3vin230778t3m002 - Statcom Indoor Layout

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

A B C D E F G H

LEGENDS:-
N 1. FALSE CEILING

2. RAISED FLOOR

3. ROLLING SHUTTER

4. FFL FINISHED FLOOR LEVEL


5 5
5. FGL FINISHED GROUND LEVEL

NOTES:-

1. ALL DIMENSIONS ARE IN MM. UNLESS OTHERWISE SPECIFIED.


2. ALL EQUIPMENT/PANEL SIZE SHOWN HERE ARE TENTATIVE, ACTUAL
DIMENSIONS SHALL BE FURNISHED AFTER RECEIPT OF RESPECTIVE
PANEL/EQUIPMENT DRAWINGS
3. FINISH FLOOR LEVEL (FFL.) OF STATCOM BUILDING GROUND WILL BE
+500MM FINISH GROUND LEVEL (FGL.) OF STATCOM BUILDING FINISHED
GROUND WILL BE +000MM.
4. THE SCHEDULE OF DOORS & WINDOWS, LOCATION OF THE COLUMNS WILL
BE FINALIZED DURING DETAIL CIVIL DESIGN & DRAWING.
5. WALL THICKNESS DETAILS ARE PRELIMINARY.
6. EQUIPMENT DETAILS IN AHU ROOM AND ROLLING SHUTTER DETAILS WILL
BE SUBMITTED.

A B C D E F
REFERENCE DOCUMENTS:-
4 4
59650 1. SINGLE LINE DIAGRAM - 3VIN230778T1S001
2. STATCOM LAYOUT - 3VIN230778T3M001
14500 14450 14500

EQUIPMENTS DETAILS
7500 3165 3550 3550 2700 1125 1000 1800 1000 2150 2150 1000 1800 1000 2700 3550 3550 3165 7500

C
DESIGNATION DESCRIPTION
Sh. 3
-BE1
ELECTRONIC CURRENT TRANSDUCER
-BE2
1 -TB1
Battery Room -1 -BE1 -BE1 -BE1 -BE1 -BE1 -BE1 Battery Room -2 IGBT VALVE
-BE2 -BE2 -BE2 D3 D3 -BE2 -BE2 -BE2
2790

2790
1950
(7500 X 6150) (7500 X 6150)
B Y R B Y R -QB1 BYPASS SWITCH
1530 2000
220V BATTERY-1

2038 1530
220V BATTERY-2

220V BATTERY-1

220V BATTERY-2
UPS BATTERY

UPS BATTERY
STATCOM 1 STATCOM 2
STATCOM-1
STATCOM-1

STATCOM-2
STATCOM-1

STATCOM-2

STATCOM-2
-TB1 -RA1 CHARGING RESISTOR

3000
500 -TB1

Partition Wall ( Future)


500 2038
UPS UNINTERRUPTIBLE POWER SUPPLY

Main Switchboard

Main Switchboard
AC Distribution Board

AC Distribution Board
D2 D2

System-1

System-2
5500
VS VOLTAGE STABILIZER

Syste-1

Syste-2

6500

1575
=E.E1 PUMP UNIT

4250

4250
1088 1100 1000 1100 1000 1100 1112

1200 100
1100 1100 1000 1100 1000 1100 1100

200
DC DB DC Charger

DC DB DC Charger
150
1950
ELDB
2050
3 AHU ROOM - 2
Door Schedule 3

100

3800
MLDB
AHU ROOM-1
OUTDOOR COOLER UNIT(HEAT EXCHANGER)

OUTDOOR COOLER UNIT(HEAT EXCHANGER)

OUTDOOR COOLER UNIT(HEAT EXCHANGER)

OUTDOOR COOLER UNIT(HEAT EXCHANGER)


4270

4270
(7500 X 10000)

DC DB DC Charger

DC DB DC Charger
(7500 X 10000)

10000
A A

1200

23250
Sh. 3 Sh. 3
SI. No Door Type Door Dimension Details
ACDB Room
(14450 X 15650) 1 D1 L2400 X H3000mm

2050

5050
2 D2 L1800 X H2400mm

3250
1500
D1 3 D3 L1200 X H2400mm
4250

4250
D3 D3
4 D4 L900 X H2100mm

1000
7200 Valve Room Valve Room
D2
(14500 X 23250) VS -RA1 -RA1 (14500 X 23250) UPS UPS
UPS UPS -RA1 -RA1 VS Room -RA1
Pump Room -1
3200 (4000 X 4000)
3000

3000
-QB1 -RA1
(7500 X 6500) (4450 X 4000) Reception Pump Room-2
2000 -QB1 -QB1 VS -QB1
(5400 X 7300) -QB1 -QB1 (7500 X 6500)
Collapsible Gate

6500
D1 Corridor Cum Service
Corridor
D1
3000

3000
(4450 X 7300)
(4000 X 3000)
2500

=E.E1 D3 D3 D3 =E.E1
1450

1450
B 4000 4000 3000 D3 B
3000 4000 4000
Sh. 3 Sh. 3
2
D1 D1 D1
3000

C
Sh. 3

2 2

7500 14500 4450 5400 4000 14500 7500 14090

59650

BEAWAR
TRANSMISSION
Ground Floor Plan LIMITED
1 1 : 150 DRAWING DOCUMENT REVIEW STATUS B
A
REVISED & UPDATED FOR APPROVAL
FIRST SUBMISSION
PK
PK
VC
VC
2024-02-28
2024-01-17
CAT-A: APPROVED
REV DESCRIPTION PREP. CHKD. DATE
CAT-A*: APPROVED WITH COMMENTS
CAT-B: APPROVED WITH COMMENTS (RE- OWNER
STERLITE POWER TRANSMISSION LIMITED
SUBMISSION REQUIRED)
THIS DRAWING IS THE PROPERTY
OF SPTL AND NOT TO BE COPIED
OR USED WITHOUT THEIR PRIOR (SPTL)
CAT-C: RETURNED FOR CORRECTION (RE-
PERMISSION.

SUBMISSION REQUIRED)
Against Note 2 , HEIL to keep necessary provision in the room to accommodate all the panels with their actual size CAT-I: FOR INFORMATION AND RECORDS EPC HITACHI ENERGY INDIA LIMITED
PURPOSE ONLY
without compromising safety and operation requiremnt CAT-I*: FOR INFORMATION AND RECORDS
PURPOSE ONLY WITH COMMENTS LOI NO. LOI/STATCOM/BTL/HEIL/01, DATED: 30.09.2023
1 LETTER NO.: SPTL/BTL/ FTG 1
± 2x300MVAr STATCOM, 4x125 MVAr MSC, 2x125 MVAr MSR
PROJECT
DATE: 12MARCH 2024 at Fatehgarh- 3 PS along with 2 nos. of 400 kV bays at Fatehgarh-3 PS
SIGNATURE: Transmission System for evacuation of power from REZ in Rajasthan
JAYACHANDRA BENDI PKG TITLE
(20GW) under phase-III part F” under Bewar Transmission Limited (BTL)
This document has been reviewed as noted with regard to general
Conformity with the Contract specifications and requirements. The DRG. TITLE STATCOM INDOOR LAYOUT (GF)
Vendor/Contractor is responsible for correctness of design,
calculations, and details. Approval of this document does not relieve DRG. NO. BTL-FTG-81-03402
the Vendor/Contractor of his responsibility in carrying out the work
correctly and fulfilling the complete requirements of the contractor nor SHEET SCALE :
HEIL DRG. NO. 3VIN230778T3M002
1 OF 4 As
A B C D E F G H indicated
SHEET : A1
A B C D E F G H

EQUIPMENTS DETAILS

Item No. Description Dimensions (mm)


+KA.1 Control System A 2315x1600x800
+KA.2 Control System A 2315x1600x800
N A B C D E F +KX.1 Station Operation and Monitoring 2315x1600x800
+KB.1 Control System B 2315x1600x800
59650 +KB.2 Control System B 2315x1600x800
S1 Spare 2315x800x800
44050
+RA.1 Relay protection Cubicle Set-1 2315x800x800
5 7500 14500 14450 14500 7500 +RA.2 Relay protection Cubicle Set-1 2315x800x800 5
+RA.3 Relay protection Cubicle Set-1 2315x800x800
+RA.4 Relay protection Cubicle Set-1 2315x800x800
1 +RA.5 Relay protection Cubicle Set-1 2315x800x800

1200
+RB.1 Relay protection Cubicle Set-2 2315x800x800
D1 +RB.2 Relay protection Cubicle Set-2 2315x800x800

3200
RA1 S1
+KC.1 +RB.3 Relay protection Cubicle Set-2 2315x800x800
RA2 +RB.4 Relay protection Cubicle Set-2 2315x800x800

+KB.2
S1
+RB.5 Relay protection Cubicle Set-2 2315x800x800
+RA.3
S1
S1 RA1 +KE.1 Valve Control Panel 2315+352x800x800
+KC.1
+RA.4
+KC.1 Common Interface Cubicle 2315x800x800

+KB.1
S1
RA2

+KB.2
+KC.2
+RA.5 +KC.2 Common Interface Cubicle 2315x800x800
S1
+RA.3
+KD.1 +KD.1 VSC Current Transducer Cubicle 2315x800x800
+RB.1

+KX.1
S1
+RA.4 +IP.1 Interface Panel 2315x800x800

+KB.1
+RB.2
+IP.3 +IP.2 Interface Panel 2315x800x800
+RA.5
+IP.3
+IP.2 +RB.3 +IP.3 Interface Panel 2315x800x800
DN

+KA.2
15650
+RB.1
+IP.2

+KX.1
+IP.1 +RB.4
+RB.2
+IP.1
+RB.5

+KA.1
S1 +RB.3

+KA.2
+KD.1
S1 +RB.4 Door Schedule
+KE.1 +KC.2
S1 +RB.5
200 SI. No Door Type Door Dimension Details

+KA.1
A 800 1000 800 2285 800 A

23250
4 Sh. 3
Open terrace above AHU Room, Open terrace above
S1 S1
Open terrace above Open terrace above AHU Room,
Sh. 3 1 D1 L2400 X H3000mm 4
Pump Room, Battery Room Valve Room Control Room D1 Valve Room Pump Room, Battery Room 2 D2 L1800 X H2400mm
(14450 X 15650)
+KE.1
3 D3 L1200 X H2400mm
4 D4 L900 X H2100mm
200 800 2285 800 1000 800 2681

Glass Window

Pantry
D3 D2 D3
Passage

Conference
Room Ladies Toilet
D3
(4450 X 7300) (1900 X 2200)

D3 Gents Toilet
D4 D4
B (1900 X 2200) B
Sh. 3 Sh. 3

2 4450 5400 1900 1900

3 3

First Floor Plan JIB ARM CRANE MOVABLE WALL ANCHOR TYPE BEAWAR
1 1 : 120 TRANSMISSION
LIMITED
DRAWING DOCUMENT REVIEW STATUS
CAT-A: APPROVED
CAT-A*: APPROVED WITH COMMENTS
CAT-B: APPROVED WITH COMMENTS (RE-
SUBMISSION REQUIRED)
CAT-C: RETURNED FOR CORRECTION (RE-
SUBMISSION REQUIRED)
CAT-I: FOR INFORMATION AND RECORDS
PURPOSE ONLY
CAT-I*: FOR INFORMATION AND RECORDS
2 PURPOSE ONLY WITH COMMENTS 2
LETTER NO.: SPTL/BTL/ FTG
DATE: 12 MARCH 2024
SIGNATURE: JAYACHANDRA BENDI

This document has been reviewed as noted with regard to general


Conformity with the Contract specifications and requirements. The
Vendor/Contractor is responsible for correctness of design, B REVISED & UPDATED FOR APPROVAL PK VC 2024-02-28

calculations, and details. Approval of this document does not relieve A FIRST SUBMISSION PK VC 2024-01-17

the Vendor/Contractor of his responsibility in carrying out the workREV DESCRIPTION PREP. CHKD. DATE
correctly and fulfilling the complete requirements of the contractor nor OWNER STERLITE POWER TRANSMISSION LIMITED
THIS DRAWING IS THE PROPERTY
OF SPTL AND NOT TO BE COPIED
OR USED WITHOUT THEIR PRIOR
PERMISSION.
(SPTL)

EPC HITACHI ENERGY INDIA LIMITED

LOI NO. LOI/STATCOM/BTL/HEIL/01, DATED: 30.09.2023


1 1
± 2x300MVAr STATCOM, 4x125 MVAr MSC, 2x125 MVAr MSR
PROJECT at Fatehgarh- 3 PS along with 2 nos. of 400 kV bays at Fatehgarh-3 PS

PKG TITLE Transmission System for evacuation of power from REZ in Rajasthan
(20GW) under phase-III part F” under Bewar Transmission Limited (BTL)
DRG. TITLE STATCOM INDOOR LAYOUT (FF)
Stair 3D
2 DRG. NO. BTL-FTG-81-03402
SHEET SCALE :
HEIL DRG. NO. 3VIN230778T3M002
2 OF 4 1 : 120
A B C D E F G H SHEET : A1
A B C D E F G H

(7.45+3.7+1.1)=12.25
A B C D MTR LVL E F

11.15 LVL( BEAM

900
Roof BOTTOM)

10.49 m
11650 1.1

800

7.76 m
0.2
14450

5 7.45 3.7 5

36.92 m
3.5Mtr

3700
31.46 m
LVL
7.45 LVL false Control Room

2667
+KA.1 +KE.1

2315
celing
height 6.85 Mtr LVL
FF_TOC 4.7

10.72 m
7.94
1.15 m
6900 0.6

550
Beam Level Beam Level

8.47 m
Valve Room -BE1 1.2 Valve Room
-BE2
TOC B Y R B Y R

8m
4700 0.6 -BE1 -BE1 -BE1 ACDB Room -BE1 -BE1 -BE1
ACDB Room -BE2 -BE2 -BE2
-BE2 -BE2 -BE2

55.62 m
5.8 1000 2150 2150 1000
1125 1000 1800 1800 1000 1125

5600
Clear

45.72 m
height 5.15
MTR
3950

33.75 m

3.6

5150
CLEAR

3569

3569
AHU ROOM-1 AHU ROOM - 2
GF_FFL Clear HEIGHT

2519

2519
2200
500 height

FGL
0
cooler height= 2038 1750 1841 1750 1841 1750 2000 1530 1530 2000 1750 1841 1750 1841 1750 2038
2.5( max)
4 7500 14500 14450 14500 7500 4

59650

False ceiling height shall be checked.


I-beam sizing to be finalized.
Section A-A
A 1 : 100
A B C D E F
Tank

900
Roof
11650

Ladies Toilet Gents Toilet

Conference
Room

3 FF_TOC 3
6900
550

Beam Level Beam Level

Valve Room Valve Room


TOC
4700
Reception
5600

Pump Room -1 Pump Room-2


Corridor Cum Service
Corridor

3500
GF_FFL
500

FGL
0

7500 14500 4000 14500 7500

59650

2 2

Section B-B BEAWAR


B TRANSMISSION
1 : 100 LIMITED
1 2
DRAWING DOCUMENT REVIEW STATUS
CAT-A: APPROVED

900
FF_TOC CAT-A*: APPROVED WITH COMMENTS
6900 CAT-B: APPROVED WITH COMMENTS (RE-
B REVISED & UPDATED FOR APPROVAL PK VC 2024-02-28
SUBMISSION REQUIRED) A FIRST SUBMISSION PK VC 2024-01-17
CAT-C: RETURNED FOR CORRECTION (RE- REV DESCRIPTION PREP. CHKD. DATE
TOC
SUBMISSION REQUIRED) OWNER
4700 R
CAT-I: FOR INFORMATION AND RECORDS THIS DRAWING IS THE PROPERTY
OF SPTL AND NOT TO BE COPIED
STERLITE POWER TRANSMISSION LIMITED
PURPOSE ONLY
OR USED WITHOUT THEIR PRIOR (SPTL)
6650

PERMISSION.
Y
CAT-I*: FOR INFORMATION AND RECORDS
B PURPOSE ONLY WITH COMMENTS EPC HITACHI ENERGY INDIA LIMITED
4065

GF_FFL 1450
LETTER NO.: SPTL/BTL/ FTG
500
DATE: 12MARCH 2024 LOI NO. LOI/STATCOM/BTL/HEIL/01, DATED: 30.09.2023
1 FGL SIGNATURE: 1
0 23250
JAYACHANDRA BEDNI PROJECT
± 2x300MVAr STATCOM, 4x125 MVAr MSC, 2x125 MVAr MSR
This document has been reviewed as noted with regard to general
at Fatehgarh- 3 PS along with 2 nos. of 400 kV bays at Fatehgarh-3 PS
Conformity with the Contract specifications and requirements. The Transmission System for evacuation of power from REZ in Rajasthan
Vendor/Contractor is responsible for correctness of design, PKG TITLE
(20GW) under phase-III part F” under Bewar Transmission Limited (BTL)
calculations, and details. Approval of this document does not relieve
the Vendor/Contractor of his responsibility in carrying out the work DRG. TITLE
Section C-C correctly and fulfilling the complete requirements of the contractor nor
STATCOM INDOOR LAYOUT (SEC)
C 1 : 100 DRG. NO. BTL-FTG-81-03402
SHEET SCALE :
HEIL DRG. NO. 3VIN230778T3M002
3 OF 4 1 : 100
A B C D E F G H SHEET : A1
A B C D E F G H

BEAWAR
TRANSMISSION
LIMITED
DRAWING DOCUMENT REVIEW STATUS
CAT-A: APPROVED
5
CAT-A*: APPROVED WITH COMMENTS 5
CAT-B: APPROVED WITH COMMENTS (RE-
SUBMISSION REQUIRED)
CAT-C: RETURNED FOR CORRECTION (RE-
SUBMISSION REQUIRED)
CAT-I: FOR INFORMATION AND RECORDS
PURPOSE ONLY
CAT-I*: FOR INFORMATION AND RECORDS
PURPOSE ONLY WITH COMMENTS
LETTER NO.: SPTL/BTL/ FTG
DATE: 12 MARCH 2024
SIGNATURE: JAYACHANDRA BENDI

This document has been reviewed as noted with regard to general


4 4
Conformity with the Contract specifications and requirements. The
Vendor/Contractor is responsible for correctness of design,
calculations, and details. Approval of this document does not relieve
the Vendor/Contractor of his responsibility in carrying out the work
correctly and fulfilling the complete requirements of the contractor nor

3 3

2 2
Building View
1

B REVISED & UPDATED FOR APPROVAL PK VC 2024-02-28


A FIRST SUBMISSION PK VC 2024-01-17
REV DESCRIPTION PREP. CHKD. DATE
OWNER
THIS DRAWING IS THE PROPERTY
OF SPTL AND NOT TO BE COPIED
STERLITE POWER TRANSMISSION LIMITED
OR USED WITHOUT THEIR PRIOR
PERMISSION.
(SPTL)

EPC HITACHI ENERGY INDIA LIMITED

LOI NO. LOI/STATCOM/BTL/HEIL/01, DATED: 30.09.2023


1 1
± 2x300MVAr STATCOM, 4x125 MVAr MSC, 2x125 MVAr MSR
PROJECT at Fatehgarh- 3 PS along with 2 nos. of 400 kV bays at Fatehgarh-3 PS

PKG TITLE Transmission System for evacuation of power from REZ in Rajasthan
(20GW) under phase-III part F” under Bewar Transmission Limited (BTL)
DRG. TITLE STATCOM INDOOR LAYOUT (3D)

DRG. NO. BTL-FTG-81-03402


SHEET SCALE :
HEIL DRG. NO. 3VIN230778T3M002
4 OF 4
A B C D E F G H SHEET : A1

You might also like