0% found this document useful (0 votes)
38 views34 pages

Pick Up Current

The document discusses key terms related to electrical protective relays including pick up current, current setting, plug setting multiplier, and time setting multiplier. It provides details on how each term is defined and calculated, and how time of operation is determined based on these settings and fault current levels.

Uploaded by

daniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views34 pages

Pick Up Current

The document discusses key terms related to electrical protective relays including pick up current, current setting, plug setting multiplier, and time setting multiplier. It provides details on how each term is defined and calculated, and how time of operation is determined based on these settings and fault current levels.

Uploaded by

daniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 34

Pick Up Current | Current Setting | Plug Setting

Multiplier and Time Setting Multiplier of Relay


During study of electrical protective relays, some special terms are
frequently used. For proper understanding, the functions of different
protective relays, the definition of such terms must be understood
properly. Such terms are,
1. Pick up current.
2. Current setting.
3. Plug setting multiplier (PSM).
4. Time setting multiplier (TSM).
Pick Up Current of Relay
In all electrical relays, the moving contacts are not free to move. All the
contacts remain in their respective normal position by some force applied
to them continuously. This force is called the controlling force of the relay.
This controlling force may be the gravitational force, may be a spring force,
or may be a magnetic force.
The force applied to the relay’s moving parts for changing the normal
position of the contacts is called deflecting force. This deflecting force is
always in opposition of controlling force and is present always in the relay.
Although the deflecting force always presents in the relay directly
connected to live line, as the magnitude of this force is less than controlling
force in normal condition, the relay does not operate. If the actuating
current in the relay coil increases gradually, the deflecting force in
electromechanical relay is also increased. Once, the deflecting force crosses
the controlling force, the moving parts of the relay initiate to move to
change the position of the contacts in the relay. The current for which the
relay initiates its operation is called pick up current of relay.

Current Setting of Relay


The minimum pick up the value of the deflecting force of an electrical relay
is constant. Again the deflecting force of the coil is proportional to its
number of turns and the current flowing through the coil.
Now, if we can change the number of active turns of any coil, the required
current to reach at minimum pick value of the deflecting force, in the coil
also changes. That means if active turns of the relay coil are reduced, then
proportionately more current is required to produce desired relay
actuating force. Similarly, if active turns of the relay coil are increased, then
proportionately reduced current is required to produce same desired
deflecting force.

Practically same model relays may be used in different systems. As per


these system requirements, the pickup current of the relay is adjusted. This
is known as the current setting of the relay. This is achieved by providing
the required number of tapping in the coil. These taps are brought out to a
plug bridge. The number of active turns in the coil can be changed by
inserting a plug in different points in the bridge.
The current setting of relay is expressed in percentage ratio of relay pick
up current to the rated secondary current of CT.

That means,

For example, suppose, you want that, an over current relay should operate
when the system current just crosses 125% of rated current. If the relay is
rated with 1 A, the normal pick up current of the relay is 1 A and it should
be equal to secondary rated current of current transformer connected to the
relay.
Then, the relay will be operated when the current of CT secondary becomes
more than or equal to 1.25 A.
As per definition,

The current setting is sometimes referred as current plug setting.


The current setting of overcurrent relay is generally ranged from 50 % to
200 %, in steps of 25 %. For earth fault relay it is from 10% to 70% in steps
of 10%.
Plug Setting Multiplier of Relay

Plug setting multiplier of relay is referred as ratio of fault current in the


relay to its pick up current.
Suppose we have connected on protection CT of ratio 200/1 A and current
setting is 150%.
Hence, pick up current of the relay is, 1 × 150 % = 1.5 A
Now, suppose fault current in the CT primary is 1000 A. Hence, fault
current in the CT secondary, i.e., in the relay coil is, 1000 × 1/200 = 5A
Therefore PSM of the relay is, 5 / 1.5 =3.33
Time Setting Multiplier of Relay
The operating time of an electrical relay mainly depends upon two factors :

1. How long distance to be traveled by the moving parts of the


relay for closing relay contacts and
2. How fast the moving parts of the relay cover this distance.
So far by adjusting relay operating time, both of the factors to be adjusted.
The adjustment of traveling distance of an electromechanical relay is
commonly known as time setting. This adjustment is commonly known as
time setting multiplier of relay. The time setting dial is calibrated from 0
to 1 in steps of 0.05 sec.
But by adjusting only time setting multiplier, we cannot set the actual time
of operation of an electrical relay. As we already said, the time of operation
also depends upon the speed of operation. The speed of moving parts of
relay depends upon the force due to the current in the relay coil. Hence, it
is clear that the speed of operation of an electrical relay depends upon the
level of fault current. In other words, the time of operation of the relay
depends upon plug setting multiplier. The relation between time of
operation and plug setting multiplier is plotted on a graph paper, and this
is known as time/PSM graph. From this graph one can determine the total
time taken by the moving parts of an electromechanical relay, to complete
its total traveling distance for different PSM. In time setting multiplier, this
total traveling distance is divided and calibrated from 0 to 1 in steps of 0.05.
So when the time setting is 0.1, the moving parts of the relay have to travel
only 0.1 times of the total traveling distance, to close the contact of the
relay. So, if we get the total operating time of the relay for a particular PSM
from time/PSM graph and if we multiply that time with the time setting
multiplier, we will get, the actual time of operation of the relay for said
PSM and TSM.
For getting a clear idea, let us have a practical example. Say a relay has a
time setting 0.1 and you have to calculate actual time of operation for PSM
10.
From the time / PSM graph of the relay as shown below, we can see the
total operating time of the relay is 3 seconds. That means the moving parts
of the relay take total 3 seconds to travel 100 % traveling distance. As the
time setting multiplier is 0.1 here, actually the moving parts of the relay
have to travel only 0.1 × 100% or 10% of the total travel distance, to close
the relay contacts.
Hence, actual operating time of the relay is 3 × 0.1 = 0.3 sec. i.e. 10% of 3 sec.
Time vs. PSM Curve of Relay
This is relation curve between operating time and plug setting multiplier of
an electrical relay. The x-axis or horizontal axis of the Time/PSM graph
represents PSM and Y-axis, or vertical axis represents the time of operation
of the relay. The time of operation represents in this graph is that, which
required to operate the relay when time setting multiplier set at 1.
From the Time/PSM curve of a typical relay shown below, it is seen that, if
PSM is 10, the time of operation of the relay is 3 sec. That means the relay
will take 3 seconds to complete its operation, with the time setting 1.
It is also seen from the curve that, for a lower value of plug setting
multiplier, i.e., for a lower value of fault current, the time of operation of
the relay is inversely proportional to the fault current.
But when PSM becomes more than 20, the operating time of relay becomes
almost constant. This feature is necessary to ensure discrimination on very
heavy fault current flowing through sound feeders.

Calculation of Relay Operation Time


For calculating actual relay operating time, we need to know these
following operations.

1. Current setting.
2. Fault current level.
3. Ratio of current transformer.
4. Time / PSM curve.
5. Time setting.
Step-1
From CT ratio, we first see the rated secondary current of CT. Say the CT
ratio is 100 / 1 A, i.e. secondary current of CT is 1 A.
Step-2
From current setting we calculate the trick current of the relay. Say current
setting of the relay is 150 % therefore pick up current of the relay is 1 ×
150% = 1.5 A.
Step-3
Now we have to calculate PSM for the specified faulty current level. For
that, we have to first divide primary faulty current by CT ratio to get relay
faulty current. Say the faulty current level is 1500 A, in the CT primary,
hence secondary equivalent of faulty current is 1500/(100/1) = 15 A

Step-4
Now, after calculating PSM, we have to find out the total time of operation
of the relay from Time/PSM curve. From the curve, say we found the time
of operation of relay is 3 second for PSM = 10.

Step-5
Finally that operating time of relay would be multiplied with time setting
multiplier, in order to get actual time of operation of relay. Hence say time
setting of the relay is 0.1.
Therefore the actual time of operation of the relay for PSM 10, is 3 × 0.1 =
0.3 sec or 300 ms.
Dcldulctkie
ia Ivbr
Durrbet
Vblcy Tbtt
keo0
(3) Liw ivbr
Durrbet
Tbttkeo0
(K5)

Ivbr Lich Durrbet


(Ke) 7 Abbhbr Lich
Durrbet ] Vblcy
sbttkeo 7 4=8 ]
362% 78=: Cgp

Vbqukrbh Ivbr Lich


Vblcy Zluo
Tbttkeo7 Ivbr Lich
Durrbet (Ke) / DX
Zrkgcry Durrbet

Vbqukrbh Ivbr Lich
Vblcy Zluo Tbttkeo
7 8=: / 1:: 7 :.=

Zkdn up Tbttkeo ia
Ivbr Durrbet Vblcy
(ZGT) (K5)7 DX
Tbdiehcry
Durrbet ] Vblcy
Zluo Tbttkeo

Zkdn up Tbttkeo ia
Ivbr Durrbet Vblcy
(ZGT) (K5)7 3 ] :.= 7
:.= Cgp

Zluo Tbttkeo
Gultkplkbr (ZTG) 7
Gke. Abbhbr Acult
Durrbet / (ZGT ]
(DX Zrk.
Durrbet / DX
Tbd. Durrbet))

Zluo Tbttkeo
Gultkplkbr (ZTG) 7
33::: / (:.= ] (1:: /
3)) 7 66.;6

Ipbrctkie Xkgb ia
Vblcy cs pbr kt‛s
Durvb

Ipbrctkeo Xkgb ia
Vblcy air Qbry
Kevbrsb Durvb (t)
734.2 / ((ZTG)-3).

Ipbrctkeo Xkgb ia
Vblcy air Bxtrbgb
Kevbrsb Durvb (t)
7=:/ ((ZTG)6 -3).

Ipbrctkeo Xkgb ia
Vblcy air Lieo Xkgb
Kevbrsb Durvb (t)
736: / ((ZTG) -3).

Ipbrctkeo Xkgb ia
Vblcy air Eirgcl
Kevbrsb Durvb
(t) 7:.38 /
((ZTG) :.:6 -3).

Ipbrctkeo Xkgb ia
Vblcy air Eirgcl
Kevbrsb Durvb
(t)7:.38 /
( (66.;6):.:6-3)
7 6.3? Cgp

Mbrb Xkgb Hblcy ia


Vblcy (XGT)
ks :.362 Tbd si

Cdtucl ipbrctkeo
Xkgb ia Vblcy (t5)
7 Ipbrctkeo Xkgb
ia Vblcy ] XGT
76.3? ] :.362
7:.6?3 Tbd

Orchkeo Xkgb ia
Vblcy 7 ^((6]Vblcy
Brrir)+DX
Brrir)]XGTW+ Ivbr
smiit+
DF Ketbrruptkeo
Xkgb+Tcabty

Xitcl Orchkeo
Xkgb ia
Vblcy7^((6]?.2)+3:)]
:.362W+:.:2+:.3?
+:.44 7 :.2= Tbd

Ipbrctkeo Xkgb ia
Zrbvkius upstrbcg
Vblcy 7 Cdtucl
ipbrctkeo Xkgb ia
Vblcy+ Xitcl
OrchkeoXkgb
Ipbrctkeo Xkgb ia
Zrbvkius up Ttrbcg
Vblcy 7 :.6?3 + :.2=
7 :.=2 Tbd
(6) Mkom
ivbr Durrbet
Tbttkeo0
(K55)

Zkdn up Tbttkeo ia
Ivbr Durrbet Vblcy
(ZGT) (K55)7 DX
Tbdiehcry Durrbet
] Vblcy Zluo
Tbttkeo

Zkdn up Tbttkeo ia
Ivbr Durrbet Vblcy
(ZGT) (K5)7 3 ] 6.2
7 6.2 Cgp

Zluo Tbttkeo
Gultkplkbr (ZTG) 7
Gke. Abbhbr Acult
Durrbet / (ZGT ]
(DX Zrk.
Durrbet / DX
Tbd. Durrbet))

Zluo Tbttkeo
Gultkplkbr (ZTG) 7
33::: / (6.2 ] (1:: /
3)) 7 ?.44

Ipbrctkie Xkgb ia
Vblcy cs pbr kt‛s
Durvb

Ipbrctkeo Xkgb ia
Vblcy air Qbry
Kevbrsb Durvb (t)
734.2 / ((ZTG)-3).

Ipbrctkeo Xkgb ia
Vblcy air Bxtrbgb
Kevbrsb Durvb (t)
7=:/ ((ZTG)6 -3).

Ipbrctkeo Xkgb ia
Vblcy air Lieo Xkgb
Kevbrsb Durvb (t)
736: / ((ZTG) -3).

Ipbrctkeo Xkgb ia
Vblcy air Eirgcl
Kevbrsb Durvb
(t) 7:.38 /
((ZTG) :.:6 -3).

Ipbrctkeo Xkgb ia
Vblcy air Eirgcl
Kevbrsb
Durvb (t)7:.38 /
( (?.44):.:6-3) 7
4.88 Cgp

Mbrb Xkgb Hblcy ia
Vblcy (XGT)
ks :.3:: Tbd si

Cdtucl ipbrctkeo
Xkgb ia Vblcy (t5)
7 Ipbrctkeo Xkgb
ia Vblcy ] XGT
74.88 ] :.3::
7:.48 Tbd

Orchkeo Xkgb ia
Vblcy 7 ^((6]Vblcy
Brrir)+DX
Brrir)]XGTW+ Ivbr
smiit+
DF Ketbrruptkeo
Xkgb+Tcabty

Xitcl Orchkeo Xkgb


ia
Vblcy7^((6]?.2)+3:)]
:.3::W+:.:2+:.3?+:.44
7 :.2= Tbd

Ipbrctkeo Xkgb ia
Zrbvkius upstrbcg
Vblcy 7 Cdtucl
ipbrctkeo Xkgb ia
Vblcy+ Xitcl
Orchkeo Xkgb.

Ipbrctkeo Xkgb ia
Zrbvkius up Ttrbcg
Vblcy 7 :.48 + :.2=
7 :.=2 Tbd
Diedluskie ia
Dcldulctkie0

Zkdnup Tbttkeo ia
ivbr durrbet Vblcy
(ZGT) (K5) smiulh
fb sctksakbh
ailliwkeo Xwi
Diehktkie.

(3)
Zkdnup Tbttkeo ia
ivbr durrbet Vblcy
(ZGT)(K5) 57
Ivbr Lich Durrbet
(Ke) / DX Zrkgcry
Durrbet

(6)
XGT <7 Gkekgug
Acult Durrbet /
DX Zrkgcry
Durrbet

Air Diehktkie (3) :.=


5 7(8=:/1::)
7 :.= 57 :.=, _mkdm
aiueh
IN

Air Diehktkie
(6) :.362 <7 33:::/1::
7 :.362 <7
3=.44, _mkdm aiueh
IN

Mbrb Diehktkie (3)


ceh (6) crb
sctksakbh si

Zkdnup Tbttkeo ia
Ivbr Durrbet Vblcy
7 IN

Liw Ivbr Durrbet


Vblcy Tbttkeo0
(K5) 7 :.=C ] Ke
Cgp

Cdtucl ipbrctkeo
Xkgb ia Vblcy (t5)
7 :.6?3 Tbd

Mkom Ivbr
Durrbet Vblcy
Tbttkeo0 (K55) 7
6.2C ] Ke Cgp

Cdtucl ipbrctkeo
Xkgb ia Vblcy
(t55) 7 :.48 Tbd
Reward Your Curiosity

You might also like