Counter Mobility
Counter Mobility
Counter Mobility
3-1
Table 2-1
Table 3-2.
3-2
OBSTACLES
Countermobility Planning
The basic principles of obstacle employment are
Support the maneuver commander's Integrate with observed fires, existing Employ in-depth and for surprise.
The supported commander must decide the effort to be used for countermobility and survivability tasks. Use Figure 3-1 to determine time and/or blade requirements for antitank ditches versus defilade positions. The following ratios are used in conjunction with Figure 3-1. HDP Ratio: ATD = and TDP = ATD (23.5) 40 Where: ATD = antitank ditch in kilometers TDP = number of turret defilade positions HDP = number of hull defilade positions Example 1: You have seven blades and 10 hours of construction time. Your task force commander needs 20 turret defilade positions (TDP) and 2,000 meters of antitank ditch. The commander wants to know if you can do the job, and if not, give your recommendation. Step 1. Enter Figure 3-1 with the number of blades and time. Find the number of hull defilade positions by reading the appropriate Iine (interpolate between Iines): HDP = 70 (see dotted Iine Figure 3-1).
Step 2. Using the ratios, convert HDP to ATD and TDP. HDP 70 ATD = = = 1.75 km 40 40 TDP = ATD (23.5) = 1.75(23.5) = 41.1 > 41 positions Step 3. Using values obtained in steps 1 and 2, construct the following graph (Figure 3-2).
NOTE: Here iS a simple method to obtain the additional time or blades required as stated above. Additional time needed: 1.1 km (requirement) HDP > HDP = 40(1.1) = 44 positions 40
Enter Figure 3.1 with seven blades and move horizontally until the 44 HDP iS found (between HDP 40 and 50) read down for additional time = 6.5 > 7 hours. Additional blades needed: Enter 10 hours (time constraint) on chart. Move up until the 44 HPD i S found (interpolation required) read number of blades needed on left = 4.5 > 5 blades. Example 2: You have 20 blades and 10 hours. How many hull defilade positions can you construct? Step 1. Since the number of blades exceed graph range, divide the blades by any number. For the example use 5. 20 NeW number of blades = = 4 blades 5 Step 2. Enter 10 hours and the new number of blades in step 1 (4 blades) on the chart to obtain HDP. HDP = 40 positions Step 3. Multiply the HDP found in step 2 (40 HDP) by number used to divide blades in step 1 (5). HDP = 40 x 5 = 200 positions Step 4. You may proceed with step 2 in Example 1 as required. 3-4
Step 4. On the constructed graph, enter 20 (number of TDPs needed) and move horizontally to the TDP versus ATD Iine. NOW move down to find out how many meters of ditch you can construct (see dotted lines on sample graph, Figure 3-2): .9 km = 900M. Step 5. Inform the task force commander that you can construct the 20 TDPs, but only 900 meters of ATD. To construct the additional 1,100 meters of ATD, you need five more blades or 7 more working hours.
Table 3-3. Wire and tape entanglement m Table 3-4. Material and labor requirements for 300-meter sections of various wire entanglements
3-5
Entanglements. Entanglements are classified according to their use. The quantity of concertina required can be estimated using the following rules of thumb:
Base
Conventional deployment along forward edge of battle area (FEBA)(Figure 3-3). -Tactical wire = (front) x (1.25) x (number of belts). -Protective wire = (front) x (5) x (number of belts). -Supplementary wire: Forward of FEBA (front) x (1.25) x (number of belts). Rear of FEBA = (2.5) x (unit depth) x (number of belts).
along perimeter (Figure 3-4). (mean perimeter) x (1.25) x (number of belts). = (perimeter) x (1.10) x (number of belts). wire = (mean perimeter) x (1.25) x (number of belts).
3-6
Ensure job site security. Organize work party into three equal crews. First two crews lay out pickets and third crew
installs pickets (open end of U toward enemy). Reorganize party into crews of two to four soldiers. Install wire in numerical order as shown in Figure 3-5. Avoid having any soldier cut off between the enemy and the fence. Ensure that wires are properly secured and tight.
apron
fence
Ensure job site security. Organize work party into three crews. First crew lays pickets (Figure 3-6). Second crew lays out concertina. Place
one roll on enemy side at every third picket and two rolls on friendly side at every third picket. Third crew installs all pickets. Reorganize party into four-soldier crews. Install concertina (Figures 3-7 and 3-8). Ensure concertina is properly tied and all horizontal wire properly installed.
standard
concertina
fence
concentina
Ensure job site security. Organize work party into four soldier crews. First crew lays out Iong pickets 3 meters (10 feet) apart and second crew installs
pickets.
Reorganize party into two-soldier teams, one team carries the reel and the other
team makes the ties.
Figure 3-9. Four-strand cattle fence as viewed from the enemy side 3-9
General purpose barbed tape obstacle (GPBTO). The barbed tape (Figure 3-10) comes in seven modules (20 meters per module) per package. One package contains 140 meters of barbed tape (single belt). The GPBTO may be installed by vehicle or by individual soldier. It should be installed in three-band belts. Anchor one end and carry the package along installation path. Gloves should not be worn during installation since barbs wiII easily penetrate them.
Other wire obstacles. Construction sequence for other wire obstacles should be from enemy to friendly and from bottom up (Figures 3-11 through 3-14).
Figure 3-11. Tanglefoot Figure 3-10. General purpose barbed tape obstacle
3-10
roadblock
3-11
Antivehicular obstacles Antitank ditches and road craters. See Figure 3-15. Refer to Chapter 6 for specific details and construction of road craters.
Log cribs. See Figures 3-16 and 3-17 and Table 3-5.
Figure
3-16.
Retangular
log
cribs
design
Figure
3-15. Antitank
ditches
3-12
Wall logs requirement - Length = roadway width Quantity = 120 + 1 D D = log diameter in inches Manpower requirement - A 20-foot wide road requires 4 to 8 engineer platoon hours when equipped with hand-tools.
3-13
Abatis.
Log hurdles. Log hurdles should be sited at steepest part of slope (Figure 3-19).
tetrahedron
MINE WARFARE Minefield Type and Development Table 3-6. Minefields types and characteristics
3-16
Conventional Reports
Minefields
All minefields are reported by the fastest secure means available and are classified SECRET when completed. Exact format may be specified by local command SOP. Intention to lay. Table 3-7. Report of intention to lay with example
3-17
Completion. See Table 3-10. A completion report should be followed by a minefield record. Table 3-10. Report of completion of minefield with example
Transfer. A transfer report IS used when minefield responsibility iS transferred between commanders. It must be signed by both commanders and include a certificate stating that receiving commander was shown or informed of all mines within the zone of responsibility and that the receiving commander takes full responsibility for all the mines within the zone. The report is sent to the higher commander who has authority over both relieved and relieving commanders. Change. A change report i S submitted when any alterations are made to a minefield for which a completion report and record have been submitted.
3-18
Figure 3-25.
3-19
Logistical requirements. NUMBER OF MINES AND MINEFIELD ROWS Step 1. The number of mines required is equal to the desired density times the minefield front. A 10 percent excess factor is included by multiplying by 1.10. Density 0.5 Front x 400 x 1.10 = 220 AT
Step 2. The number of AT mines per row is determined by dividing the minefield front by the spacing interval between AT mines (normally 6 meters between mines). 400 meters 6 meters = 66.6 AT mines per row NOTE: The resulting number is rounded DOWN to the nearest whole number. 66.6 becomes 66 AT mines per row Step 3. The number of rows needed in the minefield is equal to the number of AT mines required (step 1 ) divided by the number of AT mines per row (step 2). The resulting number is rounded UP to the nearest whole number. 220 AT mines 66 AT mines per row = 3.3 rounded UP to 4 rows NUMBER OF TRUCKLOADS The number of truckloads required for minefield emplacement depends on the type and quantity of mines and vehicular carrying capacity. See Table 3-13 (page 3-26). The number of truckloads required iS equal to the total number of AT mines divided by the truck's capacity. In this example, 5-ton dump trucks are used. Figure 3-26. Row pattern minefield 3-20 220 204 = 1.08, rounded UP to the next higher whole number = 2 truckloads
Recording. See Figures 3-32 through 3-37 (pages 3-27 througth 3-32). Standard pattern minefields Development. See Figures 3-27 througth 3-31 (pages 3-21 througth 3-24).
3-21
3-22
3-24
3-25
Logistical requirements. See Table 3-12 for barbed wire and picket requirements and Table 3-13 for truck capacity for carrying mines. STANDARD OBSTACLE MFJ (CONVENTIONAL MINES) Density Type Length (meters) Numer of mines AT APF Man-hours (experienced) Man-hours (inexperienced) .5 - .5 - .0 mines per meter of front J5 J1 J3 J4 J2 400 500 300 100 200 69 69 32 48 136 136 62 93 203 203 92 138 270 270 122 183 337 337 152 228
Table 3-12. Barbed wire and picket requirements for standard pattern minefields
STANDARD OBSTACLE MFK (CONVENTIONAL MINES) Density Type Length (meters) Numer of mines AT APF APB Man-hours (experienced) Man-hours (inexperienced) 1 - 1 - 1 mines per meter of front K1 K3 K4 K5 K2 100 400 500 300 200 124 124 124 66 99 246 246 246 130 195 368 368 368 194 291 490 490 490 258 387 612 612 612 322 483
NOTES: For MFJ and MFK standard obstacle minefields 1. Minefield iS laid in a standard pattern with an irregular outer edge. 2. Minefield depth i S 100 meters.
3-26
3-27
Recording The Department of the Army (DA) Form 1355 is used to record all conventional minefields except hasty protective minefields (Figures 3-32 through 3-37).
DA Form 1355
Figure 3-32. Standard detailed minefield record (DA Form 1355) (front) 3-28
DA Form 1355 Figure 3-33. Standard detailed minefield record (DA Form 1355) (back) 3-29
DA Form 1355 Figure 3-34. Record of point minefield with minimum information (DA Form 1355) (front)
3-30
DA Form 1355 Figure 3-35. Record of point minefield with minimum information (DA Form 1355) (back) 3-31
DA Form 1355 Figure 3-36. Record of mines emplaced in ford deeper than 0.6 meter (front)
3-32
DA Form 1355 Figure 3-37 Record of mines emplaced in ford deeper than 0.6 meter (back) 3-33
Minefield markings Marking sets. The hand emplaced minefield marking set (HEMMS) is capable of marking 700 to 1,000 meters and is normally used for temporary marking The US No. 2 minefield marking set iS capable of marking 400 meters per set and is used to replace HEMMS if the minefield is to be left in place for more than 15 days. Marking procedures. Minefields are normally marked to prevent friendly personnel from accidentally entering the minefield. Figures 3-38 through 3-40 represent typical markings and marked minefield perimeters and lanes. Scatterable minefields will be marked to the maximum extent possible to protect friendly troops. The same marking procedures for conventional minefield will be used. Marking requirements are shown in Table 3-15 (page 3-37)
Standard
Scatterable Minefields scatterable minefield STANDARD OBSTACLE MFG (GEMSS SCATTERABLE MINES)
ANTITANK MFGT ANTIPERSONNEL MFGP MIXED MFGM Width 60 meters Lenqth (meters) (If every mine of a maximurn 800 mine load IS dispensed.) NOTE: Length of minefield may be doubled when a width of 30 meters is used. Density (mines/M 2) Effort (squad hours)
13,333
2,666
1,904
1,333
533
.001 2.24
005 .45
.007 32
.01 .22
.025 .09
STANDARD OBSTACLE MFH (M56 SCATTERABLE MINES) Width 20 meters Length (meters) Area density (mines/M2) Linear density (mines/M) Time
800 .01 .2
STANDARD OBSTACLE MFAF (GATOR SCATTERABLE MINES) 1 Area of minefield is dependent upon the speed and altitude of the aircraft Normal size is 650 x 200 meters. 2 Density is dependent upon the number of canisters that are dropped As the system is used primarily for interdiction minefields, somewhat lower than normal densities (0.001 mines/M2) are normally planned. 3 Each canister (bomblet)contains 72AT and 22 AP mines Up to six canisters may be mounted on each aircraft. STANDARD OBSTACLE MFM (MOPMS SCATTERABLE MINES) Area Semicircle, 35-meter radius Number of Mines 21 Density (Mines/M .01
2
MFAT RAAMS (high angle) 400 x 400 merers coverage Purpose Harass enemy Covered by heavy, direct fire Covered by light, direct fire MFAT RAAMS (low angle) 200 x 200 meters coverage Purpose Harass enemy Covered by heavy, direct fire Covered by light, direct fire MFAP ADAM 400 x 400 meters coverage Purpose Harass enemy Covered by heavy, direct fire
STANDARD OBSTACLE MFA (ADAM RAAMS SCATTERABLE MINES) Aiming points Table 3-14 Estimated aiming points
Area Density
Number
of
Rounds
.0005 .001
3 6
NOTES: 1. Chart based on 12,000-meter range 2. Depth RAAMS 400 meters (high angle) RAAMS 200 meters (low angle) ADAM 400 meters (high/low angle) 3. BMA - less than or equal to 800 Mil See FM 6-20 for exact aiming point requirements. 3-36
.002
12
Recording
Figure 3-41. Scatterable minefield report and record, with example Marking Table 3-15. Scatterable minefield marking requirements
NOTE: Ground emplaced mines-mark prior to laying Air emplaced mines - not marked 3-37
US Mines and Fuzes See Table 3-16 through 3-18 Table 3-16. US antipersonnel mines
3-38
3-39
3-40
3-41
3-42
3-43
3-44
3-45
3-46
Table
3-18.
Firing
devices
and
trip
flare
(continued)
3-47
NOTE: M = Mobility Kill K = Crew Kill CAUTION 1. Antipersonnel tripwire may not deploy properly if mines land in mud or snow. 2. Mine antihandling devices may cause premature destruction of mines if placed on snow. 3. Mine self destruct times are classified CONFIDENTIAL and are available through unit.
3-48
EXPEDIENT
MINES through 3-54) provide design and function guidance for expedient mines. The actual construction may depend on material availability.
Improvised mine construction must consider safety, neutralization, and disarming requirements. Authorization of employment depends on the minefield in which the mine is to be used (Table 3-7, page 3-17). Figures 3-42 through 3-49 (pages 3-49
Figure 3-42 High explosive artillery shell AT mine with three different firing systems 3-49
3-50
Figure 3-44. Plate charge expedient mine Figure 3-45. Improvised claymore mine
3-51
3-52
Expedient
Firing
Devices
Figure
3-49.
Expedient 3-54
firing
devices