Quality Control in Shipbuilding
Quality Control in Shipbuilding
Process
By
Tanawat Sirisatien
Head of Quality Assurance / Control
Bangkok Dock 1957 Company Limited
Introduce
Lloyd’s Register International (Thailand) Ltd.
Position: Senior Marine Surveyor
Service: 8 Years
Graduation
King Mongkut's University of Technology North Bangkok, KMUTNB
Master degree: Welding Engineering
Khon Kaen University, KKU
Bachelor degree: Mechanical Engineering
Professional Engineer: สาม ัญวิศวกรเครือ่ งกล สก.3941
Agenda
1. Introduction quality control in Ship building and Ship repair
2. Quality control between Shipyard and Classification Society
- Plan approval process
- Material and equipment according to Class requirement
- Type of certificate for material and equipment
- Quality control
3. Quality control for Hull
4. Quality control for Machinery and Electrical
5. Quality control for Statutory
6. Ship entry to Class and Ship certificates
7. Ship in service and Classification Society
Introduction quality control in Shipbuilding
and Ship repair
Initial Assessment
Description of Vessel Plans appraisal according to
- Hull number - Contract
- Dimension - Notation
- Principal characteristics - Statutory / Flag requirement
Performance - Class rule and regulation requirement
- Speed - Hull
- Deadweight - Machinery and Electrical
- FO consumption - Statutory (Fire & Safety, Loadline,
Regulator requirements Solas, MARPOL, Etc.
- Classification and Statutory
Location
- Flag for registration of the
vessel Delivery
List of documents - Issue documents (DAD)
- Detailed specification - State plan status: AQS, AQP
- Plans - AQP to be closed prior project
completed
All of above were stated in
the construction contract
Plan Approval Process
What plan require for appraisal?
Hull
- Midship sections showing longitudinal and transverse material.
- Profile and decks.
- Shell expansion.
- Oil tight and watertight bulkheads.
- Propeller brackets.
- Double bottom construction.
- Pillars and girders.
- Aft end construction.
- Engine room construction.
- Engine and thrust seatings.
- Fore end construction.
- Hatch coamings
- Hatch cover construction.
- Welding.
- Bilge keels showing material grades, welded connections and detail design
And other according to Class requirement. (LR/Ship rule/Pt.3/Sec.5/Item 5.2)
Material and equipment according to Class
requirement
Material approval process, normally depend on Society requirements.
For LR Manufacture have two schemes.
1. The Materials Survey Scheme
2. The Materials Quality Scheme
The Materials Survey Scheme
- Materials according to Ch. 3 to Ch. 10 of LR Material rules
Chapter 3 Rolled Steel Plates, Strip, Sections and Bars
Chapter 4 Steel Castings
Chapter 5 Steel Forgings
Chapter 6 Steel Pipes and Tubes
Chapter 7 Iron Castings
Chapter 8 Aluminium Alloys
Chapter 9 Copper Alloys
Chapter 10 Equipment for Mooring and Anchoring
Material and equipment according to Class
requirement
System certify of the Material Survey Scheme
LR Manufacturer's
certificate
Certificate validated by LR
Manufacturer's
certificate issued
Manufacturer's
under the
certificate
Materials Quality
Scheme
Material and equipment according to Class
requirement
LR Certificate
This type of certificate is issued by
LR based on the results of testing
and inspection being satisfactorily.
Material and equipment according to Class
requirement
Manufacturer's certificate
validated by LR
- Under Material Survey Scheme
- Product certificate must
authorise by attending Surveyor
Material and equipment according to Class
requirement
Manufacture certificate under material survey scheme
Material and equipment according to Class
requirement
Manufacturer's certificate
issued under the Materials
Quality Scheme
Quality Control During Construction Process
(Shipyard Process)
Shipyard Quality
- Shipyard Standard
- Rule and regulation
- Method
- ITP
- WPS & PQR
Standard - Test procedure
- Welding equipment - Etc.
- Lifting
- Transportation
- Workshop
- Etc.
- Welder
- Fabricator & Fitter
- Inspector
- Contractor
- NDE
- Etc.
Facilities
Workmanship
condition
Quality Control for Hull
Hull Survey
• Contract review
• Team member
Before • PSPM (Pre Site Project Manager) Note
Construction • Survey budget
• Material Survey
• Cutting, Assembly, Fabrication, Erection
During • Plans and comment status control
Construction • Structure and weld test: NDE, Tank test Etc.
• Certificates
• Budget summary
• All of hull report: NDE, Comment, DAD status etc.
After
Construction • As built
• Service feedback
Material On Site Survey (Major)
Steel Plate
- Identify on plate compare with product
certificates: Grade, heat no., size
- Stamp on plate
- General examination: damage, thickness,
dimension, stock condition
Material On Site Survey (Major)
Welding Consumable
- IACS approved
- Appropriate grading
- Certificate
During Construction
Support documents
1. Marine Design Appraisal Document, AQP & AQS
2. Plan updated
3. IACS No.47 (Shipbuilding and repair quality
standard)
4. Shipyard standard
5. ITP (Inspection Test Plan)
6. Rule and regulation intend to survey
During Construction
Block Fit-Up and Assembly
1. Edge preparation
2. Structure Alignment
3. Confirmation structure and member
4. Welding visual inspection before painting work
5. NDE (PT, RT, UT)
6. Forming
7. Dimension check
During Construction
Hull Erection
1. Mismatch and Alignment of each structure member
2. Distortion and deformation
3. Welding and NDE
4. Finish work
During Construction
Welding and NDE
Essential things
- WPS and PQR
- WQT (Welder Qualification Test)
- NDE plan approved
- NDE procedure approved
- Appropriate NDE method
- NDE operator certificate (Level I, II and III)
- NDE report
During Construction
NDE Plan
During Construction
Hull survey failed-1
During Construction
Hull survey failed-2
During Construction
Joint preparation poor
During Construction
Welding defect
Structure Test
Tank leak test
Class
Excusive
review case
Ship data
base
uploaded to
system
Ship Certificate
Type of Ship Certificate