0% found this document useful (0 votes)
32 views8 pages

Software Engg 2nd Question Bank 2024

The document discusses questions related to software engineering topics like software models, UML diagrams, software testing, project management and estimation techniques. It contains short questions to test knowledge of key concepts and longer questions requiring in-depth discussion of topics like risk management, software models and CASE tools.

Uploaded by

kumarloresh143
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views8 pages

Software Engg 2nd Question Bank 2024

The document discusses questions related to software engineering topics like software models, UML diagrams, software testing, project management and estimation techniques. It contains short questions to test knowledge of key concepts and longer questions requiring in-depth discussion of topics like risk management, software models and CASE tools.

Uploaded by

kumarloresh143
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

GITA AUTONOMOUS COLLEGE, BBSR

(Affiliated to BPUT, Odisha)


2nd Semester Examination 2024 – 25
(MCA)
Subject: SOFTWARE ENGINEERING Subject Code: MC205

Module BL CO PO
Part – I
&
Short Answer Type Questions
PSO
1 What are the important categories of software? 1 1 1 2

What do you mean by software Re- 2 1 3


2 3
Engineering?
3 Define Waterfall Model? 1 1 2 3
What do you mean by Requirement Analysis 2 2 1
4 1
and Specification?
5 What is Feasibility Study? 1 2 2 3
6 What do mean by Software Crisis? 1 1 3 2
7 Write two types of Software Products? 1 1 1 2
8 Write Shortcomings of Waterfall Model? 1 3 1 2
9 Write are the advantages of Spiral Model? 1 2 4 3
10 What is Verification? 3 3 2 3
11 What do you mean by Coupling? 2 2 1 2
12 Define UML? 2 3 1 2
13 What is DFD? 2 1 1 2
14 What are the types of Cohesion? 2 2 4 3
15 Write the shortcomings of DFD model? 2 2 2 1
16 Define Structural Design? 2 2 2 3
17 What is Dependency in class Diagram? 2 1 3 2
18 Define Stamp Coupling? 2 1 1 2
19 Write the stages of Agile Model? 1 3 2 1
20 What is Fan-in & Fan-Out? 2 1 2 3
21 Define Decision Tree? 1 2 2 1
22 What do you mean by Modularity? 2 1 2 3
23 What is Functional Cohesion? 2 3 2 3
24 Define Functional Requirements? 2 2 2 3
25 Define Software Testing? 3 3 2 3
26 Define Risk Assessment? 4 2 3 2
27 What are types of Software Cost Estimation? 4 3 2 3
Write the formula of Effort in COCOMO 2 2 3
28 4
model?
What do you mean by Cohesion and Coupling? 2 3 2
29 4
What is the scope of Software Project 3 1 2
30 4
Management?
31 Define Heuristic Estimation Technique? 4 2 4 3
32 What do you mean by Unit Testing? 3 4 2 3
33 Write the benefits of Software Testing. 3 3 1 2
34 Define SPMP Document? 4 3 1 2
35 Define CASE? 4 3 2 3
36 Define code walk-through? 3 2 3 2
37 What is Black-Box Testing? 3 2 2 3
38 Define Software Failure? 3 2 3 2
39 Define Technical Risk? 4 3 2 3
40 What is white box testing? 4 2 2 3
41 Explain about Documentation? 4 2 3 2
Writ the different types of Software 3 2 3
42 3
Maintenance?
Module BL CO PO
Part – II
&
Focussed – Short answer type Questions
PSO
What do you mean by SRS document? Write 3 1
1 down the characteristics of Good SRS 1 1
document?
Differentiate between functional and non- 2 4
2 1 2
functional Requirement.
3 Discuss about SPMP document. 4 4 2 3
4 Write short notes on formal specification. 2 3 1 3
5 Briefly discuss on 4GL technique. 1 3 1 2
6 Discuss different types of cohesion. 2 3 2 3
7 Define the Phase entry and phase exit criteria. 1 2 3 2
Differentiate between Black Box and White 2 3
8 3 2
Box Testing.
9 Briefly explain Re-engineering. 1 3 2 2
10 Distinguish between verification and validation. 3 2 2 2
What is system engineering? Write the Role of 3 1
11 1 2
system Analyst.
What is a class? write the basic building block 2 4
12 2 3
of class diagram.
Draw use case diagram for Student management 4 2
13 2 4
system.
14 Explain the project cost estimation techniques. 4 3 1 2
Differentiate between decision tree and decision 3 1
15 2 2
table.
Define coupling. Explain the types of coupling. 2 4
16 2 1
Briefly discuss the System Testing and 3 1
17 3 2
Integration testing.
What do you mean by software engineering? 2 4
18 Discuss about emergence of software 1 2
engineering.
Write the characteristic of a good software 4 2
19 2 1
design.
Write the roles and responsibility of a software 3 2
20 4 2
project manager.
Distinguish between verification and validation 2 2
21 3 2
with suitable example.
A project size of 200 KLOC is to be developed. 2 3
Software development team has average
experience on similar type of projects. The
22 project schedule is not very tight. Calculate the 4 2
effort, development time, average staff size and
productivity of the project?

What are the goals of coding? Explain the 2 3


23 3 2
characteristics of programming language.
3 1
24 Explain the Cohesion and Coupling Briefly? 3 2

Write role and responsibility of a Project 2 4


25 Manager? What are Characteristics of good 4 2
Manager?
27 Explain the Architecture of a CASE 5 3 1 2
Environment.

Part – III
Long answer type Questions
Module BL CO PO
&
PSO
What do you mean by Risk? Discuss about Risk 3 1 2
1 4
Management Technique.
Briefly discuss on V model and write the merits 2 4 3
2 1
and demerits of V model.
What is UML? Write the goal and basic 4 2 3
3 2
building blocks of UML.
Define class diagram. Draw Hospital 3 1 2
4 2
Management of class diagram.
State Use-Case Diagram. Draw Use -Case 3 2 2
5 2
diagram for Train Ticket Reservation.
Write the Basic Building Blocks of Activity 3 2 3
6 Diagram. Draw Activity Diagram of 2
Student Scholarship System.
State prototyping. Draw the block diagram of 2 2 3
7 1
prototype model and explain it.
What is a basic COCOMO model and find the 2 3 2
development duration for the following
problem: - A software company needs to
develop a project that is estimated as 1000
function points and is planning to use JAVA as
the programming language whose approximate
8 4
lines of code per function point is accepted as
50. Considering a=1.4 as multiplicative
factor, b=1.0 as exponential factor for the
basic COCOMO effort equation and c=3.0 as
multiplicative factor, d=0.33 as exponential
factor for the basic COCOMO.
Briefly discuss about Transaction Analysis and 3 2 2
9 2
Transform Analysis.
Explain Evolutionary model. Write their 3 2 3
10 1
advantages and disadvantages.
Explain Computer aided software 3 2 3
11 engineering? What are the different case tools 5
are used in a
software lifecycle process.
12 Explain the Iterative Waterfall Model briefly. 1 2 2 3
Explain Computer aided software engineering? 2 3 2
13 What are the different case tools are used in 5
a software lifecycle process.
What do you mean by Data Flow Diagram? 3 2 3
14 Write the Rules and Symbol for constructing 2
DFD.
State and illustrate Agile software development? 2 2 3
15 1
Write the example of Agile process model.
Write short notes on: 2 3 2
16 a. System Testing 3
b. Integration Testing
What do you mean by Testing? Briefly discuss 3 2 2
17 3
about White box testing & Black box testing.
Define project planning and discuss about 3 2 3
18 project planning Activity. Draw the 4
preceding
order of planning activity.
2 2 3
19 Who is Project Manager? Explain the 2
responsibilities of Project Manager.
20 Discuss about the different types of COCOMO. 4 2 3 2