Typical Estimate For Construction of Multi Arch Butress Check Dam in Bidar Dist

Uploaded by

Ibrahim Danish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
61 views3 pages

Typical Estimate For Construction of Multi Arch Butress Check Dam in Bidar Dist

Uploaded by

Ibrahim Danish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TYPICAL ESTIMATE FOR CONSTRUCTION OF MULTI ARCH BUTRESS

CHECK DAM IN BIDAR DIST.

Sl no Perticulars NO. L. B. D. Qty. Rate Amount


1 2 3 4 5 6 7 8 9
1 Site clearance at the work spot,
upsteam and downsteam side L.s. Rs 1000=00
2 Earthwork excavation for fondation
such as cut off trenches,rock toe
toe drain, fondn of waste wier,etc.
and removing the excavated stuff
to a dist.of 50m. And lift upto 1.50m.
in all soils boulders upto 300mm
size in any direction.
In hard soil
Levelling of bed
From ch 3.5 to20.5 RL 98.70-97.60 1 17.0 4.5 1.10 84.15
front cutoff wall of arches 4 5.38 0.6 1.00 12.91
rear cut off wall 1 17.3 0.2 0.30 10.38
End Butress wall 2 1.2 0.6 1.00 1.44
Middle butress wall 3 0.9 0.6 1.00 1.62
Stilling basin 1 17.3 1.7 0.45 12.85
Key wall 2 1.5 0.6 2.05 3.69
Obstruction removal on U/S side 1 15.0 10.0 0.50 75.0
202.04cum
MI DSR 2000-01 it no.2.4 pno.20 60.13 Rs 12149=00
Basic rate Rs 38.88
Head lead upto 200m. 21.25
Rs 60.13
2 Providing and layingtrap jelly cc
(1:4:8) with 40mm and downsize
jelly and clean sieved appd. Sand
for fondation including mixing laying
and tamping and curing etc.
foundation of arch 4 5.38 0.60 0.15 1.94
End butress wall 2 1.2 0.60 0.15 0.22
Middle butress wall 3 0.9 0.60 0.15 0.24
In between arch portion 4x2/3x4.25x1.40 0.15 2.38
In between butress 4 4.1 0.90 0.15 2.21
for D/S side cut off wall 1 17.3 0.2 0.3 1.04
8.03 cum
It no. 5.2 pno. 29 Rs 1010.76 Rs 1166.81 Rs 9369=00
L/c for metal0.96x108.60 104.25
L/c for sand 0.48x68.25 32.76
L/c forcement0.175x108.8 19.04
Total Rs 1166.81
4 Providing and layingCC(1:2:4) prop
by using 20mm and downsize with
clean sieved appd sand including
mixing,laying,vibrating and smooth
contd…2
..2..
1 2 3 4 5 6 7 8 9
finishing to exposed faces in cm
(1:4) including curing etc. complete
Raft for arch 4 5.38 0.6 0.15 1.94
Raft for butress 2 1.2 0.6 0.15 0.22
……do…… 3 0.9 0.6 0.15 0.24
Key wall 2 1.5 0.15 3.2 1.44
Top of arches 4x2/3x4.25x1.40x0.075 1.19
5.03
Stilling basin 1 17.3 1.85 0.15 4.80
Down stream cut off wall 1/2x17.3x0.15+0.45x0.15 1.56
11.39cum
It no.5.7 pno. 29 Rs 1930.32 2196.69 Rs 25020=00
L/c for metal0.9x108.6 97.74
L/c for sand 0.45x296.50 133.42
cement0.3237x108.8 35.21
Rs 2196.69
5 Providing and layingCC (1:1.5:3)
prop. For RCC works with 12mm
and downsize jelly with clean sieved
appd. Sand including machine mixing
laying,vibrating with necessary
centering and formwork and smooth
finishing to exposed faces in cm(1:3)
including curing etc. complete.
For arches 4 5.38 0.12 2.2 5.68
Butress wall end side 2 1.2 0.15 0.70 0.25
Butress wall end side 2/2x 1.2 1.8 0.15 0.32
Butress wall middle 2 0.9 0.15 0.7 0.19
Butress wall middle 2/2x 0.9 1.50 0.15 0.20
6.64 cum
PHE DSR2002-03 4051.97 Rs 26905=00
It no. 2.8.2 pno.59 Rs 3600.00
L/c for metal0.85x108.60 92.31
L/c for sand 0.41x296.5 121.56
L/c for cem.0.415x108.8 45.15
total Rs 3859.02
Add 5% area wt. 192.95
Total Rs 4051.97
6 Cost of steel
app. 0.5% of itno. 4&5 5.03+6.64 I.e. 11.67cum 6.00 qtl.
2000/-MR Rs 12000=00
7 Labour charges for fabrication of
steel bars including straightening
cutting bending, laying in position
hooking,laping in position binding
with approved quality of binding
wire etc. complete.
contd….3
…3…
1 2 3 4 5 6 7 8 9
Qty. same as it no.5
PWD DSR 2002-03 6.00qtl. 262.5 Rs 1575=00
It no.1.1 pno.15 Rs 250.00
Add 5% area wt. 12.50
Rs 262.50
8 Providing boulder filling below
apron with trap boulders 15cm to
90cm size with an initial lead of
50m. And lift upto 1.5m.
Arch portion 4x2/3x4.10x1.35x1.30 19.19
In between butress wall 4 4.1 0.65+0 1.3 6.93
2 26.12
It no.1.4.3 pno.26 Rs 51.84 Rs 196.44/cum Rs 5131=00
Lead for boulders 108.60
loading&unloading 36.00
Rs 196.44
9 Providing and constructing trap size
stone masonary in courses not
less than 20cm high with bond
stones 2m. Apart in each course
including curing etc.in cm(1:6)
In between butress wall 4 4.1 1.6 0.25 6.56 cum
868.18 Rs 5695=00
It. No.6.2.2 pno.30 Rs 727.32
l/c for stone1.05x108.6 114.03
l/c for sand 0.28x68.25 19.11
l/c for cem.0.071x108.8 7.72
Total Rs868.18
10 Providing pointing to stone mason
ary in cm(1:3) prop. Including
racking joints including, scaffolding
and curing etc. complete.
In betn. Butress wall 4 4.1 1.6 26.24 sqm
It no. 1.7.2 p no.30 Rs 27.12 27.92 Rs 733=00
l/c for sand0.002x296.5 0.59
cement 0.00191x108.8 0.21
Rs 27.92
11 Add L.S. for other unforceen items Rs 423=00
Grand Total Rs 1,00000=00