Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
639 views
43 pages
IQ Protocol of HVAC
IQ protocol of HVAC
Uploaded by
bhullram736
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save IQ protocol of HVAC For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
639 views
43 pages
IQ Protocol of HVAC
IQ protocol of HVAC
Uploaded by
bhullram736
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save IQ protocol of HVAC For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 43
Search
Fullscreen
'ALLATION QUALIMICATION PROTOCOL CUM REPORT FOR PVT.LTD, \| HARIDWAR, a DEHUMIDIPYING UNIT P; eae LLU EEE __DITU No.: MLIPB/DHU-02 Ly = INSTALLATION QUALIFICAT PROTOCOL CUM REPORT | FOR — HVAC SYSTEM . | k CATERING TO GRANULATION-IIIOF PENICILLIN BLOCK [EQUIPMENT/INSTRUMENT 1D. No. ML/PB/DHU-02 LOCATION Second Floor (Penicillin Block) DATE OF QUALIFICATION | DHU No.: ML/PB/DHU-02 | SUPERSEDES PROTOCOL No. NIL. oslos 4 | | FORMATNo: CQA-OOWF03-00 “Document covered under IPR of LPL and should not be reproduced without authorization” @ scanned with OKEN ScannerMALIK LIFESCIENCES: | novogs par we me | INSTALLATION QUALIFICATION npc i | | PROTOCOL CUM REPORT ‘coonChMbnis: | TARIDWAR FOR patil | DETUMIDIFYING UNIT PAGE Noz2ot4s || i e DIN pBDNU2 | | CONTENT | [S.No TTL [10 |e Approval 3 (20 Otte [4 i Scope a a 4 ; | 0 | Responsbiiy = . 3 | + Validation Team Signature Register i 6 |! Equipment Details c ! System Description ee | Pre- Qualification Requirement - 3 | Deviation from Pre-Defined Specification, if Any 71 1 Change Control, if Any 0 | Review (Inclusive of Follow Up Action, If Any ) |e Conclusion - 40 | ) Recommendation Fy ' Post Approval Toa | FORMAT No: CQA-004/F03.00 “Document covered under IPR of M.L-PLL nd should not be reproduce without wathrialion™ @ scanned with OKEN ScannerYVT.LTD, HARIDWAR — 4 MALIK LIFESCIENCES | INSTALLATION QUALIFICATION PROTOCOL CUM REPORT FOR Frnordein, PROTOEOL Nye putureiqiei@dabat EFFECTIVE DATE: a a 26/04/14 © a | DEMUMIDIFYING UNIT [Pace esa . L_ - DIU No.: ML/PB/DITU-02 LO PRE-APPROVAL: oven a Seta | mateo Sly | [ DESIGNATION NAME" [SIGNATURE [Date | | OFFICEREN VE AMBER So posi sufi 1 __(QUALITY ASSURANCI AAMT R Senge i ' 2 4 alt 1 REVIEWED By: DESIGNATION iss * SIGNATURE DATE, | HEAD 5 (PRODUCTION) Jak enoeo U. aout | { HEAD F WG mel a excnteane —_ [VERY crtneanl) COL 22}04)r% | | oe | | | | DESIGNATION “3 NAME SIGNATURE “DATE | HEAD pupa || | Licouaurrv assurance) [Chen Prwoey | ak asyeuna | avrwonizen By: “DESIGNATION NAME: SIGNATURE DATE. || ‘GENERAL MANAGER M4 fou fi “ovatrrvassvicancey [ASO re-ererTs | SES ‘ey L FORMAT No: CQA-004F03.00 ! @ scanned with OKEN Scanner “*Bocument covered wider 1PRof.LP., and should nt be reproduced without authorieaion™PF vanwwar aa [evekcrive pats | wows DENUMIDIFYING UNIT PAGE Nos of 43 | DIU Nos ML/PBID! 02 | Hoy | PuPRScenE | PROTOCOL An | yee, NALICLIFESCIENCES | INSTALLATION QUALIFICATION | PROMO UK inc \| wig IWRAUTD, PROTOCOL CUM REPORT PLE Meson et 20 ORIECTIVE: © To prepare Installation Qualification Protocol cum Report of HVAC SyatnlUforg No. : MLPBIDHU-02), FIM + To verify that the HVAC System is installed in accordance with the Design and Usee’Requirements as defined by set acceptance criteria and complies with relevant CGMP Requirements. + Suecessfll completion of this Installation Qualification activity will verify that the HVAC System (DHU No.: ML/PB/DHU-02) meets all the acceptance criteria and is ready for OQ | 3.0 SCOPE: + The Protocol cum Report covers all aspects of Installation Qualification for the HVAC system (DHL No ML/PB/DHU-02) serving Granulation-IIl in Penicillin block at Malik Lifesciences Pvt. Lid. Haridwar. j : i + This Protocol cum Report will define the methods and documentation used to qualify the HVAC i system (DHU No.: ML/PB/DHU-02) for 1Q. | | | 4 @ scanned with OKEN Scanner4 ‘adit, || IVC DATE: INSTALLATION QUALIFICATION PROTOCOL CUM REPORT MALIK LIFESCIENCES PVT.LTD. MARIDWAR FOR 26/04/14 DENUMIDIFYING UNIT [PAGE Now SoF43 DIU No.: ML/PB/DH 2 4.0. RESPONSIBILITY: The Validation Group, comprising of a representative from each of the fllinns gpg. shall be responsible for the overall compliance of this Protocol eum Report . Ses) i f | DEPARTMENTS RESPONSIBILITIES + Preparation, Review and Approval of the Installation Qualification Protocol Hi ‘cum Report || Quality Assurance + Co-ordination with Production and Engineering to catryout Installation | | | Qualification. | + Monitoring of Installation Process. ‘+ Giving clearance to install the unit. + Execution of Installation Qualification activity Production * Ensure thatthe equipment is installed as per Protocol eufn Report * Review and Approval of Protocol cum Report. | 3 * To co-ordinate and support Installation Qualification activity, y * Calibration of Process instruments Engineering : * Ensure that the equipment is installed as per Protocol cum Report, ! * Review and Approval of Protocol eum Report R SRMAT No CQAaouFaaa0 = “Decurment covered under IPR af M1 B41 mo @ scanned with OKEN Scannermor (0 jour OF Mio | PROTOCOL CUM REPORT A VIVEDATE: || roe I 26M4N4 DEHUMIDIFYING UNI PAGE Bas Gurd3s | | Duo: Mipnontu-02 | AM - SIGNATURE REGISTER: 4 | FUNCTION | [Gort Astunmute | ae ee 2 Quatity Asewranes | SAdg | alow ai ! Henrich Chancho Rita [Gupineen Cut ‘low ny | | | IE py Enginsering aalouhy U FORMAT No: Con-ooura3.o0 Docu coeet unter PROF MLLPL an hold vor be reproduc @ scanned with OKEN Scannerwin. LO” anwar 60 RQUIPMENT DETAILS: Yaqui | Equipment 10. No. | Areal || Mannactorer | Sappter's Name Name | | Location of Installation {AT No. CQA-004/FO3-00 “Document con MALIK LAVESCHENCHS ] Dehamidifying Unit i No. ML DHU-02 Granulation-I11 Felicity Machines Pvt. Ltd. Felicity Machines Put. Ltd ~} Second Floor Peniilin Bosiy SSCS | vere ander TPR of MLL-PL- aut shout uot be reprodace wiht thon ation" @ scanned with OKEN ScannerKE PROVOG I] INSTALLATION QUALIFICATION etl | G45 MALIK LIFESCIENCES og * ee rn. PROTOCOL CUM REPORT. FERRKCTIVE DAT: | MARIDWAR FOR [aux | DEMUMIDIFYING UNIT [PAGE Na: 8of as sj) = —] DIU Now: ML/PB/DITU-02. | 74 SYSTEM DESCRIPTION: “ | ‘The HVAC system For Granulation-IT| comprises of the following units + DHRU - Dehumidifying Unit + Air Distribution System S.No, PARAMETER DESCRIPTION [7] DHU Details | it comprises of: DHU Body » Filters + Heater | + Cooling col | * Rotor + Blower + Blower Motor + Drive ‘i Dibalon Sytem] Tampa — Duets for supply and return of air Filter with housing in Supply duct. i + Valves (Three way valves, Balance valve, and Butterfly | | valvelGate valve}. + Final filters in return duct. + Diffasers grill + Pressure gauge. + Thermometer. Environmenlal conditions: 3. | Temperature 18°C42°C | Relative Humidity 15% RH+5%RH | 4, | Quantity of Air Cirutation Total air quantity: 3000 CFM Recirculation of air | | # | lie sai . FOIMATNOCQAMIISOO “Deus cone antes PR of MEPL oso abe reo vnorvoany to San @ scanned with OKEN Scannerinnate MALIK LIFESCIENCE: TATION | yrrvyryqueumia-an || {! ES. INSTALLATION QUAL PVT.LTD. PROTOCOL cUM REPORT ; FECTIVE DATE: | | TARIDWAR FOR rama | DENUMIDIFYING UNIT | PAGE Noz9 of 43 __ DIU No.: ML/PB/DITU-02 7 ol! } piu dE The User Requirements shall be met by installing DHU having the following configura IGN DESCRIPTION FOR DITU No.: ML/PB/DITU-02: @ 1 () eu DIU specification: Type: Re-circulating, (Ref. Schematie Drawing Attached) The Dehumidifying Unit will be a cabinet type unit of SS panel. Port for fresh air having 10 micron fiher is provided for fresh air. Fan section will have Plug Fan & divectly coupled motor. Return air | passes through Su filter then cooling col section with CHW coil of 2 row deep copper tubes & 12 FPL AA fins. CHW coil wil be placed on condensate tray, sandwiched type in SS construction & proper drain | Point. Supply plenum will have single stage filtration of 3p filter. Filtered air will be supplied to the | room via leak proof GSS ducting Joints sealed with silicon sealant), Both ends of the Gl ducts will have Angle iron Manges & flanged joints will hive neoprene gasket, G.l, ducts will be thermally insulated | with SE grade expanded polystyrene (E.PS.) and cladded with Aluminium Foil Principle of Operation: | Dehumidifying Unit will re-circulate ar fom the room with the help of Centrifugal fan, The air cares ine | the foom sensible heat and latent heat will be sucked from the room through low level pick up vsers via | GI ducts to mixing chamber. Approximately 10% fresh ai filtered through 10 micron filter is mixed | ‘with retumed air in mixing box. Then the air is passed through Sp filter ancl CHW coil. The cool a | Conditioned air shall be passed through blower & 3p filter. In this process the air is filtered, conditioned. ‘This conditioned air is fed to the area via Gl sealed ducts For RH Conditions (50% RH 5% RH) achieved with CHW Coil is used in line with the DHU. | The schematic representation of the DHU system is as per the fig. 1 a I! FORMAT Na: CQADO4F03-00 “Document covered under IP of MPL nd shout no ba reproduced withow anihoriserion @ scanned with OKEN Scannerqq MAAK LIFESCIENCES | INSTALLATION QUALIFICATION | ouneesbrHld hf fue PVTLYD. PROTOCOL CUM REPORT CLIVE DA RO" tarawan mR la te DEHUMIDIFYING UNIT [PAGe i | DIU Nos MLpmpatu0. | i] | GA DRAWING react air ut | sehen Ba ron FIG. |: SCHEMATIC DIAGRAM OF DHU FORMAT No: Com anu PR of MLP.L. a io:coa. " 004003-00 "Docu covered nder1PRof SP and shold no be eprodued wi ‘reproduced without authorieaion” @ scanned with OKEN ScannerMALIK LIFESCIENCES, — f wy | PROLOCBL AY rALLATION QUALIFICATIO! Datu PVT.LTD, PROTOCOL CUM REPORT FFECTIVE Nat) TARIDWAR FOR Lael DEHUMIDIFYING UNIT PAGE Now tof a3 _ DHU No.: ML/PU/D) a Description is | | Test Certificates for the following components to be altached a pelt i Wem Name ‘Test Certificate Available Ghee By | gn & Dite | [10x Fiter Ne. oveslerble | lng st | Serie Yer available | Claaininy Bu Fier er. avenleble Aga tows, : ||P" tes avetlabl Chaar lly ee Sey, available rea tol tt | [Blower Soy, lable Alea pottyu _| Coil Sey, aves lab reams Noir thes noel enn Radix dspay _— Qa tou, 7 | DIL- 00 | ERlomoo LER) at7-00 a | LERIo20-00 List of SoPs | Verified By: RAMBR SINGH jee ae I| fj Paes 24/e4)iy FORMAT No: CQA-OOUFO.00 “Prcumentcorerel under LPR Of MALPL and shoal mtb eprotued witha uhorkador™ — oo 5 @ scanned with OKEN ScannerMALIK LIFESCIENCES: IVT.LTID, HARIDWAR oe INSTALLATION QUALIFICATION PROTOCOL CUM REPORT j FoR i DEHUMIDIFYING UNIT | DHU No.: ML/PBIDETU-02 ! PROKC buttery fi I WEDA | Fem Name TagNas' | [DTD PIenims MUPBID RU on. | [DHUBiower Futhetled fa Hue BHU Plein | BAU Meter jwatalled de Wa AHO Perrone | | DHU Cot 7 __[ivltalted tuo Me AHO Reuceeat « Sup heater DHU Filters [Terminal Filter i Renan ar riser Duetin —__[fetintteg os per chal dows Siete pe dei tpi ribald a Yen AWD Planeetig NateUled inte AHO Altec TreuPokve~ 30.31, 122.1 MUPBIRRE ~ Lp, 128 w@ut30, 181 13g a iat oA Filer Terminal Box ee Hlestical Sarr pana? ena | Reon pee aiereatat monr Inu faleMD = Fetiperaur nd RH controlar Pemencned ane RULE al st bet aa @ scanned with OKEN Scanner RSD ee| @,¢3 MAUIK LIFESCIENCES | INSTALLATION QUALIFICATION | Os PROT ATTIRE Ae vray. PROTOCOL CUM REPORT NS" iatapwar FOR (eee DETUMIDIFYING UNIT "PAGE Now DITU No ML/PR/DIU-02 8.0 PRE-QUALIFICATION REQUIREMENT: | 81 Verification of Documents & General Arrangement Draw To vey that Approved Drawings and supporting documents of FIVAC Syed yh | i MLIPB/DHU-02) conform to the Design Qualification, a | 8.1.1 Procedure: + Verify that Approved Drawings and supporting documents are available and conform to the DQ | | | | Protocol Cum Report. + any deviation from DQ is observed during 1Q, the same has to be recorded giving reasons for | Deviation and Approved. Deviation should be eppraved by Authorized Person. | * Drawing arid documents should conform to Design Qualification Protocol cum Repost. Any Deviations observed must be recorded and approved. + The General Arrangement should confer to the Approved GA Drawing. Any Deviations observed, must be recorded and approved. | | ee : E FORMATNa: CQR-OMFOS20, “Document coved wader PR LLPL, shod na be repre ha str $a ee @ scanned with OKEN Scanner\\ Sey cp , coma Taney | seg MAUIKISCIENCES | INSTALLATION QUALIFICATION | pirunoyrwied a | 2 IVT.LTD. PROTOCOL CUM REPORT EEPECTIVE DAT TARIDWAR FOR eee DENUMIDIFYING UNE HAGE Nog 1d of DIU No.: ML/PB/DITU-02 ification Cheeks | Acceptance Crit Observation | Drawing: > Air Flow Diagram Should be as per Approved [Po.cud Od pew Drawing [\epprocced dawg Should bea per Approved | Jound ap General Arrangement — approved OA _ Drawing dlawsing Checked Ry: Verified By | Engineering Quality Assurance | Sign & Date Sign & Date we Sudine A, | a PORMATNo:CQA-OOUFOR00 “Document covered under I af ML Lad shold not be reproduce withont antoscation @ scanned with OKEN ScannerMALIK LIFESCIENCES | INSTALLATION QUALI PVT.LTD. PROTOCOL CUM REPORT TARIDWAR FOR DENUMIDIFVING UNIT | DI Not MEP B/D ITU-2 CRITICAL VARIABLES 9.1 Verification of Piping & Instrumentati ‘To verify that the installation of HVAC System (DHU No. ML/PB/DIU-02 Approved P & 1D Drawing od Proved 4 Pesform Physical Check and verify thatthe installation has been done as per the Approved Pé&ID Drawing. «Any Deviation in actual installation from Approved P&ID has to be recorded and approved giving reasons for Deviation + Assbult ané Approved PAID shall frm apart of the 1Q Protocol cum Repor. | 9.4.2. Acceptance Criter | ‘The Installeé Piping and Instrumentation should confirm to the approved P&ID. T - Observed By | | smsthiton Cine Acceptance Criteria |= Observation Engineering nstallation Chee | gineering | eee _ Sign & Date | Piping and Instrumentation Diagram Verification + PEID Verification | The installed Piping and eal | pore PF | Gate || | insruentaion shoud confmtoth | Pucca a4 per Jealous appeoved P&.1D. Any Deviaions opproved PRIS | observed, must be Recorded and | Approved. | Veritied By Quality Assurance Date CY Sign & Date Cons iy vad Pou Ip hn emai Reviewed By: \ Manager QA sign & Date_@A | | pelt | | L | FORMATNo: CQA-ODW03-0 “Document covert wnder IPR of MLL. al sot not Be repro witht autharcation @ scanned with OKEN ScannerINSTALLATION QUALIFICATION 5 MALIK LI lee Le PVT.LTD, PROTOCOL CUM REPORT | SEs, ron [eourcesstaas ! DEHUMIDIFYING UNTT FPAGE Now 16 ora DIU Nos ML/PG/DHU-02 SC 9.2 Verification of Major DUU Components: / i Te deity te Maj Compesns oF HVAC Sten (DHL Nos MUPRIDIIU-D he Technical Specifications with DQ, as basis i Se 9.21 Procedure: “ + Verify that, the Major Components have been installed as per their Approved Technical | Specifications in DQ. ‘+ Any Deviations to be recorded and Approved giving reasons for Deviation and recommend follow- up action if required, | 93 verinicarion oF urtuiry connection: | To idemtfy that all Utilities have been installed and connected to the HVAC System as per the DQ. 931 Procedure: + Verify that all Utes have heen connected as per the requirements in Design Qualifeation | + Carryout installation Checks for Utilities to ensure smooth Commissioning * Any Deviations have to be recorded and approved giving reasons for the same. 932 Acceptance Crit * The installation and connection of Utilities should be as per DQ, | 1 + The method of Checking & Observations has to be recorded Obsened By | Installation Checks ‘Acceptance Criteria Observation Engineering D . Sign & Date 3 Phase plus Earthing, IS Pose ue 4 Wire Line up tothe panel Foengettite CGrastor ow Electrical Supply board terminal cre lied Voltage: 415 + 10% V easy Ye Frequency: 50-43% Hz 50M £5 +). | "| Should be able to meetthe | a required controlled Wr ate \o Bon Caton Seen ei settol Catia Temp. 18°C £2°C & i Relative Humidity 15% 35% ! Chilled water piping/ ee Bam [pat wa | Teniperaure 50.8 mm /7°C 10 9°C ico [ate Qurrorlny Process Motor | 2HPASRW, SaP TSR | Blectical | 3 Phase wire input SMow mbat- | rally [Motor | Reaetivaon 7 3 eis s kw FHT BSED a | lg | Motor 3 Phase wire input 1 Plasan wpe | a alpen FORMAT Na: CQ4-0O¥O3-00.° — “Documen covered under PR O[MLLPL. eal sous ot beecprodace without authorigon= a @ scanned with OKEN ScannerI il pe ee eo es MALIK LivescieNcrs ig YTD, MARIDWAR 7 | eotocgs INSTALLATION QUALIFICATION | yniuypygh iy, (,/ PROTOCOL CUM REPORT noire hy FOR DEHUMIDIFYING UNIT —_ DIIU No MLIPHDITU02 ! Gok Verified By ‘0 gineering . Quality Ass | Sineae _Cosioats zn beige Pagal | ference: wR Lea jor DM ed pee cong Nustertlation aud cel bey. — “ Reviewed By: ager QA ign & Date allo TY . FORMAT No: CQH-O0UFO00 “Document conrad unier IPR of ML.PL and should wtb raprodiced win amhooa= @ scanned with OKEN Scanner{ emer! a - | [reordcdileyy || MALIK LIFESCIENCES | INSTALLATION QUALI TION puorsiedyy I] yp YT. PROTOCOL CUM REPORT EFFECTIVE DATE: {| a TARIDWAR, FOR omnia | DETUMIDIFYING UNIT PAGE Nos Bots |) seca DIKU Now MIP IU.02 eau) ‘To verify tha the Material used for construction in HVAC System is as per the Desig ‘(i mee EEE 9.4.1 Procedure: 3 + MOC has tobe verified during installation by verifying the Certificates. + Cemicates fo all Major Components to be identified + Material Tet Cerifieates would form apart ofthe 1Q Protocol cur Report | 942 Acceptance Criteria: ‘The Material of Construction of All Components should be as per DQ. aaa 2 is ‘Observed By Installation Cheeks Acceptance Criteria Observation Engineering Sign & Date | || GUELS FOR SUPPLY & RETURN Ae [(Chilled Water Piping [508mm rien | Oopouliy | | [Decting: GI Sheet He Zi amee t= aya) : YLPE cose wo 2S mm ek RUE ate eta @ Insulation acme cate OYE Onalonelina with UV protection peoictiien | VALVES: Haase _ | Butterfly valve | Q@ralouyy | Balancing valve rile |) Three way valve Cast iron ul \N FILTER & FILTER FRAMES: *oalout_| Primary Filter Seed in Al frame ated q ere : is a Bee eee Absolute ‘Settled in Al frame teed WA onal Gen\ou)ia Checked By Verified i} neering : Sign & Date Cogan | Reviewed By | Manager QA | Sign & Date \ pets | FORMATNo:OQA G04 40 “Decument conc ander IPR of LPL sonnet erect aurea @ scanned with OKEN ScannerTVT.LTD, MARIDWAR, As Procedure: + Allthe provided Utility has to be verified duting installation, 2 Acceptance Criteria: 1 gee NAUK LIFESCIENCES | INSTALLATION QUALIFICATION | protocol uM DIU No, Allthe provided Uti’ should be as per DQ. 1. CUM REPORT FOR DIFYING UNIT 1 /PBDHTU-02 will re eevee past Installation Checks {os Acceptance Criteria Observed By Engineering Sign & Date ‘Should be tight, weather proof and grounded ae Observation wealtred Qaioulrs | ‘No loose hanging Cables, iow eel Gals] Well-insulated Electrical Wirings wet racked se [Geavav| Located ina safe place well protected from Water Scepagé during Machine or Floor Cleaning and also safe for Operator during Operation we wah aE fool. Identification Tags and Electrical Drawing Identification tags should be availabe where eventual lesricl Drawing avaiable | cither pasted in the inside of thecieuitboxoras in he eae yr ae Seen oer cnaitabols Manual Sign & Date Inference! | Atl He poled Ces oan Hdod viiltics we Verified By: Quality Assurance Sign & Date” Qowbérralor)iy tn wei tng iwtteltalton oad | | sles aattasiney, | | || coal Neti oe cal wining G Reviewed by Manager QA Sign & pac _ Ay @ scanned with OKEN ScannerMALIK LaF fe YVELTD, MARIDWAR SCTENCES: FICATION OF SAFTY FEATURES VER i Report. 9.6 Procedure: + Allthe Safety features have to be verified during installation, Acceptance Criteria: All the Safety features should be as per DQ. a Installation Chieks INSTALLATION QUALIFICATION PROTOCOL CUM REPORT DEMUMIDIFYING UNIT To verify all safety features in HVAC System is as pr the Des ‘Acceptance Criteria Vs ee ill (ly |, | prrurigieman-on | EEPECIIVE DATE: | uma | | acin sas an oras | FOR rmbt | Requirement in DQ Protein fee | B yet J Observed By Engineering Observation | | Sign & Date | Dro Mops a apleult area in case of fire. | Safety Guards For Drive assemblies Vike pulleys & belts Checked By: Engineering Spee dae Cova v Inference: ALL Hus Zaps Patines yon ballireed cube ittatlatin, Gwedh foxes sali da oe al i For Operational Safety a i | 962 | . | aeons | | | I | | | | MECHANICAL: — | [= - Tipe DAUanTTaIe THO Ape lg | | ‘ | avaltabt [Gaaywans Verified By ality Assurg Sign & Date ~H sa outs | _ FORMAT No: CQA-004/F03-00 “Document covered under IPR ofMALPLL and should not be reproduced without eutharction Sign & Date a. Sa @ scanned with OKEN Scannerped) : =r | pRorocot, Mf INSTALLATION QUALIFICATION [ninco \ ee MAU LNT Ne Bree. PROTOCOL CUM Ri SP aripwar 1 ror \ DEHUMIDIPYING UNIT DIT Nos MLIPB/DINV-2 EFFECTIVE DATE: | uid |) {| E Nos 21 of 8 LIBRATION: ENTS Ci VERITICATION OF CRITICAL INSTRUM 7 Tove tal Cit anes te VAC Son ee tit bel A fi i | See Operation Qualification, Procedure: +All Critical insruments are tobe calitrated before instalation and ther Calibration Catites have | te bests wih 1QProtacl cm Rept. | * The next duc date for Calibration has to be noted. | ‘© Deviations are to be recorded and follow-up action is fo be recommended. | 9.72 Acceptance Criteria: ‘+ All Critical Instruments should be Calibrated and qualified for installation. CALIBRATION DETAILS CALIBRATION] ‘ONSERVED HY CALIBRATION logseeyarion| ENCINEERINC TT | cqttimation | SoRRINCATE. | Chipane [OBSERVATION] | ENGINEERING 7 PuRar | paouhy | Sceeo6e | ouir | oK Falvey sagen |RLP EA sshouly | SCT | arteullr | oe Close jy | | saeeret Qual ah = oueMENT | _ DATE OR ovificbinn af criicel inshumuks Maditmobion done § Reviewed By Manager Qa P Sign & Ds 4 FORMAT No CQA-0WFU3-00 a and should not be reproduced withont authorisation @ scanned with OKEN ScannerINSTALLATION QUALIFICATION MAL Sy WNT. PROTOCOL CUM REPORT \ ay TARIDWAR FOR 26/0 il i DEHUMIDIFYING UNIT PAGE, Now 22 of AS VW i DIV No ML/PRIDINU 02 i as Ol a (CRLIST FOR INSTALLATION: i y || nstatation Checks Acceptance Criter DUO Plenum: — I | Make licity Machines Pvt. Lid. 5 {DAU Dimension 25¥4n 1270%850 ! [Lx Wax Hin POR OND | et | | Dehumidifier Frame ISA mmx I5A mm SS Hollow POUR Y SF cw | i} i | | ie atl pe Gur _| || Panel External Skin 0.8 mm Thick: SS Sheet (eDkc tte k thie k 386 Garin | [Air Quantity 3000 CFM sa\ouliy | | State Pressure 1150 mm of WG aaleulia | [Hone | | ee | — —} | [Make Nicotra, Nicoha QO yao il Model RDH280R ROH 2 Bo valenhy | | | Fan Speed (RPM) 4000 Useo Quin | Z Pulley i mm | ¢ ae Hem Whaae 1 Qrrsieul | \ Groove B 8 Qari} || Shae mm = LG: 1 | 7 aalolia | | [AnteVibration Type U' Shear Mounts 0 shear tewol | | | Gaaloalye _| Flexible Connection | Nil Qt | 1 No. 7 Goren i , 1 Qa, Process Motor: Make Crompton Coompters Cran |) Rating HP 2H ‘| Gavin | Type 3Phase Induction mor [SMa wawhon | Oratvrhy_| | RPM 2800 Woo Qala. i 4 “Cried 1 No. : {Xe | Qoareln | Bonfighiolt [he bt Cuts ee FORMAT Nos CQA-0O04F03.00 “Document covered uniler IPR of M.LLPL. aud should wo be reproduced witht aut @ scanned with OKEN ScannerULATION QUALIFICATION PROTOCOL CUM REPORT FOR ; ee | ania : DEHUMIDIFVING UNF PAGE: i 02 oe - = Otpesved ty t Unsalation Checks Oberon lle i | Rane Ya eh Otouls w T No. LN - Aralouly || Reactivation Motor ! Make ~ Crompton saletliy | Frame Size ~ | Flange 7 aleu)iy amor Spot Te RPT _|Qzatoul |) | 2S mm wlth Zpole | Qaalor\ | mim | Conpuly, 73H Qari TNe. 7 _{ >_ || ANU CG Chilled water coil (Input Data) 7 Oty 3No. SNo- | Type Fin@Row Ru koe | | [Ro ofRows ofthe cooling co | y z «le fe Fins Material Aluminum Ruuuhutaa Quail t Tube Material Copper 7 [Fins per neh T12fins 7 nit mA Geel Fin Height ___ | M0mm [406 mm [68S mm ‘FRene bund Gana] Quaiouis Fin Length 930 nm [1054 mas [825mm Day Mu B.C Orato Coil Tray MO. SS.304 26404 Qratouy (Operational Material Chilled Water Chiled vole, Qanlouly Chilled water coil (Output Data) 7 | [est are any aes [+6 6:08 ye Ye] ny Qralor |u| | | Chilled Water Cireulation (Manifold): . Pressure gauge { [Make [Gem ai | Type Dial type \ FORMATNosCQAOUFO>0 “Document covered ter PROJ LPL ox shoul a brspratucd wahoo @ scanned with OKEN ScannerWT LTD, TARIWAR MALIK LEESCHENCES | = LE ' naa ila INSTALLATION QUALIFICATION yr tptomnl/n | pRoTOcoL.cuM REPORT | PUNTguim ll | ron manta | emuanmrevivc unre FARR tara at NTU Now: MLPRADIU-02 Ze ) | Observed By ifn SF ate Acceptance Criteria Coil inlet € outlet | CHW Pressures 4s. Gur Cylindrical Location Ce & | Measures i ae CN Temperature gauge r Make [Type 7 |) Dial Size” 7 ‘ocaton 1 a nal || | Gani | CHW Manifold - | | Measures CHW Temperature CrN0 Temperalare S | Oy Dios Ou Nose || Piping : | fimoc = [MSC class ~ fas C'cloee | | | Size 50MM SD Me ‘| | Trsiaton KEPE Chesed Call of mm (RUPE chateAead | | thick with UV Proton Ran th poehe Butterfly Valves | Make Castle Leader Model ——SSS~«*diC SST RKOO2 | MOC Castivon | Cast Tron Size 30mm 0mm | | Peessire Rating PNIO PN2S 4 | futiy }2 Nos. 02 Nos. x | ' Balancing Valve < | [Advance ‘Advance [= FORMAT.No: CQA-0O4F03-00 “Document covered under IPR of ML-PL and sow nt be reproduce ithon aashonctin™ @ scanned with OKEN Scannera \ \ lee wan KV VARIDWAR, FOR On INSTALLATION QUALIFICATION PROTOCOL CUM REPORT peters Ff oco1s Myf | provacol. Ni, | prruPrieaana-an | PECIIVE DATE uy oad Nowe28 9h 43 ee 2 | PAGE Poor | bone 4 i Tam PHL Yours | 4 Pressure Rating PN40 puso [| pnluy | \ | Quantity O10. one | erAlo ne ‘Water Cireulation(Mani inn | | Stainer 7 - | DRP Veeson ep | Veezon Qealeu\ Flange type Page [Flange LF Gane || [vty PY T Ciaente MS Ms 30m mm D ] jpn Tre Finis | — Qa TN. Ne. IN Honeywell] Honeywell Sway mixing [3 waymixing | || Type Model valve valve | PNIZT2DNSO | PNGT2T2DNA0 agg yy nfpu aa 2 mr || Quant Te, To, [ime | ine | ( | | | Actuation Modulation | Modulation | me autadeo, [axectatiahox} nn pe fe | tt | Gaioter |) saad [Motos _| Metal eased Joctodeed | Chaat |i Movernent Linear Linear Vinca Gun | Garnity_| : oI wt Controller Proportional | Proportional 1 por ae Thermostat | Thermostat Qa jou : 50 mm 40 mm Daa yada ‘GC; ‘ls | ‘cation ri j gReam Line /Retum Line |yu y, enti Agaies\ | Filters: eI | | ABU Fit L FORMAT Nos 0QA-004/F0-00 “Document covered under IPR of MLL.PL a should not be reproduced without authorization” @ scanned with OKEN Scanner\ Ges Ne PVT.LTD, |S" naripwar —— hy K LIFESCIT : ROTOCOL Nout MALIK LIFESCIENCES |" INSTALLATION QUALIFICATION | prruypigipsi02-00 PROTOCOL CUM REPORT 7 FOR DENUMIDIFYING UNIT DUU Nos MLUPBDHUA2 ICTIVE DATE: 26/04/14 Installation Checks Acceptance Criteria Observation i | i Rating feu ; EDAY 1 i Vake ~~] Meechmaark Equipment achat | Qapi\or |e _j Mea epren —__ecbraraor | On \| Type Box ype Bon Oona | MOC Medias Non-Woven Sytietic [SSSR Q i Frame:.Al Anodized arhuodized valor | Sinn ed] Sitcon can | Size of each Filter : | "= 720 2.430. 25 spo xUeK25 | A ylos\M | | inmm i Filter Face Area 13.33 Sq.ft [233 ut QoAlou Filter Rated capivincem |” bee Brie Stage-1 | Quantity Nos. 1 ry r Cine Initial Pressure PCL Le Mu dioparacd | 5 Arnie capacity (mm of | wo) | | | Recommended To Final Pressure ot drop at rated 10 \o Ox capacity (mm of wa) | aesiance ae T den to —— 95% de 10, lo! I Efficiency (%) pen to 1% lope | Qarterlyy || [ates pus Eos Greely | [Make _[Meshimaark Bauipment fwecharart | Aypieays Ps Se Flange Type Plage. (Gratenin ‘MOC Media: Non-Woven Synthetic wouter | fee Frame: Al Anodized Qraoulin Sealant Used Silicon Gutex| a FORMAT Na: CQA-00UF03-00 “Document covered under IPR of MLLPL ou should nt be reproduced witha authoration™ @ scanned with OKEN Scanner 4PVT.LTD, MARIDWAR ‘Size of each : Ay : | PROTOCOL, Nu NCHS | INSTALLATION QUALIFICATION | yyyprqyPina.n PROTOCOL CUM REPORT PPEECTIVE DATE FOR 2604 DENUMIDIFYING UNIT DIV Nos ML/PRADITU-02 ter Observation Acceptance: Stagé-3 | | 650 x 785 | Titer Fase Arca 1058 Sq Filter Rated j 2000 | ‘Capacity in CFM | Voantiy Nox] 1 | ina Pressore lf drop at rate 6 capacity (me of | | Wo) | Recommended Final Pressure ! capacity (mm of | m7) ‘esance ~ [ORR een FEET | since go |°m7eom2038 | "|Rating EU-7 - Evy Nake Wein Eup akan Type Flange Plane Quads | ; MOC | Media: Non Washable Micro | wore wre} Raale® [~~ Fiber mee fT | Qaaiors Frame : AL Anodized AR arredinod i Sealant Used on Sitter, Crier || Size of each Filter | 650 785 | espxtas | Ay aoshe_| 1 Filter Face Area eae | 1 | lous 10.98 89. '0-48 syd _ Grinin | | Filter Rated : i ! ae 2000 Deve Capacity in CFM 5 aT RES. iecd SEMMERg at etm wipwanccam onc \ @ scanned with OKEN Scanner‘TION QU: PROTOCOL CUM REPORT FoR DEMUMIDIFYING UNE DIU No. ML ‘ ehily | proracor DiTuAnsP02-09 |ALIFICATTION B/D NTO Installation Checks Acceptance Criteria = - CT erm Obseratan ails |, Bate ‘Media : Non Washable Micro | Fiber Glass (Imported) T Quang os) [2 2 hia Pese | 1 7 | oie | aa\et |! drop at rated 7 6 C | capacity (mmWG) Recommended] TT | Final Pressne Ganon drop at rated 2 26 C capacity (mmWG) | “resiance Weldon te i Efficiency (%) | 99%down to 3p ae Canes | Sopp Ale Terminal Finer — | [Pang U1 bot Gari I Medkanarke Euan haa ol — | Fangs Type ralgrn pide rein | Cesc in CRM lvoe Quart | Initial Pressure | opt aed capacity (Pa) 250:410% | Frame : Al Extruded A erbuded, ‘Sealant Used Silicon i Z _ | |S | SNe @ || Size of each Filter | 610.x 610 x 300 a — il q 4 GIO XG 10% Be i te Gein ‘iter Face Area | | ~ / 7" } sa.) 7 Goren | ‘Quantity Nos. 4 © | Filter Rated + ‘s | 1000 @ scanned with OKEN Scanner—_— zo { | ; ; ee \ | Gey Mau : INSTALLATION QUALIFICATION rust ey ee writ, PROTOCOL, CUM REPORT TARIDWAR EFFECTIVE DATE: wd VING UNIT LIPRIDITU-02 T o ao Installation Checks | Observatic gi ee ls a e'pite |) TT Recemneied TH fs iI le i [Fina ressoe | 7150 Qaapal | | drop at rated capacity (a) Sane aT deen | 99.997% down 1003 | " istamson [2EmetH Fea Cast - | / Make PPT PPI so | [ype ~ Tule Rear i Riser oF Pane yt Ptr bra Au | Moc PCGI Rar © wala | | Sie ofeach Rewm Rise, [50x80 3 || | RIDXBO | lim Cas | || eianty os 4 Gane | | [Rated Capacity in CFM of | 650 7 | || each Riser 65° Quai ‘Return Air Riser Filter: - el eam | fe ol ali | | ‘Type Box, a rr Size of each filter (mm) 400 x 400 Guantiy (Nosy 3 Rated capacity in CFM of each pacn CPM oFeah | filter Return Air Riser Damper: Make PPI Type ‘Opposed Blade |/Moc [oss | Size ofeach Damper | 850x75 FORMATNo: CQA-OOWFOB-O0 “Document covered under JPR of 9.LPLL andl shouldnt be reproduced itt wuterisation™ @ scanned with OKEN ScannerPROTOCOL. DPI Ion MALIKI NCES | INSTALLATION QUALIFICATION YTD, PROTOCOL CUM REPORT. WARIDWAR FOR | DENUMIDIFVING UNFE einai : | Otnervediy | ory ee eee | | “ Ng | Medlin i rom font of ser i ok Aeiae “pleut i = 7 t | Supply Air Dusting: / Installation Checks [Acceptance Criteria Observation {2 "Quantity (eS) [Sees || Make (Sheet) Jaci. | pce | Qanod |) [Fabricator PPT PPI Ora | oe a [Duct Flange ‘MOC: MS Angle duly Painted Se nt for duct joint | Food grade Silicon sealant | Make Ghee) ‘ACIL Fabricator PPL | MOC a | Duct Flange MOC: MS Angle duly Painted Sealant for duct joint Food grade Silicon sealent eae aces] Cea a XLFE Traian wah RE pele Orel Metalised Polyester Foil Tnsushield Colour | Dark Grey Thickness ~—) 13mm Fire Performance Class 1" Density 3023 Kym Thermal conductivity 027 Kcalfar m°C at 0 C Return Air Duct Insulation: E [Sapien Luh | Cam oc XLPE Insulation Material with : L Gr \\ | Location On the ducts on Ave uate Gaisuln Metalised Polyester Foil i Fa @ scanned with OKEN ScannerGes MALIK LIFESCIENCES | INSTALLATION QUALIFICATION x ye PVT.LTD. PROTOCOL CUM REPORT )XS narinwar FOR | iy ENUMIDIFYING UNIT | \ ana DI: | i Oinervéd By | : Installation Checks | Acceptance Criteria Observation (1° fy i | a es 5 pe | || sstieliCaaur Dark Grey dal ayy a wo | Thieiness omm at [| Catal | ie Penance — Cass close PF Gyan Dany (03K sere Bala® | Qrapeiu || ‘Thermal conductivity O07 Kealirm CROC lyon teoablirne | C Ap | | [Een «One duets [ovtteducts | Oraisrlu }) | FHoasinge | | Pak PPL PPI +H Qaaionite | TBoxMoc.———_| GL With Powder Coated in 18 [GV ut Wx parte tect a | | Gauge fiw \8 we | Qaierto t i 30 1 Terminal MOC 7 7 ‘perforated screen in 18 pane ie Ripe Oye | Type Single Skin sige clan | | Suitable Tor Hoang of o0xen0x350 erbkorexsto | “|| [Qanaiy esp 5 Control panel: ieee Siemens(5.2Amp/.0Amp22 | STE TAP OH Amp/s2Amp) afl | Timer EAPL (010 30 minute-2 No) Ll o-Beatin | Relay Siemens — 5-8 Amp [Went 5-87 | MCB — [100Amp so A | i “Thermostat 0-300 degree e | ‘Aewedsores [Limit Ste ‘Aeon Reon j Anti-Vibration Pad 30mm So ram | | Glass to see rotor movement | 200 mm Dee ay Dimensions of Room in mm for Which the DHU is ii | oon Length | width | Height | Lengen | wiath | Heigut | | [umm [Gn mm) | (in mm) | (ia mm) in mam) | (in mae) | Granation sn | aaas | 0m | So [Ubos [oso Gri | FORMATINe: CQMCOUFO3.A “Document covered under IR of MP on —— a er i shal tbe reproduced without auton son @ scanned with OKEN ScannerMALIKU ge WLLTD. 5 MARIDWAR | FOR DEHUMIDIFYING UNIT LEE ___DHU No.: ML/PB/DHU-02 PRoTOC! TALLATION QUALIFICATION || piru/piqipnon2.do 1. CUM REPORT bEFFECTI | prdT0CoL. FECTIVE DA Installation Cheeks Acceptance Criteria Observation Duct Leakage Test: Duct Leakage Testing Insulation of ducts by auaitore should be tested before Pressure test as per SOP for | Checking Duct Leakage. ‘Air Leakage through duets vendor oP i SOP for Duct Leakage Tex | Vode Sof | Gril jso ‘should be available. | | ‘Control Panel: i 7 | DIU ‘START? Button Start Button Krol Qnlouly DHU‘STOP" Baton | stop Baton Lip Gately | Indietor for DHU“ON’ | On Indicator oN Grol | Indicator fr DHU ‘OFF | OFF Indicator otf QAsalouly | Tn the Soply Area Room: Supply Ait Diffuser/Grils Well Fixed with the duct body leaving no gaps in between. | Crantoater Return Air Difuser/Grills Well Fixed with the duct body leaving no gaps in between. “eet re Qorrtey DHUiin Preventive ‘Volume Control Damper Should be installed Preventive Maintenance Sched Maintenance Schedule Should be Included Wwatetted | Cantante | Craton Labeling of Supply and Return Ducts: Colour used for Supply Ducts ————— Colour used for return a | Digital Display for Temperature, Relative Humidity & Pressure [Gere | Owais | Ducts ‘ tA | Overly i| Differential: | Location | At entry of the room FORMAT No. CQ4-0O4FO3-00 Docent concred ander IR MLLPL nd shold eb reader nara ak oky | Bala @ scanned with OKEN Scanner= — — vy] MALIK LIPESCIENCES | INSTALLATION QUALIFICATION tae men {| wW WTI, PROTOCOL CUM REPORT | \ HARIDWAR FOR 26/0414 { DENUMIDIFYING UNIT "y 1} é SHEE DIU Nos MLPRIDIU-02 i] \] fig | | Installation Checks Acceptance Criteria Observation \L an = = 3 | Make eee eral | Temperate C22 ee Auton || i | [Relative Humidity 1596 RSM RE he | Range | | Pressure Differential | 10-15 Pa (Granulation-tti) No-15 Pa | Quant ol o} Chea tel | Radix display: |] Location ‘Across Filter in DU across Yikes | Chae rouiy || Make Dawier rz touts [Ras 0-50 Conn | | [ou Olt | Ga otaly |[Cesrng | Ensure proper eleaning of DU Faae 7 Cleaning of DIIU from inside & outside with dry | ‘Lovrd clecawsd €e Falouly cloth. Ensure proper cleaning of ducts on at the time of Installation from toond Clecnud eae inside & outside, ducts should be Aggy free from particulate matter, To ' be observed visually. Standard Operating Procedure: SOP for Operation & Cleaning | SOP for Operation & Cleaning Ue : of Dehumiditying Unit ozo Q, Srosuaani Usk 9 Dehuriditying Unit should be Blouhy avilable, SOP for Preventive 80? for Preventive Manoaree | oe 9.9 a i Maintenance of DU of DHU should be available, 068-0 oy i General Cheeis: General Installation Checks | Placement ofrubber pad on — | Robe ad ee ! __| foundation Lo Gaol lly FORMAT No: CQA-004/F0.00 “Document covered under IPR of M.LP.L. and should not be reproduce without authriat @ scanned with OKEN Scanner——— te Ee MALIK LUESCIENCES 4 PVT.LTD, MARIDWAR FOR DENUMIDIFYING UNIT ALLATION QuALaEeATIOn | eaTOCBIE RAL PROTOCOL CUM REPORT DITUPLQiPHON2-O0 WERCTIVE DATE: | E || Qualification, at DIU No MLIPR/DIU- Tnstallation Checks Acceplanee Criteria Observation Darn Tslaon Facenen of ITU on [Trower foundation wth proper alignment with ub Connection of DITU and [canvass Ea m % oil, blower, Fine Filter in the DHU, [Properly pothiond duet by means of canvass Comme ed. Aye Jeully connection, 7 mn Noise level of DHUat Imeter | Golous Qoal distance as per performance atau curve of blower 7 7 Airtight Connection of DHUt0 | (\iyigd Comma reumair diet fesharduee |” 9 Le muirs | Leakages through inspection | Wo leak door and access door, jot Clog fou tty Proper Connection of DHUtO | Pyerpevliy chilled water piping. Comnected Chain Ny ‘Whether servicing to DAU is | easily accessible or not. | Ser Laan ny_| Dimension of the DAU as per | A Pey PHU | | DHU Ga drawing _ [GA Sve Shae ett Individual dimension for every | Vdivideeak an wrabion aveilll Cla fou 89 (04 (It ‘Statically and Dynamically balance, Food bedawag Ce (ouly Proper placement of Humidistat ‘and thermostat in the Return Air Duct Croperly fled Ae loll Radix display location as per As py DHO GA | eatows DHU GA drawing, UM) [Eesti comectea DAU ae [Elechevel tana er requirement, avd ee | Che totaly @ scanned with OKEN Scanner (LAL and should not be reproduced without authorzaon™MAUK LIM Wr.17D, = MARIDWAR 99 at SCH ANSTALLATION VERIFICATION: INSTALLATION QUALIFICATION PROTOCOL CUM REPORT FOR DENUMIDIFYING UNIT Check that sl the Ducting eomections are as per drawing, “Trnoroc bey | mite gu EFI [wound PAGE N ion] concept Remarks 1 tomas | Rempaaestaioms [Obra eat eee Fis | Olvsrvation | Remar | sige pate Verify that the “as built” | The “as built” drawing, bad UE | 1 Uawingaeconplee& | imldbeas parte | dtasoteg jose Lato Araloujiv |) | represent the design design concept oh pes Cactee pt ‘Verify that all dus ——— tack Handoy Ora |) et sho “ sou) Veale Vanauwamite (RACREES lataptong (Conon | | Sign: Date: pabulty | eel, FORMAT No: CQA-004F03.00 ye EUROIRTIN ssulated 1 _ a ‘sec no aenable | No physi danazewo [w= pogo | t Peeesee™ Teaeeen™™ fake mtyeiny ube biw bextined epee Les | Sufficient room for ‘Space for servicing will [S780 Aakeed najoultu. ons ena fake [Craton ‘Verify that al) waponent ake dour ao pew 7 comatotmaton | Sere stants pntsyey | Qaapults nei ng | sorte dig \ ‘Valves identification | All valve shouldbe UL wan Hy nameplate is visible identified, tested & Lurted pot flor Cratoul _| labeled De 1s Observed: | Remarks / Super 7 a 7 Nodenidliour diewed Cw “Document covered under IPRofM.LP.L ond sho not be repraveewithen eurgaon™ @ scanned with OKEN Scannerng MALIK LIFESCIED \\ IS & PVTLTD. <3" HARIDWAR 9.10 Checks on General reetion & Installation: (Checks that the Components are installed as described in DHU Schematic Drawing: those show deviation. INSTALLATION QUALIFICAT PROTOCOL CUM REPORT FOR DEHUMIDIFYING UNIT DIU Nox MLIPBIDHU-02 | PORMATNo: CQA-004/F03.00 | [ Deviations Observed: []Ne devotions obgened Rw Remarks / Supervisor Sign: “Docament covered under IPR of LLLP. and shoul nol be eprodace without wurst @ scanned with OKEN Scanneri _— —_$L — [Pro wie | MALIK LIFESCIENCES | INSTALLATION QUALIFICATION a | ras PVT.LTD, PROTOCOL CUM REPORT — LEUPIQME NM HARIDWAR FOR puis DEHUMIDLEYING UNIT | Eee SSS SEeEeee _DITU Now: ML/PIDHU02 ie Checks on Documentation : | | The List of Documents (& drawing) t be verified for availability is as follow: oad | Provided in DITU Nos MEPBIDINO-02 | [Mu Filer Centficate | Bo avessbeWe ‘iter Certificate Ye ed tol Ne Asatotly — 3yFilterCertifcate | Yes aveslable Aaatouli, | | [03 y Filter Cerificate Soy available Adios toute | | Radix display Yor _auaslable tots DHU MOC Cerificate —_beravailelle Chea lod ilk | DITU Blower Cetfica Ger averilable Eo le/le | [DU CHW Coil Ceniticate Gey, auatlable Erase 4 | | er Ye), cverilable [EX geet 4 | | Schematic Drawing Yes available Qa tou sy | [Ducting Drawing Sey, aver lable bene Hote fy || MocorDuet Gey available kza fot lu | [MOC of fnsutation psiavedlable | eb toute DIU Operation & Maintenance : ela ge rovesleble ecu ‘Deviations Observed: ‘Remarks / Supervisor Sign: Vodimohions obsevud Alou | j | i 2 oly Time: 49199 ts = T—aaa ES FORMAT Noz CQA-OOWFIB4 “Document covered wader IPRofM.LP.L and should not be reproduced without wuthriaion” @ scanned with OKEN Scannerne REFERENCES PLL, 7 Tarmvar FOR INstaLLATiON quaLFication | PROTOG fi i 7 nM REPOR DuruiPiQrP has PROTOCOL CUM REPORT FECTIVE DAT [posi UMIDIFYING UNIT DIVU No.: ML/PB/DEU-02 Design Qualification Protocol Cum Report Approved Design & Specification. GA and P & 1D Drawings Functional Specification DOCUMENTS TO BE ATTACHED: Copy of Purchase order User Requirement Specification Heat load Calculation sheet Operation and Maintenance Manual Terminal detail DHU Wise Zoning | Ai Flow Diagram Functional Specification Electrical Drawing Schematic Drawing GA and P & ID Drawings Decting Layout Any Other Relevant documenis. FORMATNo
You might also like
PQ Protocol - DPB-01
PDF
No ratings yet
PQ Protocol - DPB-01
22 pages
PQ Protocol
PDF
No ratings yet
PQ Protocol
24 pages
PQ Protocol For Metal Detector
PDF
50% (2)
PQ Protocol For Metal Detector
11 pages
PQ Templet - Water Bath - New
PDF
No ratings yet
PQ Templet - Water Bath - New
7 pages
PQ Protocol For Colloidal Mill
PDF
100% (2)
PQ Protocol For Colloidal Mill
12 pages
Installation Qualification Protocol For Automatic Polarimeter
PDF
100% (1)
Installation Qualification Protocol For Automatic Polarimeter
11 pages
TD PQ
PDF
100% (1)
TD PQ
20 pages
Iq Ahu 01 1944 CFM D
PDF
100% (1)
Iq Ahu 01 1944 CFM D
25 pages
Ncdeevpb 15
PDF
0% (1)
Ncdeevpb 15
8 pages
Principles of Cleanroom Validation
PDF
100% (1)
Principles of Cleanroom Validation
8 pages
Ahu Design Qualification Document
PDF
100% (1)
Ahu Design Qualification Document
28 pages
Operational Qualification For Dynamic Pass Box
PDF
No ratings yet
Operational Qualification For Dynamic Pass Box
13 pages
CommMill IQOQPQ
PDF
100% (2)
CommMill IQOQPQ
16 pages
Installation Qualification (Iq) Protocol FOR Mechanical Sifter
PDF
100% (2)
Installation Qualification (Iq) Protocol FOR Mechanical Sifter
22 pages
IQ OQ PQ of Laminar Air Flow For Quadra Medical
PDF
No ratings yet
IQ OQ PQ of Laminar Air Flow For Quadra Medical
3 pages
HVAC System Validation - Pharmaceutical Guidelines
PDF
No ratings yet
HVAC System Validation - Pharmaceutical Guidelines
2 pages
DQ IQ OQ PQ of Electronic Balance 100 KG
PDF
No ratings yet
DQ IQ OQ PQ of Electronic Balance 100 KG
8 pages
Ahu Installation Qualification Document
PDF
100% (4)
Ahu Installation Qualification Document
32 pages
Qualification Documents PDF
PDF
No ratings yet
Qualification Documents PDF
14 pages
Cleanroom Validation Results Sampling and Common Dispensing
PDF
100% (2)
Cleanroom Validation Results Sampling and Common Dispensing
18 pages
Iq DB
PDF
100% (1)
Iq DB
10 pages
DQ - Nkew-200
PDF
100% (1)
DQ - Nkew-200
22 pages
Urs PLM
PDF
100% (1)
Urs PLM
17 pages
Installation Qualification Protocol For Air Handling Unit & Air Distribution System
PDF
100% (1)
Installation Qualification Protocol For Air Handling Unit & Air Distribution System
13 pages
PQ - Ahu-01
PDF
100% (2)
PQ - Ahu-01
12 pages
DQ Ahu G19
PDF
No ratings yet
DQ Ahu G19
23 pages
IQ
PDF
100% (1)
IQ
142 pages
HVAC System Validation
PDF
0% (1)
HVAC System Validation
4 pages
MM-001 Oq Protocol
PDF
No ratings yet
MM-001 Oq Protocol
12 pages
Operational Qualification Protocol Cum Report FOR Paste Kettle
PDF
No ratings yet
Operational Qualification Protocol Cum Report FOR Paste Kettle
19 pages
Iq Ahu-01
PDF
100% (3)
Iq Ahu-01
26 pages
OPERATIONAL QUALIFICATION PROTOCOL FOR COATING MACHINE - Pharmaceutical Guidance
PDF
100% (1)
OPERATIONAL QUALIFICATION PROTOCOL FOR COATING MACHINE - Pharmaceutical Guidance
9 pages
IQ Protocol of AHU-G-03........
PDF
No ratings yet
IQ Protocol of AHU-G-03........
14 pages
Design Qualification Protocol FOR Hvac System of Ahu-06: Project: New Production Block
PDF
No ratings yet
Design Qualification Protocol FOR Hvac System of Ahu-06: Project: New Production Block
30 pages
12.3 Operation Qualification Protocol For Laminar Air Flow Unit
PDF
No ratings yet
12.3 Operation Qualification Protocol For Laminar Air Flow Unit
4 pages
Dq&iq (Hvac) - 2
PDF
100% (1)
Dq&iq (Hvac) - 2
38 pages
PQ Protocol For Paste Kettle
PDF
100% (2)
PQ Protocol For Paste Kettle
11 pages
DQ Protocol Air Shower
PDF
100% (3)
DQ Protocol Air Shower
5 pages
Design Qualification Protocol Cum Report For Lifting Positioning Device
PDF
No ratings yet
Design Qualification Protocol Cum Report For Lifting Positioning Device
12 pages
Ahu - PQ-14.10.10
PDF
No ratings yet
Ahu - PQ-14.10.10
24 pages
Performance Qualification Protocol For Fluid Bed Dryer
PDF
100% (1)
Performance Qualification Protocol For Fluid Bed Dryer
15 pages
Helix Pharma (Private) Limited: Validation Protocol
PDF
No ratings yet
Helix Pharma (Private) Limited: Validation Protocol
3 pages
IQ Protocol Pass Box
PDF
100% (1)
IQ Protocol Pass Box
6 pages
OQ of FBD
PDF
100% (2)
OQ of FBD
22 pages
GMP Chklist PDF
PDF
No ratings yet
GMP Chklist PDF
34 pages
Facility Qualification Protocol 1
PDF
100% (3)
Facility Qualification Protocol 1
11 pages
CV Protocol
PDF
No ratings yet
CV Protocol
4 pages
VAL 090 Equipment Validation Guideline Sample PDF
PDF
100% (1)
VAL 090 Equipment Validation Guideline Sample PDF
2 pages
Operational Qualification For Compressed Air System.
PDF
67% (3)
Operational Qualification For Compressed Air System.
11 pages
URS User Requirement Specification in Pharma-Clean Room
PDF
100% (1)
URS User Requirement Specification in Pharma-Clean Room
3 pages
Installation Qualification: 1.0 Protocol Approval Sheet
PDF
No ratings yet
Installation Qualification: 1.0 Protocol Approval Sheet
32 pages
Design Qualification (DQ) of Equipment - Pharmaguideline
PDF
100% (1)
Design Qualification (DQ) of Equipment - Pharmaguideline
2 pages
HVAC Installation Qualification Protocol - IVT
PDF
No ratings yet
HVAC Installation Qualification Protocol - IVT
36 pages
Helix Pharma (Private) Limited: Validation Protocol
PDF
100% (1)
Helix Pharma (Private) Limited: Validation Protocol
4 pages
02 URS For AHU Modification
PDF
No ratings yet
02 URS For AHU Modification
8 pages
Hvac Iq
PDF
No ratings yet
Hvac Iq
10 pages
DQ Cabina de Flujo Laminar
PDF
No ratings yet
DQ Cabina de Flujo Laminar
6 pages
IQ - OQ - (Arctiko Refrigerator Form) Unclocked
PDF
No ratings yet
IQ - OQ - (Arctiko Refrigerator Form) Unclocked
6 pages
Hvac Validation Report
PDF
No ratings yet
Hvac Validation Report
3 pages
12.2 Installation Qualification Protocol For Laminar Air Flow Unit
PDF
No ratings yet
12.2 Installation Qualification Protocol For Laminar Air Flow Unit
10 pages
Validation of Dynamic Pass Box
PDF
100% (2)
Validation of Dynamic Pass Box
5 pages
PROTOCOL Checkweigher CWG 600 R 2016 APRIL
PDF
No ratings yet
PROTOCOL Checkweigher CWG 600 R 2016 APRIL
25 pages
Operational Qualification Protocol Cum Report For Stirrer
PDF
100% (1)
Operational Qualification Protocol Cum Report For Stirrer
17 pages
Dynamic Pass Box-Pq
PDF
100% (2)
Dynamic Pass Box-Pq
5 pages
Scan 20200918112957
PDF
No ratings yet
Scan 20200918112957
1 page