0% found this document useful (0 votes)
30 views19 pages

E-Commerce Website Diary

The document provides a certificate for students who completed a project on an E-commerce shopping website. It also includes appendices that outline the project assessment criteria and provide a sample project diary format. The project involved developing a website for online shopping.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views19 pages

E-Commerce Website Diary

The document provides a certificate for students who completed a project on an E-commerce shopping website. It also includes appendices that outline the project assessment criteria and provide a sample project diary format. The project involved developing a website for online shopping.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 19

Appendix -A

CERTIFICATE

This is to certify that Ms.Kidile Shweta Suresh, Ms. Jagtap Nikita


Shivaji, Ms.Ghodake Sakshi Tanaji, Ms.Saravade Shweta Tanaji from
Shri Vishweshwarayya Abhiyantriki Padvika Mahavidyalaya, Almala
Institute having Enrollment No: 2110950157 , 2210950462, 2110950058,
2110950058 has completed project
of final year having title “E-COMMERCE SHOPPING

WEBSITE”.During the academic year 2023-2024. The

project completed in a group consisting of 04 persons under the guidance of


the
Faculty Guide.

Name & Signature of Guide:


Mrs. Giri.P.G

Name & Signature of HOD :


Mr.Kazi A.S.M
Appendix-B

PROGRESSIVE ASSESSMENT (PA) OF CAPSTONE PROJECT –


EXECUTION
AND REPORT WRITING

Evaluation Sheet (ESC) For Internal


Assessment

Name of Student:. Ms. Kidile Shweta Suresh, Ms. Jagtap Nikita Shivaji, Ms.Ghodake Sakshi
Tanaji, Ms.Saravade Shweta Tanaji.

Name of Program: - Computer Engineering. Semester: Sixth

Course Title and code: - Capstone Project: Execution and Report Writing Code:22060.

Title of the Capstone Project: “E-COMMERCE SHOPPING WEBSITE.”

A. POs addressed by the Capstone Project (Mention only those predominant POs)
a) Computer Software and Hardware Usage: Use state-of-the-art technologies for
operation and application of computer Software and Hardware.

b) Computer Engineering Maintenance: Maintain computer engineering related


software and hardware system.

c) Project Management: Use engineering management principles individually, as a


team member or a leader to manage projects and effectively communicate about
well-defined engineering activities.

B. COs addressed by the Capstone Project (Mention only those predominant POs)
a) Select, collect and use required information/knowledge to solve the
problem/complete the task.

b) Considered the ethical issues related to the project.

c) Assess the impact of the project on society.

d) Prepare ‘Project Proposals’ with action plan and time duration scientifically before
beginning of project.

e) Write the problem/task specification in existing systems related to the occupation.


C.Other learning outcomes achieved through this project
1. Unit Outcomes (Cognitive Domain)
f) Knowledge- ability to recall or recognize data/information.
g) Comprehension- the ability to understand and to grasp the meaning of information

h) Evaluation- ability to judge the value or importance of material.


i) Analysis- the ability to break down material into its parts so that its organizational structure
may be understood.

2. Practical Outcomes (in Psychomotor Domain)


a) Adaptation- the ability to modify learned skills to meet
new or special requirements.
b) Organization- the ability to create new movement for a
specific situation or problem.

c) C) Guided response- able to learn the skill and involves


limitation and trial and error.

3. Affective Domain Outcomes


i. Ability to see the value or worth of something and express it.

ii. Putting together different values, information and ideas then relating them to
already held beliefs create unique value system
iii. Actively participating in learning process.

PROGRESSIVE ASSESSMENT (PA) Sheet


Sr. Criteria Marks
No.
1 Project Proposal / Identification
2 Punctuality and overall contribution
10
3 Project Diary
4 Execution of Plan during sixth semester
5 Report writing including Documentation. 10

6 Presentation 05
Total 25

Appendix-B
Suggest Rubric for Capstone Project – Execution and Report Writing

Appendix-C
Suggestive Projects Dairy Format

Week no: 1 Date: 17/07/2023 to 22/07/2023


Activities planned:
Collecting all information about Components that are required in the project.

Activities Executed:
We searched and researched about “Components that are required in the project.”and checked
the Software required to build the project.
We studied about the working and Function of the project and asked our guide about it.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

INFORMATION ABOUT
COMPONENTS
LAPTOP :

Creating a project, especially one that involves tasks like web development,
programming, graphic design, or even data analysis, often requires a reliable
and capable laptop. An Intel Core i5 processor is a popular choice for such
projects due to its balance of performance and affordability. Let's delve into
how an i5-equipped laptop can be beneficial for creating a project:

An Intel Core i5 processor provides a solid foundation for various project


types, offering a blend of processing power and efficiency. For instance, when developing a website,
the i5's multi-core capabilities allow for smoother coding and faster rendering of web pages. Its
performance shines when compiling code, running virtual machines for testing, or working with

VS CODE:

Visual Studio Code is a source-code editor that can be used with


a variety of programming languages, including C, C#, C++,
Fortran, Go, Java, JavaScript, Node.js, Python, Rust, and Julia. It
is built on the Electron framework, which is used to develop
Node.js web applications that run on the Blink layout engine.

XAMPP:

XAMPP is regularly updated to the latest releases of Apache,


MariaDB, PHP and Perl. It also comes with a number of
other modules, including OpenSSL, phpMyAdmin,
MediaWiki, Joomla, WordPress and more. Self-contained,
multiple instances of XAMPP can exist on a single computer,
and any given instance can be copied from one computer to
another.XAMPP is offered in both a full and a standard
version (Smaller version).
Week no: 2 Date: 24/07/2023 to 29/07/2023

Activities planned:
Define project plan based on initial research findings and feedback.
Document project requirements and specifications for each module.
Finalize project milestones and deliverables.

Activities Executed:
Brief overview of the project plan based on feedback received from stakeholders.
Documented detailed requirements and specifications for the Dashboard.
Finalized project milestones and deliverables for E-commerce shopping website.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:


Week no: 3 Date: 31/07/2023 to 05/08/2023

Activities planned:

Start designing the user interface and user experience for the Dashboard.
Create wireframes and mockups to visualize the layout and flow of the system.
Gather feedback from stakeholders and iterate on design concepts.

Activities Executed:

Initiated the design process for the Dashboard System module's user interface.
Developed initial wireframes and mockups to visualize key functionalities.
Scheduled meeting with stakeholders to gather feedback on design concepts.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:


Week no: 4 Date: 07/08/2023 to 12/08/2023

Activities planned:

Understanding the workings of components that are in project.

Activities Executed:
We created a report on the project and proposed it to the guide,guide finalized the
project based on the project proposal

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 5 Date: 14/08/2023 to 19/08/2023

Activities planned:
Set up the development environment.
Begin coding the foundational structure of each module.
Activities Executed:
Established the development environment for E-commerce shopping website ,
including or Choosing appropriate programming languages and frameworks.
Implemented basic database schema to store user information and system configurations.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 6 Date: 21/08/2023 to 26/08/2023

Activities planned:

Learn different ports of the Arduino bord that required for input/output related to project.
Activities Executed:

We searched and researched about industrial use and created a survey about it. Based on the
industrial use and survey we created the project report and literature review

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 7 Date: 28/08/2023 to 02/09/2023

Activities planned:

Develop additional features for the Dashboard.


Test new features and functionalities to identify and fix any issues.
Activities Executed:

Developed additional features for the Dashboard.


Implement a feedback mechanism for users to report issues or suggest improvements.
Conducted testing of new features to ensure they function correctly and meet requirements.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 8 Date: 04/09/2023 to 09/09/2023

Activities planned:

Refine the Dashboard based on user feedback and testing.


Implement features for creating, editing, and taking multiple-measure quality..
Activities Executed:
Incorporated feedback from initial testing to refine and Dashboard.
Enhanced user interface elements to improve usability and accessibility.
Conducted thorough testing of the module to identify and address any remaining issues or bugs.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 9 Date: 11/09/2023 to 16/09/2023

Activities planned:
Presenting our project portfolio
Activities Executed:
We made a presentation about our progress in the project till now and presented it to our
guide.The presentation contained about our report till now on the project

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 10 Date: 18/09/2023 to 23/09/2023

Activities planned:
Integrate backend APIs with fronted components to enable seamless interaction.
Test basic functionalities of the module to ensure they are working correctly.
Activities Executed:
Integrated backend APIs with frontend components to enable users to interaction.
Conducted testing of basic functionalities to verify their correctness and identify any issues.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Appendix D

Suggestive Project Diary format

Week no: 11 Date: 25/09/2023 to 30/09/2023


Activities planned:
Integrated the Dashboard with the existing E-commerce shopping website.
Ensure proper communication between different modules and components.
Conduct integration testing to identify and resolve any compatibility isssues.

Activities Executed:
Integrated the Dashboard module with E-commerce shopping website,ensuring seamlesss
Communication between components.
Addressed any compatibility issues the arose during testing to ensure smooth operation.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 12 Date:02/10/2023 to 07/10/2023


Activities planned:
Test the integrated system for end-to-end functionality and including.
Address any issues or bugs that arise during integration testing.

Activities Executed:
Conducted end-to-end testing of the integrated system to verify functionality and identify any
modules.
Addressed and resolved any issues or bugs discovered during integration testing to ensure a stable
system.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:

Week no: 13 Date: 09/10/2023 to 14/10/2023


Activities planned:
Conduct comprehensive testing of all modules to identify bugs and usability issues.
Prioritize and address identified issues,focusing on critical functionalities first.
Perform performance testing to optimize system speed and responsiveness.`

Activities Executed:
Conduct comprehensive testing of all modules to identify and prioritize bugs and usability issues.
Addressed critical issues and bugs to ensure core functionalities were functioning correctly.
Performed performance testing to optimize system speed and responsiveness,making necessary
improvements.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide:


Week no: 14 Date: 16/10/2023 to 21/10/2023

Activities planned:

We Finalize documentation for all modules including user manuals and technical guides.
Prepare for deployment by configuring servers and databases.
Deploy E-commerce shopping website to production environment and ensure smooth operation.
Conduct user training session if required a dummy module of the project.

Activities Executed:
Finalized documentation for E-commerce shopping website,including user manuals and technical
guides,ensuring comprehensive coverage of system functionality and usage instructions.
Configured servers and database according to production requirements,optimizing performance and security
measures.
Deployed E-commerce shopping website to the production environment,ensuring a smooth transition from
development to live operation.

Reason for delay if any:

Corrective measures adopted:

Remark and Signature of the Guide: