 228/1
Shaft ends, keys and keyways ISO/R775
ISO/R 773
Structural steel DIN 17100
ISO/R 630
Tempered steel DIN17200
ISO/R 683
Hardened steel DIN 17210
Stainless steel AISI 304
AISI 304 L
Acid-proof steel AISI 316
AISI 316 L
Gray cast iron ISO/R 185
DIN 1691
Spheroidal graphite cast iron ISO 1083
DIN 1693
General cast steel ISO 3755
DIN 1681
Screws and nuts ISO
DIN
UNI
Anti-friction bearings ISO
DIN
Lubricating nipples DIN 3404
DIN 7141 2
Flanges ISO 2084
DIN 2501 Bl. 1
C.3.1 GENERAL
C.3.2 HEADBOX
Consumption figures
P&I diagrams
Process description
Instrument list
Loop diagrams
Shipment schedule
E.4 COMMISSIONING
At the end of the start-up period, when the supplied paper machine
and associated auxiliary system have been put into regular
operation, the start-up specialist and the authorized personnel of the
Purchaser will jointly sign a Commissioning Certificate. Should, for
reasons not depending in the Seller’s responsibility, the regular
production of the equipment not be attained at the end of the start-up
period, then a commissioning, or acceptance test will have to be
carried out, as regulated by the relevant clauses of the Contract. In
Start-up 1 7 7
Training on site 1 3 3
Performance test 1 3 3