ORRchennai Phase 2
ORRchennai Phase 2
ORRchennai Phase 2
No Consultancy Package NH No Project Stretch Project Length Project Cost Assignment Periods
1 Chennai Outer Ring Road Phase -II SH-234 Ch.0+000 to 30+500 30.05km on BHS 1250 crores 01.11.2021 to 31.10.2024
5 Please Attach all TCS with Sheet and Mention Length of Carriage Way in Which particular TCS attached
Type of TCS with Applied KM TO KM
7 No of Toll Plaza's 2
10 LHS - 2 RHS -1
Construction Of AT-grade Intersection
11
No's of RUB'S -
S.NO 4
1 2567 nos
Highway light
2 16 nos
Highmast
3 VUP/PUP 216/176
18 PD Name and Contact No. Chief General Manager and 044 2495 2800/3800
Total Length of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approach Length Type of foundation Cost of Structure
bridge
Total Length Of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approche Length Type of Foundation Cost of Structure
Bridge
Total Length Of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approche Length Cost of Structure
Bridge
28 No. Of VUP/LVUP'S/Flyover VUP-14 Flyover-1 VUP -12m
Total Length Of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approches Length Cost of Structure
Bridge