K.V.Manoj - Resume - Planning & Controls

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

NICMAR

CURRICULUM VITAE
Name : Venkata Manoj Kankipati
Age : 28
Address : Dr No. 3, Upadaya Nagar 3rd,
Sarovar Road, Tirupati, Andhra Pradesh
517 507.
Ph. : +91 9676967205
Email : [email protected]

1. Project Manager Cum Lead Planning & Controls – 5 Years 3 Months


2. Guest Lecturer on Career Development

To grow with a professional organization which has a healthy work environment and
OBJECTIVE contribute to the development of the company. Supporting myself and my family
financial and emotionally
TOTAL PROFESSIONAL EXPERIENCE: 5 Years 3 Months
MAJOR ACHIVEMENTS IN BAUER AG:
1. Selected for BAUER’s BST Young Professional Training Program in Dubai, UAE
2. Promoted as Project Manager
MAJOR ACHIVEMENTS IN LARSEN & TOUBRO:
1. Rated as TOP Performer at Larsen & Toubro Limited
AS GUEST LECTURER
1. Delivered Guest Lecture in Sree Vidyanikethan Engineering College on Construction Management on
Sep’22 (Certificate Attached)

COMPANY DURATION DESIGNATION WORK PROFILE


Project Manager / Project Director – Construction of Water Wells for
3 Months
BAUER Bhutan Gyalsung Infra, Bhutan
Lead Planning & Operations for Jet
1 Years 9 Months – Lead Planning - Controls & Grouting, Cut Off Wall, Piling &
Till Date Operations Ground Anchoring Works at Teesta
VI HEP, Sikkim
Execution of Permeation Grouting
Lead Planning - Controls &
8 Months Works for Arun III HEP Project,
Operations
Nepal.
BAUER AG Remote support for tendering works
in the below mentioned projects
1. Permeation Grouting for Pakal
Dul HEP, Jammu Kashmir.
Asst. Manager – Tendering & 2. Micro Piling for Shopping
9 Months
Business Development Complex, Gangtok Smart City
Project, Sikkim.
3. Micro Piling for Internal Roads,
Gangtok Smart City Project,
Sikkim.
Planning Engineer – Marine Project
– Sea Water Intake for 2X800 MW
1.5 Years Sr. Engineer - Planning
Super Critical Coal Based Uppur
Larsen & Toubro Thermal Power Project.
Construction Planning Engineer – Cut & Cover
1 Year Sr. Engineer - Planning Section for CMRL (Chennai Metro
Rail Limited)
Katni grade separator bypass lane
0.5 Years Sr. Engineer - Planning project for upline and downline,
Katni, Madya Pradesh
As Project Manager / Project Director in a leading construction company, have worked in
Construction of Wetlands at Gyalsung Academies, Bhutan, for Gyalsung Infra, my key roles and
responsibilities are as follows: Jul’22 – Till Date

As Project Manager,

• Involved in handling 20 Personals which includes 2 Expats (German Expat & Turkish Expat).
• Complete Planning for construction works management of resources for smooth execution
of works as per plan.
• Keeping company in a better position by effective client liaising by maintaining proper claim
and contractual management.
• Preparation of complete budget for the project.
• Monitoring of weekly cost and status report to have better control on cashflow.
• Arranging daily meetings with client site team for better progress.
• Assessing the risk chance analysis for complete project.
• Design of project execution strategy in an effective way to optimize cost & time.
• Preparations and Documentation for Project review meetings with Client and Employer
• Coordinating with Contracts, Design and Procurement department for smooth operations.
• To ensure timely and cost-effective execution of works without compromising quality and
safety.

Major Achievements during Work,

• Completed 100% of the job 5 days within the schedule.


• Based on the best performance, Client awarded a new project.
• Selected for BAUER’s BST Young Professional Training Program in Dubai, UAE.

As Lead Planning – Controls & Operations in a leading construction company, have worked in Ground
Improvement project Jet Grouting, Cut Off Wall, Piling & Ground Anchoring Works at Teesta VI HEP
project Sikkim, for NHPC, my key roles and responsibilities are as follows: Feb’21 - Till Date

As Planning & Operations Lead,

• Preparation of L5 construction schedule with Invoice schedule for the project & Project
progress tracking for ground improvement projects using S - Curves.
• Appointed as Deputy project manager during the non-availability of project manager &
represented the project in various project discussions and client discussions.
• Preparation of complete budget for Jet Grouting, Cut Off Wall, Piling & Ground Anchoring
Works at Teesta VI HEP project Sikkim.
• Monitoring of weekly cost and status report to have better control on cashflow.
• Master packing lists for heavy machineries at site.
• Preparation of Risk chance analysis for complete project.
• Lead project controller in terms of cost & operations.

• Design of project execution strategy in a effective way to optimize cost & time.
• Complete Contract Management, client liaising & claims preparations.
• Progress monitoring through suitable formats, Review the same in Weekly and Monthly
project meetings with top management, preparation of action plan for clearing back logs if
any.
• Preparation project quantity estimate and preparation of schedule with monthly & weekly
reconciliation statements.
• Doing Rate Analysis and Productivity Analysis for different types of work, negotiating and
finalizing rates with Sub-Contractors and getting Rate Approval from Head office.
• Issuance of LOIs to Sub contractors, Creation of Work Order and processing of bills
• Preparations and Documentation for Project review meetings with Client and Employer
• Raising client invoice with suitable backup documents.
• Coordinating with Contracts, Design and Procurement department for smooth operations.
• To ensure timely and cost-effective execution of works without compromising quality and
safety.
• Coordination with client, contractors, and execution staff for smooth operations.
• Material reconciliation of the same.
• Complete Planning for construction works management of resources for smooth execution
of works as per plan.
• Preparation of delay analysis and estimating cost impact analysis.
• Preparation of work hinderance reports for cost claims

Major Achievements during Work,

• Completed L5 schedule and submitted to client for approval.


• Completed Budget for ground improvement projects and got it approved.
• Project Progress tracking using S – Curve.
• Identification of Potentials claims.
• Resource planned and mobilized.
As Lead Planning – Controls & Operations - Remotely in a leading construction company, have worked
in Ground Improvement project Permeation Grouting Works for Arun III HEP project Nepal, for NHPC,
my key roles and responsibilities are as follows: Sep’21 – Apr’22

As Planning & Operations Lead,

• Preparation of L5 construction schedule with Invoice schedule for the project & Project
progress tracking for ground improvement projects using S - Curves.
• Preparation of complete budget for the project.
• Monitoring of weekly cost and status report to have better control on cashflow.
• Master packing lists for heavy machineries at site.
• Preparation of Risk chance analysis for complete project.
• Lead project controller in terms of cost & operations.
• Design of project execution strategy in a effective way to optimize cost & time.
• Complete Contract Management, client liaising & claims preparations.
• Progress monitoring through suitable formats, Review the same in Weekly and Monthly
project meetings with top management, preparation of action plan for clearing back logs if
any.
• Preparation project quantity estimate and preparation of schedule with monthly & weekly
reconciliation statements.
• Doing Rate Analysis and Productivity Analysis for different types of work, negotiating and
finalizing rates with Sub-Contractors and getting Rate Approval from Head office.
• Issuance of LOIs to Sub contractors, Creation of Work Order and processing of bills
• Preparations and Documentation for Project review meetings with Client and employer
• Raising client invoice with suitable backup documents.
• Coordinating with Contracts, Design and Procurement department for smooth operations.
• To ensure timely and cost-effective execution of works without compromising quality and
safety.
• Coordination with client, contractors and execution staff for smooth operations.
• Material reconciliation of the same.
• Complete Planning for construction works, management of resources for smooth execution
of works as per plan.
• Preparation of delay analysis and estimating cost impact analysis.
• Preparation of work hinderance reports for cost claims

Major Achievements during Work,

• Completed L5 schedule and submitted to client for approval.


• Completed Budget for ground improvement projects and got it approved.
• Project Progress tracking using S – Curve.
• Identification of Potentials claims.
• Resource planned and mobilized.
As Senior engineer - Planning in a leading construction company, have worked in bridge project Katni
Grade Separator Bypass Lane Project both Upline and Downline (Railway Bridge Project) for IRCON,
my key roles and responsibilities are as follows: Sep’20 – Feb’21

As planning cum commercial engineer,

• Preparation of L5 construction schedule in both MSP & Primavera (P6), Invoice schedule for
the project & Project progress tracking for bridge projects using S - Curves.
• Preparation of complete accepted cost estimate for railway bridge for Projects.
• Complete Contract Management, client liaising & claims preparations.
• Progress monitoring through suitable formats, Review the same in Weekly and Monthly
project meetings with top management, preparation of action plan for clearing back logs if
any.
• Preparation project quantity estimate and preparation of schedule with monthly
reconciliation statements.
• Preparation of project risk analysis and Job safety analysis.
• Doing Rate Analysis and Productivity Analysis for different types of work, negotiating and
finalizing rates with Sub-Contractors and getting Rate Approval from Head office.
• Issuing LOIs to Sub contractors, Creation of Work Order and processing of bills in EIP (our
internal software).
• Preparations and Documentation for Project review meetings with Client and Consultant;
Raising client invoice with suitable backup documents.
• Coordinating with Contracts, Design and Procurement department for smooth operations.
• To ensure timely and cost-effective execution of works without compromising quality and
safety.
• Coordination with contractors and execution staff for smooth operations.
• Material issue to sub-contractors and reconciliation of the same.
• Complete Planning for jetty construction works, management of resources for smooth
execution of works as per plan.
• Preparation of delay analysis and estimating cost impact analysis.

Major Achievements during Work,

• Completed L5 schedule in Primavera (P6) for bridge project and submitted to client.
• Completed L5 schedule in M.S. Projects (MSP) for bridge project and submitted to client.
• Completed accepted cost estimate for complete bridge project and got it approved.
• Project Progress tracking using S – Curve
• Resource planned and mobilized for fresh railway projects.
As Senior engineer - Planning in a leading construction company, have worked in metro project Cut &
Cover Section for CMRL (Chennai Metro Rail Limited), my key roles and responsibilities are as follows:
Apr’18 – Sep’19

As planning cum commercial engineer,

• Preparation of L5 construction schedule in MSP, Invoice schedule for the project & Project
progress tracking for metro projects using S - Curves.
• Preparation of complete accepted cost estimate.
• Complete Contract Management, client liaising & claims preparations.
• Progress monitoring through suitable formats, Review the same in Weekly and Monthly
project meetings with top management, preparation of action plan for clearing back logs if
any.
• Preparation project quantity estimate and preparation of schedule with monthly
reconciliation statements.
• Doing Rate Analysis and Productivity Analysis for different types of work, negotiating and
finalizing rates with Sub-Contractors and getting Rate Approval from Head office.
• Issuing LOIs to Sub contractors, Creation of Work Order and processing of bills in EIP (our
internal software).
• Preparations and Documentation for Project review meetings with Client and Consultant;
Raising client invoice with suitable backup documents.
• Coordinating with Contracts, Design and Procurement department for smooth operations.
• To ensure timely and cost-effective execution of works without compromising quality and
safety.
• Coordination with contractors and execution staff for smooth operations.
• Material issue to sub-contractors and reconciliation of the same.
• Complete Planning for jetty construction works, management of resources for smooth
execution of works as per plan.
• Preparation of delay analysis and estimating cost impact analysis.

Major Achievements during Work,

• Completed L5 schedule in M.S.Projects (MSP) for Metro project and submitted to client.
• Additional claims submitted and negotiated with client on approval and got it approved for
INR 8 Cr..
• Completed accepted cost estimate with monthly rolling and got it approved.
• Project Progress tracking using S – Curve
• Project carried out in peak covid phase.
As Senior engineer - Planning in a leading construction company, have worked in marine project Sea
water intake project (EPC – Marine Project) for TANGEDCO, my key roles and responsibilities are as
follows: Apr’18 – Sep’19

As planning cum commercial engineer,

• Preparation of L5 construction schedule in both MSP & Primavera (P6), Invoice schedule for
the project & Project progress tracking for EPC projects using S - Curves.
• Preparation of job cost reports only monthly basis and keeping track on cost.
• Preparation and submission of claims and getting approval from client.
• Preparation of complete cost estimate for Marine & Bridge EPC Projects.
• Complete Contract Management, client liaising & claims preparations.
• Preparation project quantity estimate and preparation of schedule with monthly
reconciliation statements.
• Preparation of EPC Billing Break up based on the construction schedule.
• Onshore pipeline works for (3 pipes of 1500mm &1200mm Diameters of total length of
1.1Km) involved in activities such as Fabrication, Hydro test, Excavation, Erection &
Backfilling including client liasoning in bill certification.
• Onshore pipeline works – Preparation of micro schedule with all the activities and
monitoring.
• Onshore Works – Involved in precast works which includes casting & stressing of PSC I –
Girder, Casting of slab, pile cap and parapet wall.
• Onshore Works – Casting of RE Wall panels and erection including all support activities.
• Offshore Works – Execution of test pile casting works and conducting pile load tests on test
piles.
• Offshore Works – Temporary bund formation works which includes sheet pile driving works
for shore protection and filling the area with suitable fill material including scheduling for
complete activities.
• Offshore Works – Execution of casting of BCIS piles and erection of precast members such
as pile cap, PSC I – Girder, Precast Slab & Parapet Wall.
• Offshore Works – Involved in erection of GRP pipelines of three numbers and carrying out
various tests on GRP pipes.
• Progress monitoring through suitable formats, Review the same in Weekly and Monthly
project meetings with top management, preparation of action plan for clearing back logs if
any.
• Preparation of project risk analysis and Job safety analysis.

• Doing Rate Analysis and Productivity Analysis for different types of work, negotiating and
finalizing rates with Sub-Contractors and getting Rate Approval from Head office.
• Issuing LOIs to Sub contractors, Creation of Work Order and processing of bills in EIP (our
internal software).
• Preparations and Documentation for Project review meetings with Client and Consultant;
Raising client invoice with suitable backup documents.
• Coordinating with Contracts, Design and Procurement department for smooth operations.
• To ensure timely and cost-effective execution of works without compromising quality and
safety.
• Coordination with contractors and execution staff for smooth operations.
• Material issue to sub-contractors and reconciliation of the same.
• Complete Planning for jetty construction works, management of resources for smooth
execution of works as per plan.
Major Achievements during Work,

• Completed L5 schedule in Primavera (P6) for Marine EPC project and submitted to client.
• Completed L5 schedule in M.S.Projects (MSP) for Marine EPC project and submitted to
client.
• Completed Project Risk Analysis using Monte – Carlo Simulation for Marine EPC project.
• Completed accepted cost estimate for complete Marine (EPC Project) and got it approved.
• Project Progress tracking using S – Curve (EPC)
• Resource planned and mobilized for fresh EPC Marine projects.

Performance Appraisals,

• Rated as TOP Performer at Larsen & Toubro Limited.


• Apprised within a year in BAUER GMBH with Salary Hike.
• Selected for BAUER’s BST Young Professional Training Program in Dubai, UAE

EDUCATIONAL BACKGROUND

YEAR OF
QUALIFICATION BOARD INSTITUTE % MARKS /CPI/CGPA
PASSING
PGP ACM NICMAR NICMAR, Hyderabad. 2018 6.90

Sree Vidyanikethan
B.Tech. Civil JNTU, Ananthapur. 2016 66.80
Engineering College

State Board, Andhra 2012


12th class Sri Chaitanya 79
Pradesh
Bharatiya Vidya Bhavan
CBSE. 2010 6.6
10th class

SUMMER INTERNSHIP

ORGANISATION LEARNINGS
L&T Construction Of Diaphragm Walls For Pump House In Lift Irrigation Projects.
Construction Of Diaphragm Walls And Subsequent Underground Structures,
L&T
Chennai Metro.
Bharath Petroleum
Water Engineering, Cochin Refinery.
Corporation Limited

NICMAR Project CLAIMS MANAGEMENT


ACADEMIC Final B.Tech Project ASSESMENT OF GROUNDWATER LEVELS IN DOSALAVANKA RIVER BASIN
PROJECTS PROBABILITY DISTRIBUTIONS OF ANNUAL MAXIMUM STREAMFLOWS OF
Mini Project GODAVARI BASIN BY L-MOMENTS
FUNCTIONAL AREAS OF Planning, Scheduling, Cost Engineering, Job Cost Reporting, Sub Contractor
PROFESSIONAL INTEREST Management, Overall Project Budgeting, MIS Reporting, Contracts
Management.
SOFTWARE PROFICIENCY MICROSOFT PROJECT, PRIMAVERA (P6) MS OFFICE, AUTOCAD, STAAD PRO.

INDUSTRY EXPOSURE

ORGANISATION LEARNINGS
APGENCO Sri Sailam Power project, Hydro power generation
Delhi Metro Operation process, Drawings

LANGUAGES KNOWN English, Telugu, Hindi, Tamil & Malayalam.

EXTRA CURRICULAR ACTIVITIES/ACHIEVEMENTS


Techniques of Erosion Control on Hill Roads at Anna University Bharathindasan Institute Of
Technology, Tiruchirappalli,
Worked in the Core Organizing Committee while the heading of Hospitality of “Mohana Mantra -
2015”, A National Level Techno Cultural Fest hosted by Sree Vidyanikethan Educational
Institutions, Tirupati.
Worked in the Core Organizing Committee while the heading of Hospitality of “Mohana Mantra -
2014”, A National Level Techno Cultural Fest hosted by Sree Vidyanikethan Educational
Institutions, Tirupati.
Active member of ANCHORING TEAM of Sree Vidyanikethan Engineering College, Tirupati.s

PERSONAL PROFILE

Name : Venkata Manoj Kankipati


Date of Birth : 31-10-1994
Father’s Name : K.Siva Rama Krishna (Executive Engineer, Tirumala Tirupati Devasthanam)
Hobbies : Driving, Travelling, Games
Languages Known : English(R/W/S), Telugu(R/W/S), Hindi(R/W/S), Tamil(S) & Malayalam(S)

Reference:

Mr. Raghavendra Sampath


Operations,
Menard.
Ph: +61 414 991 907.

Ms. Anjana Sharma


Planning Engineer,
BAUER AG.
Ph: +91 8899887468.

I hereby affirm that the information furnished in this form is true and correct.
SA EE....,,.....,
VIDYANIKETHA N
Engineering College
(Autonomous)

Prof. Dr. K . NARASIMHULU, M.Tech, Ph.D.


Professor &. Head of the Department,
Department of Civil Engineering,
Sree Vidyanikethan Engineering College, Tirupati- 517 102
Ph.: +91-9398614720 ; E-mail :[email protected]
Septem ber 17, 2022

\ TO WHOMS OEVER IT MAY CONCE RN


1
'
This is to certify that Mr. Manoj K. V, Project Manage r and Busines
Developer, BAUER Group, North-E ast Indiahas delivere d an Expert Lecture
"Construction ,Manag ement and its Career- Opport unities" Departm ent of
s
on
Civil
I
i on
Enginee ring, Sree Vidyanik ethan Engineering College,A. Rangam pet, Tirupat
Septem ber 17, 2022. His lecture was well received by student s and faculty.

Yours Sincere ly,


'
Prof. Dr. K . NARASIMHULU, M.Tech, Ph.D.
Professor & Head of the Department,
Department of Civil Eng ineering,
Sree Vidyanikethan Engineering College, Tirupati- 517 102
Ph. : +91-939 8614720 ; E-mail : narasimh ulu.k@vi dyaniket han .edu.

@ Sree Saina\h Nagar, T1rupa\i ,


Andhra Pradesh - 517 10'2..
1 + 91-877 -3066900 /01
+ 91-877-22 36712/14
6 0877-3066999
ff;. www.vidyanil<.ethan.edu

You might also like