0% found this document useful (0 votes)
24 views1 page

Key Personnel TEMPLATE

Uploaded by

Claude Reyes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views1 page

Key Personnel TEMPLATE

Uploaded by

Claude Reyes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

CITY OF CABUYAO
Province of Laguna

KEY PERSONNEL & EQUIPMENT

Project: Asphalt Overlay along Katapatan Subdivision Main Road

12.1 (b) (ii.2) The minimum work experience requirements for key personnel are the following:

Key Personnel General Experience Relevant Experience Years of Experience


Civil Engineer Construction Structural, Civil Works 3 Years
Geodetic Engineer Construction Geodetic Works 3 Years
Instrument Man Construction Surveying Works 3 Years
Electrical Engineer Construction Electrical Works 3 Years

Mechanical Engineer Construction Mechanical Works and 3 Years


HVAC
Master Plumber Construction Plumbing Works 3 Years
Master Electrician Construction Electrical Works 3 Years
Safety Officer Construction COSH Cert 1 Year
Sanitation Aide Construction Sanitation Works 1 Year
Health Personnel Construction Certified First-Aider 1 Year
Electrician Construction NCII 5 Years
Plumber Construction NCII 5 Years
Mason Construction NCII 5 Years
Welder Construction NCII 5 Years
Carpenter Construction NCII 5 Years
Steel Man Construction NCII 5 Years
Painter Construction NCII 5 Years
Scaffolder Construction NCII 5 Years
Crane Operator Construction NCII 5 Years
Excavator Operator Construction NCII 5 Years

Truck Driver Construction Knows how to drive 5 Years


trucks

Payloader Operator Construction Payloader Operator 5 Years


Certification
Backhoe Loader Construction NCII 5 Years
Flagman Construction Traffic Control 1 Year
Tile Setter Construction NCII 5 Years

12.1 (b) (ii.3) The minimum major equipment requirements are the following:

Equipment Capacity Number of Units


Total Station 1,500 meters (4,900 ft) 1
Welding Machine 20 - 400 Amperes 1
Cut Off Machine 2400W 1
One Bagger Mixer 7HP 1
Jackhammer 3500 watts 1
Dumptruck 20 cubic meter 1
Dumptruck 12 cubic yard 1
Dumptruck 10 cubic meter 1
Pumpcrete 28 Mpa 1
Truck Crane 25 Tons 1
Crawler Excavators 30,000 kg 1

Bar Bender 7.8 R/min & 8 to 36 mm 1


Bending Diameter
Bar Cutter 2880 R/min 1
Mobile Crane 12T 1
Concrete Vibrator 5.5 HP 1
Concrete Screeder 5.5 HP 1
Concrete Saw 7.5 HP 1
Grinder 11 HP 1
Power Trowel 9 HP 1
Chipping Gun 1.5kW 1
Cargo Truck 2-5 mt 1
Cargo Truck 5 Tons 1
Backhoe w/ Breaker 0.8 cubic meters 1
Backhoe 0.8 cubic meters 1
Cutting Outfit 6 inches 1
Payloader 1.5 cubic meters 1
Plate Compactor 5HP 1
Vibratory Roller 10mt 1
Joint Sealer Machine 50L 1
Applicator Machine 100kg 1
Kneading Machine 10-15kg 1
Motorized Road Grader 140HP 1
Water Truck 1,000 gallons 1
Water Truck 16,000L 1
Backhoe (Wheel Type) 0.28 cubic meters 1
Power Sprayer 7.5HP 1
Thermal Scanner -30°C~450°C (-22°F~842°F) 1
Portable Mist-Based Sanitation Te 250 psi 1
Asphalt Paver 80 HP 1
Pneumatic Tire Roller 1
Tandem Steel Roller 10m.t., CC41 1
Roto Milling Machine 1
Asphalt Distributor 10 ft. wide (5 tons) 1
Power Broom 20m. Wide 1
Air Compressor 1
Generator 15-25kVA 1
Barricade Flasher Lights 3V 1
Circular Saw 15A 1

Prepared by: Checked by:

ENGR. KEISHA A. SANTIAGO ENGR. VINCE FROILAN D. ANGBENGCO


Engineer I Engineer II

Noted by:

AR. PABLO RONILO L. TECSON


OIC - City Engineering Office