Expensify Index 2
Expensify Index 2
Project Report
on
B.Tech – IT , Sem-VI
Prepared By:
Harshil Sarariya(IT136)
Kush Sawlani (IT139)
Guided By:
Prof.
Dept. of Information Technology
Candidate’s Signature
Candidate’s Name: Harshil Sarariya
Student ID: 20ITUBS009
Candidate’s Signature
Candidate’s Name: Kush Sawlani
Student ID: 20ECUOS009
CERTIFICATE
Prof.Kunal.J.Sahitya
(Project Guide)
Department of Information Technology,
Faculty of Technology,
Dharmsinh Desai University, Nadiad.
Date:
It is indeed a great pleasure to express our thanks and gratitude to all those
who helped us during this project. This project has given us a great opportunity to
think, implement and interact with various aspects of the Software Development
Life Cycle. We would like to acknowledge all the peoplewho have helped us at
one stage or another by providing the much-needed support, encouragement, and
groundwork to complete our project.
A blend gratitude, pleasure, and great satisfaction are what we feel to convey
our indebtedness to all those who have directly or indirectly contributed towards
the completion of the project.
1. Introduction… ............................................................................................................... 1
1.1 Project Details: Broad specifications of the work entrusted to you… ....... 1
1.2 Purpose……………………………………………..……………………2
1.3 Scope……………………………………………….……………………2
1.4 Objective .................................................................... ..…………………2
1.5 Technology and Literature Review…...…………………………………2
2. Project Management… ..................................................................................................3
2.1 Feasibility Study… ...............................................…………………..3
2.1.1 Technical feasibility… .............................................................3
2.1.2 Time Schedule feasibility… ................................................... 3
2.1.3 Operational feasibility… ......................................................... 3
2.1.4 Implementation feasibility… ...................................................3
2.2 Project Planning… ...................................................... …………………..4
2.2.1 Project Development Approach and Justification… ............... 4
2.2.2 Project Plan… ..........................................................................5
2.2.3 MileStones and Deliverables………………………………..5
2.2.4 Roles and Responsibilities… ...................................................6
3. System Requirements Study… .....................................................................................7
3.1 Study of Current System… .................................. ……………...…...7
3.2 Problems and Weaknesses of Current System…………..………….7
3.3 User Characteristics… .........................................…………………..7
3.4 Hardware and Software Requirements……………………………..7
3.5 Constraints………………………………………………………….7
3.6 Assumptions and Dependencies…………………………………….8
4. System Analysis… ........................................................................................................9
4.1 Requirements of New System (SRS) ................ …………………………9