Sectional Door Installation Manual

Download as pdf or txt
Download as pdf or txt
You are on page 1of 92

Directions for installation

of garage and industrial


sectional doors

https://youtu.be/2yk8IqZcYlM
Watch installation video on Youtube

12.12.08
1. Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3. Embrasure requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Garage sectional doors RSD02 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Industrial sectional doors series ISD01 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Industrial sectional doors series ISD02 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4. Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
5. Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
6. Safety provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
7. Installation of doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Hardware unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Bottom panel assembling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Middle panels assembling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Top panels assembling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Vertical tracks installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Horizontal tracks installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
End U-shaped support brackets installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Cross-bar sleeves installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Panels installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Torsion gear installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Loading of the spring with cylindrical shaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Fastening to the ceiling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Cable tension adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
C - profile installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Buffer installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Bumper installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Handle installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Catch installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
8. Door operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
9. Supplement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Octagonal shaft, spring loading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
End bracket support installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Door lock installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Torsion gear “spring in spring” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Installation of spring failure safety device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

2 installation of garage and industrial sectional doors


Cable safety device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Cable break safety device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Installation of bottom corner bracket for drum behind . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Installation of solid steel coupler on octagonal shaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Installation of bottom corner bracket with cable tension device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Installation of nonadjustable coupler for cylindrical shaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Installation of 31.75mm diameter shaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Manual chain operator installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Wicket door closer installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Omega-profile installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Installation of double side supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Installation of halyard capronic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Aspects of vertical and high lift installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Two-shaft system on end support brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Two-shaft system on U-shaped end support brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Chain tension device installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Mounting of torsion gear with remote octagonal shaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
Aspects of two-shaft system of torsion gear with remote octagonal shaft mounting . . . . . . . . . . . . . . . . 73
Cable support installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Installation of end support bracket at vertical lift . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
Installation of bumper at vertical lift . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Aspects of low lift mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Roller’s top support installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Horizontal track installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Installation of end support bracket at low lift . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Fastening of horizontal tracks to the ceiling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Buffer installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Low lift, drum from behind, pulley installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Low lift, drum from behind, mounting of torsion gear with octagonal shaft . . . . . . . . . . . . . . . . . . . . . . . 83
Low lift, drum from behind, installation of end support brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Dismounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
Upgrading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
10. Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

installation of garage and industrial sectional doors 3


2 Introduction

Introduction

Thank you for choosing our products!


Respecting operation, maintenance and mounting recommendations of the directions ensure safe instal-
lation and operation of the equipment over a long period.
Do take safety measures while operating and mounting the equipment.
In case of loosing this directions you could make request for directions duplicate and contact us by the
following address:
Contents of the directions shall not be basis for any claims.
Sectional door design as well as the present directions are subject to change without notice.

4 installation of garage and industrial sectional doors


Embrasure requirements 3

Embrasure requirements

Required dimensions:
H - embrasure height (embrasure bottom-to-top);
B – embrasure width ( distance between left and right edges of the embrasure);
h – lintel (distance between the top of the embrasure and the ceiling) not less than 150 mm ( without chain electric drive);
b1 and b2 – (distance between embrasure edge and side interior garage wall) must not be less than 130 mm, if with remote shaft – 500 mm;
D – garage depth (distance between embrasure edge and interior garage wall) must be more than H+ 500 mm.

By measuring the above mentioned dimensions we recommend to measure each value in not less than 3 points.
By measuring H and B the largest value should be recognized as a final value, by measuring h, D, b1 and b2
the smallest value should be recognized as a final value.

installation of garage and industrial sectional doors 5


3 Embrasure requirements

If electric drive is installed


For installation of the doors with the chain electric drive lintel value (h) must not be less than 200 mm.
For installation of the doors with the shaft electric drive one of the side dimensions (b1 or b2) must not
be less than 250 mm, and if the shaft is from below it must not be less than 500 mm.

While measuring following additional parameters must be taken into consideration


Embrasure shape (embrasure shape can be rectangular or have other shape).
Embrasure plane surface must be even and smooth. Floor level difference along the whole embrasure
length must not exceed 1 cm.
The space required for door mounting must be free and must not be blocked up.
If preparation of embrasures by the Customer does not satisfy above mentioned requirements, the
Customer should eliminate defects before door mounting.

6 installation of garage and industrial sectional doors


Embrasure requirements 3

GARAGE SECTIONAL DOORS RSD02


Garage sectional doors RSD02 open smoothly and do not need extra space before the garage, they can be compacted inside it. Due to
variety of door designs and capability to manufacture up to 5 m wide and 3 m high doors an ideal solution can be found practically for any
premise. Rigid framework made of galvanized steel ensures a long service life of the sectional doors, protects from breaking.

H – embrasure height – 1.8 -3 m;


B – embrasure width – 2-5 m;
h – lintel (distance between embrasure top and the ceiling)
– not less than 150 mm (a particular track type is defined
by the lintel value);
b1 and b2 – distance from embrasure edge and side internal
wall – not less than 130 mm;
D – (distance between embrasure and internal garage wall)
– more than H+500 mm.
8 types of door guide system designs.
Large color box of sandwich-panels, wide range of optional
equipment.

installation of garage and industrial sectional doors 7


3 Embrasure requirements

INDUSTRIAL SECTIONAL DOORS SERIES ISD01


Industrial sectional doors are installed mainly in factories and plants, warehouses, workshops and terminals where they are to satisfy more
stringent requirements than standard garage doors do.
As a rule, the industrial sectional doors are heavy constructions operated daily very strongly, they are resistant to wind load and close
hermetically production area doorway.

H – embrasure height – from 2 m up to 8 m;


B – embrasure width – from 2 m up to 7 m, at high lift – up to 8 m;
h – lintel – not less than 150 mm (particular guide type is defined by
the lintel value);
b1 and b2 – not less than 130 mm.
11 types of door guide system design

8 installation of garage and industrial sectional doors


Embrasure requirements 3

INDUSTRIAL SECTIONAL DOORS SERIES ISD02


Panoramic sectional doors ISD02) are very popular and are installed in modern architecture buildings with window fronts and
shop windows, motor shows, exhibition and technical centers, where interior must be seen through clear glasses.

H – embrasure height – from 2 m up to 8 m;


B – embrasure width – up to 6 m;
h – lintel (distance between embrasure top and the ceiling) –
not less than 150 mm (for low lift drum from behind);
b1 and b2 - distance between embrasure edge and side
internal wall – not less than 130 mm.
D – depth – more than H+500 mm;
11 types of door guide system design.

installation of garage and industrial sectional doors 9


4 TOOLS
We recommend to use the following tools for door mounting:
1. Drill 2. Riveting tool 3. Measuring 4. Cross OPTIMAL ERECTION CREW SIZE
tape 5 m screwdriver Optimal erection crew size – 2-3 people,
depending on door size. In average mounting
of one door by one erection screw takes 4-6
hours.

RECOMMENDED MATERIALS AND HARDWARE


FOR DOOR MOUNTING
For door mounting different fastening ele-
5. Attachments for 6. Builder’s 7. Pencil 8. Gloves ments can be used, depending on embrasure
drill S10, S12 level 0.5 m material properties. All fasteners must be resis-
tant to corrosion.
10
12

9. Ladder - 2 pieces 10. Set of drilling 11. Hammer 12. Protective 13. Mounting driver
bits glasses 0.5 mm
(2 pieces)

14. Helmet 15. Set of spanners 16. Knife 17. Combination 18. Polishing
pliers machine

10 installation of garage and industrial sectional doors


HARDWARE 5

3 9 6 5 24

17

16

4 14

7 7

2 1 18 21 20 19

Sectional door shield System of guides and torsion gear

installation of garage and industrial sectional doors 11


5 HARDWARE

In this directions of sectional door mounting the doors with standard lift are taken as an example. In supplement you can find aspects of
sectional doors with different lifts and hardware mounting as well as installation of optional equipment.

1. Bottom panel 1 piece 2. Middle panel * piece 3. Top panel 1 piece

4. C – profile 1 piece 5. Torsion gear in assembly * piece 6. Horizontal tracks in assembly 1 pair

* - quantity depends on door size


** - installation depends on the door hardware

12 installation of garage and industrial sectional doors


HARDWARE 5

7. Corner support in assembly with vertical 8. Installation profile (32x32x2 mm) 9. Multi-purpose corner bracket for fastening
track and side seal 1 pair ** * piece to the ceiling ** * piece

10. Bolt for assembly of guides 11. Nut (1/4'') * piece 12. Buffer in assembly with fastening
(1/4'' х 3/4'') * piece ** 2 piece
* - quantity depends on door size
** - installation depends on the door hardware

installation of garage and industrial sectional doors 13


5 HARDWARE

13. Set of cross-bar sleeves 2 sets 14. Spring bumper ** 1 pair 15. Roller * piece

16. Side support with roller holder * piece 17. Top support with roller holder 2 piece 18. Internal hinge * piece

* - quantity depends on door size


** - installation depends on the door hardware

14 installation of garage and industrial sectional doors


HARDWARE 5

19. Bottom corner bracket with wedge- 20. Catch 1 piece 21. Handle & footstep for industrial
operated cable fastening 1** pair sectional doors 1 piece

24. End support U-shaped bracket 1 pair 25. Internal support bracket * piece 26. Tapping screw 6.3x38 mm for door
panels * piece

* - quantity depends on door size


** - installation depends on the door hardware

installation of garage and industrial sectional doors 15


5 HARDWARE

27. Bolt with semi-rounded head 28. Flanged nut (M8) * piece 29. Lock plate * piece
(M8x25) * piece

30. Tapping screw (8x70 mm) * piece 31. Dowel key PVC * piece 32. Washer 8x24 * piece

* - quantity depends on door size


** - installation depends on the door hardware

16 installation of garage and industrial sectional doors


HARDWARE 5

33. Bushing key * piece 34. Bushing for cable * piece

* - quantity depends on door size


** - installation depends on the door hardware

installation of garage and industrial sectional doors 17


6 SAFETY PROVISIONS

SAFETY PROVISIONS

Mounting must be carried out only with SAFETY PROVISIONS FOR them upward, transfer must be performed by
working clothes that does not restrain move- WORK AT A HEIGHT means of a durable rope.
ment, protective helmet and gloves on. • Work at a height 1.5 m and more above the
During drilling of materials that can cause floor surface belongs to work performed at SAFETY PROVISIONS AT WORK
shaving bouncing, during metal chipping a height. During work at a height safety belt WITH LADDERS
and cutting protective glasses must be used. for mounting work must be used. If safety Ladders must be equipped with a safety
For respiratory organs protection against belt fastening to the construction parts is device to prevent displacement and upset
construction dust a respirator must be used. not possible, safety rope extended behind during mounting. Bottom ends of the lad-
Hammer panes must have smooth, slightly construction parts in advance should be ders must have binding with sharp tips for
convex surfaces without dents, slants, cold used. In this case work must be performed placement on the ground and for placement
hardening, chips and chaps. Hammer shaft by 3 erectors. Implements and tools must of ladders on smooth surfaces (metal, slab,
length must not be less than 250 mm, be fixed to avoid their downfall during concrete) they must be booted in rubber or
hammers must sit fixedly on shafts and work on constructions situated over alive other slip resistant material.
wedged. Hand holds of all tools with sharp live parts. It is forbidden:
tips for them must be not less than 150 • Use of safety belts with metal chain slings • to work standing on the ladder step at less
mm. Wooden hand holds must be tied up at work on constructions located over alive than.
with band rings. Impact tools must not have live parts is FORBIDDEN.
oblique and battered tails, cracks, burrs. • Transfer of door elements, tools and imple- SAFETY PROVISIONS
Spanners must not have splits and nicks, ments for mounting upward must be carried 1 m distance from its top;
must match nuts and bolt heads dimensions; out using an endless rope. The rope must • to operate power tool standing on ladders;
spanner fingers must be parallel, must not be kept from swinging and approaching live • to work standing on two upper steps of
be worked out and rolled. To transfer work- parts by the standing below worker. ladders without railing or support;
ing tools to the work place special bag or It is forbidden: • presence of more than 1 person on the ladder;
chest must be used. Use special belts to lay • to stand under the ladder from which work • to stand under the ladder from which work
tools during work. Do not put tools in the is carried out; is carried out;
working cloth pockets. • to throw up any subjects in order to transfer • to put tools on ladder steps.

18 installation of garage and industrial sectional doors


SAFETY PROVISIONS 6

SAFETY PROVISIONS AT WORK • Check of parts set completeness and


WITH ELECTRIC TOOLS attachment security;
Only workers that got special training and • Visual inspection of cable(cord), its protec-
instruction at place of work and have proper tive tube, male plug intactness, case isolat-
qualification in electrical safety are allowed ing parts, handle and brush-holder caps
to operate electrical tools. During mounting integrity, protective housing presence and
work electrical tools that require voltage not intactness;
more than 380/220 volt should be used. The • Check of earthed circuit intactness (between
electric tool type must be selected according case and ground contact of male plug);
to the shock hazard grade of the premise. • Check of switch functioning accuracy;
Metal case of electric tool that require volt- • Check of electric tool idle running.
age more than 42 volt alternate current and Use only intact and checked tools at work.
more than 110 volt constant current for During work avoid breaking and bending of
operating in premises with high shock haz- electric drive as well as its laying in places of
ard is very dangerous and must be earthed construction, materials storing and traffic.
by outside installation. Connection plug must During work at rainy weather (during snow-
have ground contact. The tool must be con- fall), sites where cable is laid and work with
nected with electrical supply network that electric tools is carried must be equipped
have earth connection. Extension plugs and with sheds.
sockets must have ground contacts. At work
with such tools protective means (rubber SAFETY PROVISIONS AT ELECTRIC
gloves and shoes) must be worn. Protective INSTALLATION WORK
means must be tested in accordance with the Electric installation should comply with
current legislation. the standards of the electrical installation
Before start of work it is necessary to do the arrangement and with safety regulations for
following: electric plant operating.

installation of garage and industrial sectional doors 19


7 DOOR MOUNTING

MOUNTING OF SECTIONAL DOORS WITH STANDARD LIFT

Hardware unpacking

Bottom panel Middle panel Top panel

The bottom panel is delivered as a unit of The middle panels are delivered as a unit of The top panel is delivered as a unit of side
side caps, an aluminum bottom profile (riv- side caps (riveted to the panel). The panels caps, an aluminum bottom profile (riveted to
eted to the panel) and a bottom rubber seal. have drilled holes for fastening of internal the panel), a bottom rubber seal.
The panel has drilled holes for fastening of hinges. The side caps are punched to enable
internal hinges. The side caps are punched to fastening of the side supports bottom parts.
enable fastening of the side supports bottom Quantity depends on embrasure height.
parts. The panel has operational opening for
handle installation (on industrial doors).

20 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Assembling of bottom panel

Disconnect the roller holders from the side Position the side caps on drilled openings, Place the bottom corner bracket on the
supports. using 4 tapping screw 6.3х38 mm. bottom panel. Mark and drill ∅4.2 mm holes
to fasten it. Fix the bracket using 4 tapping
screw 6.3х38 mm (as shown in the figure).

Install the internal hinges on ready-made Fix the hinges using two taping screws.
holes in the panel. The holes in the bottom
part of the hinge must index the holes in the
panel made at plant.

installation of garage and industrial sectional doors 21


7 DOOR MOUNTING

Assembling of middle panels

Disconnect the roller holder from the side Install the side support on the drilled holes. Install the internal hinges on the panel holes
supports. made at the manufacturing plant. Holes in the
bottom part of the hinge must index the holes
in the panel made by the manufacturer.

Fix the hinges using taping screws for door


panels.

22 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Top panel assembling

Install the top roller supports and fix using


tapping screws for panels.

Vertical tracks installation

The vertical tracks are delivered in assembly Before installation of the vertical tracks check If for C-profile levelling you need plates,
with corner supports. floor horizontality. For that place the C-profile these plates must be used during installation
on the floor and check its horizontality with a of the vertical tracks.
builder's level.

installation of garage and industrial sectional doors 23


7 DOOR MOUNTING

25-30

Before installation of the tracks the bottom Than install the vertical tracks on the panel. The distance from the edge surface of the panel
panel must be installed in an embrasure so, must be about 25-30 mm.
that its edges overlap the embrasure evenly
on two sides.

Mark the holes in the embrasure wall using Drill holes ∅12 mm in the embrasure wall.
perforation in the corner support as a Hammer in dowels in the holes.
templet.

24 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Fix the corner supports to the embrasure wall using two tapping screws with washers, but do
not tighten them. Level the vertical tracks and only then tighten the tapping screws.

Horizontal track installation

The horizontal tracks are delivered in assembly Fasten the horizontal and vertical tracks using Fix the horizontal track C-profile to the corner
with a C-profile to increase rigidity of the two bolts for tracks assembling and nuts and support. Before tightening of bolts the tracks
tracks. The C-profile and the horizontal tracks the connection plate, that is positioned in a must be leveled with a builder's level.
have the openings for fastening to the vertical tracks joint point.
tracks and the corner support.

installation of garage and industrial sectional doors 25


7 DOOR MOUNTING
U-shaped end support brackets installation

Use of the U-shaped end support brackets Install the U-shaped bracket close to the corner support, matching the bracket and corner
ensures high manufacturability of assembling, support corners. The external bracket wall must match the corner support plane. According to the
mounting and adjustment of the torsion perforation in the bracket mark holes for fastening in the embrasure wall. Drill the marked holes
gear. with a drill Ш 12 mm. Hammer in dowels in the wall. Fix the bracket to the lintel using tapping
screws (do not tighten the tapping screws).

Check horizontality of the brackets installation ATTENTION: the bracket must be installed
using the C-profile (use of a laser level is in such a way, that the bracket's bend looks
admissible). upward.

26 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Cross-bar sleeve installation

Cross-bar sleeves are used to limit door Select and install cross-bar sleeves on the
leaf run along the embrasure plane. Install roller axes of the bottom corner brackets
the sleeves on the roller axis of the top according to the bottom corner bracket type.
supports.

installation of garage and industrial sectional doors 27


7 DOOR MOUNTING
Installation of panels

Insert the rollers in the bottom corner bracket Level the bottom panel with a builder's Install other panels in the same way.
roller holders and install bottom panel. Install level. If required use supports of a required
the rollers with the roller holders on side thickness.
supports.

Install the roller holders on the side In case if there are no drilled holes of the Drill the marked holes ∅4mm 25-30mm
supports. hinge upper part in the panel, mark the holes deep.
for fastening of the internal hinges' upper
parts and the side supports.

28 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Fix the upper parts of the hinges with tapping Install the top panel. Make adjustments of
screws for panels. the upper roller position to ensure the panels
abutment on the embrasure.
Torsion gear installation

right left

The twisting direction of the springs must match it winding. That is the right spring must be Torsion gear is installed in the U-shaped end
twisted counter-clockwise and the left spring must be twisted clockwise. support brackets and supported additionally
with the multi-purpose internal bracket.

installation of garage and industrial sectional doors 29


7 DOOR MOUNTING

If the shaft consisting of two parts is being Connect two parts of the shaft using the coupler
installed, use the connection coupler to and having inserted bushing keys in the key
enable adjustment of the cable. slots of both parts of the coupler. Tighten the
bolts connecting the coupler's parts.

Far Near

Install the torsion gear in assembly so, that


the end plate with bushing is flush with the
bracket's external wall. Put on the shaft the
closing ring, it must abut on the bearing.
Fasten the end plate with bearing to the U-shaped bracket using two bolts (М10х25) with suitable
nuts and washers. Fasten the torsion gear on other side in a similar manner.

30 installation of garage and industrial sectional doors


DOOR MOUNTING 7
Relation between installation of end plate with bearing and installed end support U-shaped brackets and the type of the drum is represented in the table.
End U-shaped support CLOSE OMI8 OMI12 DH11000 DH11011 OMI54-HL-LD
bracket 127/152 mm
FAR OMI18 OMI54HL

End U-shaped support CLOSE OMI11VL OMI120HL


bracket 174 mm
FAR OMI32 OMI18VL OMI164HL

End U-shaped support


bracket 174 mm OMI28VL

Fasten the spring failure safety device to the U-shaped bracket using 2 sets of fastening units (bolt During installation of the bottom corner
10X25, nut M10, spring washer 10). support run the cable in the wedge-shaped
pocket on the bracket, place the wedge in the
cable hinge, draw the cable and the wedge
in the wedge-shaped pocket and fix with a
cramp and a tapping screw. The fifth tapping
screw represented by the arrow in the figure
must be tighten last of all.

installation of garage and industrial sectional doors 31


7 DOOR MOUNTING

Loading of the spring with cylindrical shaft

Right winding spring Right winding spring

There is a special marking strip on the spring, After the spring is loaded block it by putting
that indicates the amount of spring winds. the supports under the mounting drivers,
Design number of spring turns is indicated in tighten the bolts of plug fastening to the shaft
the mounting card. and remove the mounting drivers.

ATTENTION: The spring is loaded by means of two mounting drivers, that are inserted in the
special openings in the plug.

32 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Fastening to the ceiling

The guides are fastened to the ceiling by using different bracket types depending on the lintel
height and the door leaf dimensions.
А) Fastening with multi-purpose corner brackets.

Fasten the bracket to the horizontal track with a lock plate, a bolt and a nut. If required, corner 32х32 mm is used to extend
the bracket.

Mark the holes for fastening the bracket to Drill the holes ∅12 mm and insert dowels.
the ceiling. Fix the bracket using tapping screws and
washers.

installation of garage and industrial sectional doors 33


7 DOOR MOUNTING

B) Fastening by using mounting corners.

The mounting corners are assembled of Place the mounting angle against the guides in the fastening position. Mark and drill openings
punched angle bar 32х32 mm taking into in the ceiling. Fix the mounting corner with tapping screws, washers and dowels.
account the spacing between the horizontal
tracks and the ceiling.

A
B

Check tracks horizontality using the builder's level. If required, correct the track's horizontality,
moving the holes in the punched angle bar along the slots of the multi-purpose corner bracket.
Leveling of the diagonal A and B is admissible, to do it you have to lift the door leaf up to
the outermost upper position and to check evenness of the clearances between the door leaf
ends and the tracks. Before final fastening of the tracks to the ceiling the spacing between the
opposite angles must be checked (diagonals A and B must be equal).

34 installation of garage and industrial sectional doors


DOOR MOUNTING 7
Cable tension adjustment

А) Cable tension adjustment using bottom corner brackets with cable adjustability.

Lift slightly the door leaf by ~150 mm and Unscrew the tapping screw fastening free end Using a screwdriver lift a little the narrow end
put wooden blocks under the leaf angles. of the cable, using the cramp of fastening to of the wedge. Here the cable will loose and
All upper planes of the blocks must be on the bracket's basis, positioned on the elevated slide and the elevated angle of the door leaf will
one level. Release the door leaf until its angle of the door leaf. Remove the cramp. sink. At the moment the door leaf touches the
lower angle touches the wooden block. The block's surface, hammer the wedge down and
second angle must be remain elevated over fix the free end of the cable with a cramp and
the block. a tapping screw. Check again the cable tension
(they must be tensioned evenly and must not
catch the door construction.

installation of garage and industrial sectional doors 35


7 DOOR MOUNTING

B) Cable tension adjustment using connection coupler with cable adjustability.

Before making adjustment you need to ascertain that the floor is even (without distortion).
Otherwise supports must be laid under the bottom panel of the door leaf.

Loose the bolts that connect two parts of the coupler. Make cable tension adjustment by
revolving of two parts of the shaft. Fix the new position of the coupler with bolts and nuts.

36 installation of garage and industrial sectional doors


DOOR MOUNTING 7

C-profile installation

Fasten the C-profile to the horizontal tracks ends with lock plates, bolts and nuts.

installation of garage and industrial sectional doors 37


7 DOOR MOUNTING

Installation of buffers

The buffers are used to limit the door leaf run


during its opening. Before installation of the
buffers unscrew bolts and nuts and fasten
fastening cramps to the lock plates on the C-profile
using the bolts. Install the buffers symmetrically
relatively the embrasure axis.

Installation of bumpers

Fasten the bumper to the C-profile on both ends


of the tracks using lock plates, bolts and nuts.
Install the bumper so, that if the door is opened,
the bumper's compressed position is not less than
50 % of its stroke length.

38 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Handle installation
The handle for industrial doors is installed in a ready-made opening in the bottom sandwich-panel.

Install 2 parts of the handle asymmetrically relatively each other on different sides of the Insert 2 tapping screws on the external side of
sandwich-panel. the door leaf.

Insert 2 tapping screws on the internal side of Tighten the tapping screws, in the position of The installation of the handle is over.
the door leaf. tapping screws install plastic plugs.

installation of garage and industrial sectional doors 39


7 DOOR MOUNTING

Installation of protruding handle and light handle.

Mark the holes for the installation of Drill 4 holes ∅10-12 mm.
the handle.

After that fasten the handle with tapping screws Installation of the light handle is performed in
∅4.8х35 mm from handle's set. a similar manner.

40 installation of garage and industrial sectional doors


DOOR MOUNTING 7

Catch installation

Install the catch at a suitable height for Drill holes ∅4.2 mm for fastening of the catch and hole ∅15 in the corner support for wicket
opening. Mark fastening holes. latch.

Fasten the catch to the panel using four tapping ATTENTION: The catch must be installed after spring loading in order that the catch latch
screws. Check catch functioning. and the opening in the track were on one axis.

installation of garage and industrial sectional doors 41


7 SUPPLEMENT

Door run check


After mounting the door movement must be checked. The door must move smoothly without
jerks. The rollers must not jam in the tracks. During installation of the doors in any intermediate
height position the door must not move spontaneously up or down.
If during the check the horizontal sidesway of the panels is observed, adjust tension of the
cables.
If the door leaf does not fir tightly to the embrasure the roller position should be adjusted.
Lift the door leaf by 50 mm and lay wooden blocks under it. The position of the roller holders
must be adjusted so, that the rollers abut on the surface of the vertical track cavities. Remove
the wooden blocks and close the door. Check the backlash between the door leaf and the
embrasure, it must be 12 mm.

Operation and maintenance


Proper installation and maintenance of the doors secure reliability and long life of the prod-
uct. To extend durability of your doors follow these instructions. If you open or close the doors
manually do use the handle. Do not apply force to open or to close the doors. Jerky opening or
closing of the doors is forbidden. If automatic operator is used follow instructions enclosed to
the operator.
Do not open the doors by hand if the operator is clutched.
Keep children away from the automatic door control unit (buttons, control panels). Keep
children and animals away from the door coverage during its functioning.
To go or to run under the moving door leaf is strictly prohibited, because it can cause seri-
ous injuries.
Do not expose the door to impacts, do not hinder the door free opening and closing. The
tracks and the rollers must not be dirty, it can cause unevenness of the movement and if electric
drive is available it can cause its overload and breakdown.
See to it that during the door leaf movement there are no restrictions and debris in the
embrasure. Their presence must cause sidesway and jamming of the door. Do not touch movable
parts of the door (rollers, side supports, panels etc) during their functioning to avoid injuries.
In case of misuse of the door the manufacturer shall not be held responsible for its intact-
ness and proper functioning as well as possible injuries and future wrong to people, animals or
objects.

42 installation of garage and industrial sectional doors


DOOR OPERATION 8

Octagonal shaft, spring cocking

The octagonal shaft is used in the torsion There is a special marking strip on the spring, Design number of spring winds is indicated in
gear of the industrial sectional doors due to that indicates the amount of spring winds. the installation card or on a special label on the
its very high strength and reliability. There is side cap of the middle panel.
no need to use intermediate support brack-
ets. It enables simplified and speeded up
mounting as well as improved performance
of the doors.

After loading of the spring block it by putting the supports under mounting drivers, insert the stopper
in the plugs slots, pull out the mounting driver. Tighten the six-sided screws for fastening the plugs to
the shaft.

installation of garage and industrial sectional doors 43


9 SUPPLEMENT

Installation of end support bracket

Install the end support bracket in the holes of the corner support. Mark fastening holes in the embrasure wall using perforation in the bracket. Drill
the marked holes ∅8.5 mm in the C-profile and the holes ∅12 mm in the wall. Hammer in the dowels in the wall. Fasten to the wall the end support
bracket using tapping screws. Fasten the end support bracket, the C-profile and the corner support to each other with bolts М8х25 and nuts.
Installation of the torsion gear by using end support brackets.
Right winding spring Right winding spring

The torsion gear is installed in the end support Install the spring in assembly on the shaft. Install on the shaft the drums for cable.
brackets and is supported additionally by the For the right winding spring the flange for The drums have the marking: the left drum
internal bracket. fastening to the multi-purpose internal bracket marking is (L) and the right one is (R) and
is on the right side. On the side of the bracket must be installed left and right, respectively.
the bearing is installed, its narrow side must
be inside the plug flange. The left winding
spring is installed like mirror reflection.

44 installation of garage and industrial sectional doors


SUPPLEMENT 9

Run the cable through the special technological Run the cable through the ear on the safety In case of lack of the squeezing screw on the
opening. Tighten the squeezing screw, that is coil. The amount of winding turns of the cable drum drill in the side surface of the drums
fix the cable. for each door must be calculated particularly. the holes equal the cable's diameter to run
The data is presented in the mounting card. through the running end of the cable.

Raise the assembled component and install in Drill the marked holes ∅12 mm and fix the Install the bearing in the plug's flange, and then
the support brackets' bearing. Mark the holes intermediate bracket with tapping screws, fix the flange with bolts М10х45 and nuts on
for multi-purpose internal bracket fastening to washers and dowels. the multi-purpose internal bracket.
the wall.

ATTENTION: By installing the balance mechanism with two springs during assembling the right winding spring must be installed on the
left part of the shaft and the left winding spring on the right one.

installation of garage and industrial sectional doors 45


9 SUPPLEMENT

Cable fastening to the drum

Cut the cable into two equal parts. Run the RECOMMENDED: After cable tension adjustment is done fix the
running unsqueezed with the bushing end In case of the adjustable connection coupler cable inserting the squeezing bushing.
of the cable through the drilled hole in the or the bottom corner bracket with fine cable
drum, extend it along the tracks up to the tuning lack you can use the method of cable
bottom corner bracket. Install the drum on the tension adjustment on the squeezing bushing,
corner bracket and coil it with the cable by the running the cable through as shown in the
amount of the turns indicated in the mounting figure. It enables cable adjustment by pickling
card. Fasten the bracket to the shaft with the the cable on the bushing from the drum
fastenings bolts. direction.

46 installation of garage and industrial sectional doors


SUPPLEMENT 9

Installation of lock for wicket

The lock is recommended to be installed on Mark and drill 4 holes ∅4 mm and 15-20 mm Fasten with 4 tapping screws the catch housing
the second panel from below on the right side deep from the inside of the door to fasten the to the door panel.
of the door leaf (the premise inside view). housing of the catch.

Open the door and drill ∅15 mm hole in the Place the lock housing against the panel Drill the marked holes 3 holes ∅5.5 mm for
cornet support to enable the lock latch entry. taking into account the length of the rod, fastening of the lock, under the lock handle
connecting it with the lock catch and mark the and cylinder using the drill ∅19 mm.
holes for fastening of the lock under the lock
handle and its cylinder.

installation of garage and industrial sectional doors 47


9 SUPPLEMENT

Install the outer support and fasten it by using three screws and nuts, from the lock components Put the internal handle on the shank. Screw
set. them.

Install the cylinder and fasten it to the lock Install the rod, connecting the catch angle and After mounting check for the lock latch run
housing using a screw. the lock tongue. smoothness and the catch functioning.

48 installation of garage and industrial sectional doors


SUPPLEMENT 9

Torsion gear “spring in spring”

The torsion gear “spring in spring” is installed Install an additional bracket for double springs Mark the points for its fastening to the
if the embrasure height is half as much again under ∅152 mm spring. embrasure wall.
the embrasure width and as a rule is installed
on high or vertical lift. In this case the springs
152 mm and 95 mm in internal diameter are
used.

Fix the torsion gear on the shaft using Drill the marked holes. Fix the brackets with
squeezing screws. Install the multi-purpose dowels and tapping screws and nuts. Fasten
internal bracket for 95 mm plug fastening and the ∅95 mm plug to the support bracket with
mark the points for its fastening. bolts М10х45 and nuts, ∅152 mm plug must
be fixed with 3/8''х11/2' bolt.

installation of garage and industrial sectional doors 49


9 SUPPLEMENT

Installation of the spring failure safety device

This device is used for the shield fall protection Fasten the spring failure safety device to the Fasten the catch housing to the door panel
by the spring failure. Place the bracket against embrasure wall using tapping screws and using 4 tapping screws.
the embrasure wall and mark the position of washers.
its fastening to the wall.

Fasten the spring flange to the catch lever Load the spring by the necessary amount
using two bolts and nuts. of turns and pull out the stop peg, having
released in that way the spring-loaded catch.

50 installation of garage and industrial sectional doors


SUPPLEMENT 9

Cable safety device

During installing the corner brackets with the Before installation of the safety device plates Install the plates on the holes of the corner
cable safety device fasten the plates for safety mark and drill additional holes, using the bracket and fix them simultaneously with the
device on the corner supports. plates as a templet. support to the embrasure wall using tapping
screws and washers.

45mm

The plates must be installed with perforation The cable safety device is installed on the door leaf like the bottom corner bracket with
(on the lugs) upward. cable fine tuning (with wedge-operated cable fastening). During installation of the corner
bracket with the cable safety device put the cable in the wedge-shaped pocket on the bracket
according to the figure. Run the cable through the clamp on the bracket hook, put the wedge
in the cable hinge, draw the cable and the wedge in the wedge-shaped pocket.

installation of garage and industrial sectional doors 51


9 SUPPLEMENT

Cable break safety device

While using the corner bracket with the cable Before start of work take out cable break
break safety device mark and drill 6 holes 4.2 safety device peg.
mm for bracket fastening. Fix it with 6 tapping
screws 6.3x38 mm.

52 installation of garage and industrial sectional doors


SUPPLEMENT 9

Installation of the bottom corner bracket for drum behind

Put the bottom corner bracket for drum behind on the bottom panel, mark and drill holes ∅4.2 mm for bracket fastening.
Fix the bracket using tapping screws.

Installation of the bottom corner bracket with the cable tension device.

Install the bottom corner bracket with the Run the cable through the oval disc and fix it
cable tension device using 6 tapping screws. on the hook.

installation of garage and industrial sectional doors 53


9 SUPPLEMENT

Installation of connection coupler for octagonal shaft

If you are going to install the shaft consisting Assemble from the coupler connector plates and Position the connection coupler on two parts
of two parts use connection coupler. bolts the coupler. of the shaft and fix it on operational openings
using tapping screws for metal 6.3x25 for
octagonal shaft.
Installation of non-adjustable coupler for cylindrical shaft

The coupler is installed in a similar manner as the adjustable coupler is.

54 installation of garage and industrial sectional doors


SUPPLEMENT 9

Installation of cylindrical 31.75 mm in diameter shaft

In case of installation of 31.75 mm shaft


instead of the regular end support and multi-
purpose internal brackets the brackets with
adjustable bearing are used. The brackets have
additional openings for fastening to the wall
and to the corner support.

Fix the end support bracket to the embrasure Install the drums, spring and the bearing of Fasten the multi-purpose internal bracket to
wall using 4 tapping screws and washers and the multi-purpose support bracket on the the embrasure wall, mark and drill holes ∅12
dowels. Depending on the type of the drum shaft. Insert the shaft in the bearing of the mm in the embrasure wall. Insert dowels and
position and fix the adjustable bearing on the support brackets. fix the bracket with four tapping screws and
holes in the bracket. Fix in the same way the washers. Fix the adjustable bearing on the
second support bracket. internal bracket using bolted joints М10х45
mm. Fasten the spring flange to the internal
bracket.

installation of garage and industrial sectional doors 55


9 SUPPLEMENT

Manual chain operator installation


The manual chain operator can be installed on the left or on the right sides of the door.

5-10 mm

Put the shaft on the closing ring. Install on the shaft the manual chain operator, Put on the second closing ring.
having inserted the bushing key in the key
slot before.

Fix the closing rings on the shaft using bolts Position the manual chain operator fastening Drill the marked holes ∅12 mm.
М8х25 mm (the bolts must set again the bracket close to the embrasure wall and
bushing key) the operator. Mark the holes for the bracket
fastening to the wall.

56 installation of garage and industrial sectional doors


SUPPLEMENT 9

Insert a dowel and fix the manual chain Install the tension roller with the chain holder Insert dowel in the drilled holes and fasten the
operator fastening bracket to the wall using at 1 m height and on the same axis with the tension roller using tapping screws.
tapping screws and to the operator with operator. Mark and drill the holes in the wall
washers and nuts. for the tension roller fastening.

Run the chain through the operator and the tension roller. Fasten the chain links using combination
pliers.

installation of garage and industrial sectional doors 57


9 SUPPLEMENT

If the tension roller is used

Place the tension roller on the floor on the same axis with the operator. Mark and drill the holes Insert the anchor bolts in the drilled holes and
in the floor for the tension roller fastening. tighten them.

Run the chain through the operator and the tension roller. Fasten the chain links using combination
pliers.

58 installation of garage and industrial sectional doors


SUPPLEMENT 9

Wicket door closer installation

If the door leaf has a wicket, the wicket door closer must be installed.

Position the door closer on 4 ready-made holes.

Remove top wicket modifier profile cap from one of the profile ends.

installation of garage and industrial sectional doors 59


9 SUPPLEMENT

Install the closer lever in the sliding trunk of the door leaf.

Block the closer lever on the closer Place the cap back on the profile end and fix
mechanism. it with a tapping screw.

60 installation of garage and industrial sectional doors


SUPPLEMENT 9

Omega-profile installation

The Omega-profile is installed on the The Omega-profile is recommended to be installed at one level with the side supports and to
embrasure with a 4500 mm wide shield and be fastened to the panel using rivets or tapping screws (on the inside of the panels).
if there is increased wind load. The profile
is used for the shield reinforcement in both
vertical and horizontal positions.

Installation of double side supports

The roller's double (reinforced) Disassemble the side supports


side supports are used if the with roller holder. Position the
door leaf has large dimensions supports on the drilled holes
and the load per roller exceeds and fix with tapping screws
35 kg. for panels.

installation of garage and industrial sectional doors 61


9 SUPPLEMENT

Installation of halyard capronic


The halyard capronic is used to close the door by hand if there is a high embrasure.

One end of the halyard capronic fasten to the Fasten the second halyard end to any free hole
roller bushing on the bottom corner bracket. of the corner support or of the end support
bracket.

62 installation of garage and industrial sectional doors


SUPPLEMENT 9

Aspects of vertical and high lift installation

High lift High lift with remote shaft Vertical lift

High lift, two-shaft system High lift, with remote shaft, two-shaft system Vertical lift with remote shaft

installation of garage and industrial sectional doors 63


9 SUPPLEMENT

Two-shaft system on end support brackets

Position the support bracket close to the wall Drill the marked holes (in the wall the hole Insert the dowels in the holes in the wall. In a
and the corner support, matching the holes is ∅12 mm and in the C-profile the hole is similar manner mark the holes for the bracket
in the bracket and in the support. Mark the ∅8.5 mm). fastening on other side of the embrasure.
holes for fastening to the C-profile and the
embrasure wall according o the perforation in
the support bracket.

Install symmetrically on the inside the second Drill the marked ∅12 mm holes in the wall, Insert the shaft with spring in the brackets
support bracket, for that position it to the insert dowels and fix the bracket using tapping bearing and install the drums. Fasten the
embrasure wall and mark the points of its fas- screws. Fix the support bracket on other side right and left brackets to the wall using
tening to the wall. The distance between the of the embrasure in a similar manner. tapping screws and washers and to the corner
brackets must be enough to place the drum. brackets and the C-profiles using bolts and
nuts.

64 installation of garage and industrial sectional doors


SUPPLEMENT 9

А
А

Install the sprocket on the shaft, having Position the support bracket close to the wall Install the second shaft with a spring in the
inserted the bushing key in the key slot so, that vertically it is in one line with the top support brackets bearings.
before. Fix the sprocket on the shaft using bottom bracket, fastened to the corner support
fastening bolts М8х25 mm. Fasten the and to the wall. The center-to-center distance
sprocket on other side of the shaft in a similar between the shafts (A) can vary from 240 up
manner . to 393 mm depending on the lintel height.
Install the top support bracket according to
these dimensions. The dimension is indicated
in the mounting card. In a similar manner
fasten the support bracket for the second
shaft on other side of the embrasure.

installation of garage and industrial sectional doors 65


9 SUPPLEMENT

Place on the second shaft the sprocket so, Install the additional support bracket on the bottom shaft, for that position it to the embrasure
that it has been in one line with the bottom wall, mark and drill the holes for fastening.
sprocket. Before put on them the chain. If the
center-to-center distance between the shaft
(A) is less than 393 mm, shorten the chain.
Bolt the top sprocket on the shaft. In a similar
manner install the sprocket and the chain on
other side of the embrasure.
Table 1
n
108 106 104 102 100 98 96 94 92 90 88 86 84
pieces
By using of the connection coupler the support
А brackets must be installed on both sides from
392,5 380 367,5 355 342 329,5 317 304 291,5 278,5 266 253,5 240,5
мм the couplers.
n – amount of chain links including the connection link
(basic amount -108, minimum - 84)
А- center-to-center distance

66 installation of garage and industrial sectional doors


SUPPLEMENT 9

Two-shaft system on U-shaped end support brackets

Position the sprockets on the top and bottom shafts so, that they are in one line. put on them Fix the sprockets using fastening bolts.
the chains before. If the center-to-center distance between the shafts (A) is less than 393 mm
shorten the chain according to the table. Install the sprockets on other side of the embrasure
in a similar manner.

Install the connection chain on the sprockets.


Shorten the chain according to the table in the
mounting card depending on the center-to-
center distance of the shafts position.

installation of garage and industrial sectional doors 67


9 SUPPLEMENT

Chain tension device installation

Chain tension device is used to tension the Install the device on the top shaft close to the Position the sprocket together with the
chain during its stretching and damping of the end support bracket before installation of the chain close to the chain tension device.
vibrations, arising during its operation. sprocket and the chain.

Position the tension device rollers on the If the end support bracket is far from the Install the tension device on the top shaft.
outside of the chain. sprocket the closing ring can be installed. Fix the chain tension device position with
the closing ring.

68 installation of garage and industrial sectional doors


SUPPLEMENT 9

To make easier the industrial sectional door torsion gear mounting we recommend to use the
hand hoist and the mounting jig with lifting capacity ~ 500 kg.

hand hoist mounting jig

installation of garage and industrial sectional doors 69


9 SUPPLEMENT
Mounting of torsion gear with remote octagonal shaft

Lean the low shaft remote bracket to the Drill in the wall according to the marking 10 holes ∅12 mm and in the corner support 8 holes
embrasure wall close to the corner bracket ∅7 mm.
(on the outside) according to the mounting
card. Using the perforation in the bracket make
marking for its fastening to the wall.

Fasten on the brackets the mounting jig using 5 The second bracket position on the slots of the Fasten the hand hoist hanger hook to the special
bolts М10х25. installed bracket, fasten the bracket to the wall opening on the mounting jig.
using dowels and tapping screws.

70 installation of garage and industrial sectional doors


SUPPLEMENT 9

Hook the shaft near the drums, hitching them Using the manual chain lift the torsion gear up to the remote brackets.
with the hand hoist load hook, before it loose
six-sided screws 8X16 on the torsion gear end
bushing for shaft 1.25” so, that the bushing is
able to move along the shaft.

installation of garage and industrial sectional doors 71


9 SUPPLEMENT

Install the torsion gear in the remote brackets Block the spring failure safety device. Tighten
slots positioning the end bushings. the screws on the end bushings.

Install the end bushing fixing plate.

72 installation of garage and industrial sectional doors


SUPPLEMENT 9

Aspects of two-shaft system of torsion gear with remote octagonal shaft mounting

Place the remote brackets for low shaft to the Place the remote bracket for the second To make mounting easier install first the
embrasure wall close to the corner bracket (on shaft tightly to the wall so, that top and additional torsion gear (without drums) in
the outside) according to the mounting card. bottom bracket slots index. the top remote bracket.
fasten them to the wall.

Install the second shaft in assembly (with Install the chain on the sprockets of both Position the chain tension device on the
drums). shafts. Attention! The sprocket must be on top shaft and fix it with the closing ring.
the same axis.

installation of garage and industrial sectional doors 73


9 SUPPLEMENT

Mounting of the torsion gear with cylindrical shaft

Disassemble the remote shaft bracket with Lean the remote bracket for the low shaft to the embrasure wall close to the corner support
a cramp (on the outside) according to the mounting card. Using perforation in the bracket make
marking for its fastening to the wall and the corner bracket.

Drill according to the marking 10 holes ∅12 Fasten the bracket to the wall using dowels and tapping screws and to the corner support
mm in the embrasure wall and 8 holes ∅7 using bolted joints. Install the second bracket on other side of the embrasure in a similar
mm in the corner support. manner.

74 installation of garage and industrial sectional doors


SUPPLEMENT 9

Fasten the pipe to the bracket using cramps Install the internal remote brackets for Insert the shaft with a spring in the brackets
and nuts according to the mounting card. drum fastening on the pipe according to the bearing and install the drums.
dimensions indicated in the mounting card
and fix them using tapping screws for metal.

Cable support installation

While mounting sectional doors with high The cable support fasten to the side support
/ vertical lift, with drum below the cable using 2 bolts with semi-round head and two
supports must be installed on the bottom suitable nuts. The cable must be extended
panel side supports in order to prevent fraying behind the special ear on the cable support.
of the cable through the side support.

installation of garage and industrial sectional doors 75


9 SUPPLEMENT

Installation of end support brackets at vertical lift

Position the end support bracket along Drill the marked holes ∅12 mm. Hammer in
the holes on the corner support and using dowels in the wall. Fasten the end support
perforation in the bracket mark the holes for bracket and the corner support between each
fastening to the embrasure wall. other using bolts М8х25 and nuts.

Fasten the end support bracket to the wall Insert the shaft in assembly with spring and
using dowels and tapping screws. drums in the support brackets.

76 installation of garage and industrial sectional doors


SUPPLEMENT 9

Installation of bumper at high lift

At vertical lift the bumper is installed on the Fasten the bumper to the C-profile on the vertical track according to the figure. Install the bumper
vertical tracks. so, that when the door is open the bumper's compressed position is not less than 50 % its stroke
length. Install the bumper on the second track in a similar manner.
Aspects of low lift mounting

Low lift the drum from the front Low lift the drum from behind.

installation of garage and industrial sectional doors 77


9 SUPPLEMENT

Installation of the top roller support

By assembling of the top panel install the Position the support roller on the top
top roller supports. Level the corner support horizontal track. Loose the tapping
edges according to the panel, drill four holes screws, adjust the upper supports
∅4.2 mm and fix it using tapping screws for to enable close abutment of the top
door panels. panel to the lintel. Tighten the tapping
screws.
Horizontal tracks installation

The horizontal tracks are delivered in Fasten the horizontal and vertical tracks Before bolt tightening the tracks must be
assembly. They are punched to enable their to each other using two bolts for tracks leveled using the builder's level.
fastening to the vertical tracks. assembling and the connection plate located
in the position of tracks joint.

78 installation of garage and industrial sectional doors


SUPPLEMENT 9

Installation of end support bracket at low lift

Install the support bracket close to the wall Mark and drill the holes ∅12 mm for fastening Fasten the bracket to the wall using dowels
and the corner bracket, here the holes in to the embrasure wall using the perforation in and tapping screws and washers and to the
the support bracket, the corner support and the support bracket. bracket of pulley fastening and to the corner
the bracket for bushing fastening must be support using bolts and nuts.
indexed.
C-profile installation

Fix two lock plates on the corner connection Attach the C-profile, leveling its end along the
bracket using bolts 8Х25 mm with semi- double track rear surface, run it through the
rounded heads and nuts. lock plates and holes in the corner connection
bracket, tighten it.

installation of garage and industrial sectional doors 79


9 SUPPLEMENT

Fastening of horizontal tracks to the ceiling


There are two types of brackets applied for tracks fastening to the ceiling depending on the lintel height.

A. If the lintel height is up to 400 mm the tracks Fasten the corner bracket to В. If the lintel height is more than 400 mm the tracks
are fastened using 4 corner brackets, cramps and the ceiling with tapping screws are fastened using multi-purpose corner brackets,
bolts and nuts. Fasten the multi-purpose bracket to (2 pieces) and dowels. punched angle, punched angle connectors and double
the double tracks using the cramp and the bolt and tracks and bolts and nuts.
the nut.

A
B

Fastening of the punched angle to the Fix the multi-purpose corner Check tracks horizontality using the builder's level (adjust if
door tracks with low lift is made with bracket to the punched angle using required). Before final fastening of the tracks to the ceiling
the punched angle connector using the bolts with semi-round head and you must check the distance between alternate angles
cramp, bolts and nuts. flanged nuts. (diagonal A and B must be equal).

80 installation of garage and industrial sectional doors


SUPPLEMENT 9

Installation of bumpers

Mark and drill 2 holes ∅8 mm in the bottom Fix the C-profile using bolts with semi-round head М8х25 and flanged nuts.
horizontal tracks.

Fasten the spring bumper using lock plates


and bolts and nuts. Adjust the bumper's
position and tighten the nuts.

installation of garage and industrial sectional doors 81


9 SUPPLEMENT

Low lift, drum from behind, pulley installation

Place the pulley along the holes in the corner Mark and drill a ∅8 mm hole in the lintel wall.
bracket and fix it with 4 bolts with semi-rounded
head М8X16.

Insert dowels and fasten the end bracket to the


wall using tapping screws and washers.

82 installation of garage and industrial sectional doors


SUPPLEMENT 9

Low lift, drum from behind, mounting of torsion gear with octagonal shaft

Place on both horizontal tracks the connected Fix the multi-purpose brackets on the end Fasten the multi-purpose bracket to the
construction of the end support bracket for drum support bracket for drum from behind and on ceiling using 2 tapping screws.
behind and safety device fastening bracket for the safety device fastening bracket for drum
drum behind fastening. Fasten the assembled from behind using bolts and nuts.
bracket to the double horizontal tracks using
bolts 8X16 with semi-round head and tighten
them with nuts.

installation of garage and industrial sectional doors 83


9 SUPPLEMENT

Position the torsion gear in assembly on the Fasten the end plate with bearing to the end support bracket for drum from behind using 2 bolts
U-shaped brackets. using 2 bolts with semi- with semi-rounded head (M8X16), fix the bolts on the close to the lintel or far from the lintel slots
rounded head (M8X16) fasten the end plate (relatively the embrasure) depending on the installed drums.
with the bearing to the end support U-shaped
bracket. Fasten the spring failure safety device
to the end support U-shaped bracket using
two sets of fasts (bolt 10X25, nut M10, spring
washer 10).

Relation between end plate with bearing installation and installed end support U-shaped brackets (8)
and drum type is represented in the table.
End support bracket CLOSE OMI8 OMI12 Fasten the spring failure safety device to the end
for drum behind support U-shaped bracket using 2 set of fasts
FAR OMI18 L (bolt 10X25, nut M10, spring washer 10).

84 installation of garage and industrial sectional doors


SUPPLEMENT 9

Low lift, drum from behind, mounting of torsion gear with cylindrical shaft

Place the end support bracket against the Drill the marked holes ∅8.5 mm. Fasten the end support bracket to the double
horizontal tracks on the outside. Mark the horizontal tracks using bolts and nuts.
holes in the tracks for bracket fastening using
perforation in it.

Position and fix the cable guiding roller for drum behind together with the mounting angle
for horizontal lath on the end support bracket using a bolt and a nut. Position and fasten the
C-profile using mounting angles, lock plates and bolts with semi-rounded head М8х25 and
suitable nuts.

installation of garage and industrial sectional doors 85


9 SUPPLEMENT

Install the shaft in the end support brackets Fasten the fastening bracket for drum behind to the C-profile using the C-profile fastening bracket,
bearing, having installed the drums, the spring the mounting angle for horizontal lath installation, the lock plate and a bolt and a nut.
and the fastening bracket for drum behind on
it before.

Fix the spring to the fastening bracket for drum Fasten the assembly to the ceiling using brackets
behind using 2 bolts and nuts. (the bracket type depend on the lintel height).

86 installation of garage and industrial sectional doors


SUPPLEMENT 9

Dismounting through the lubrication hole in the central


Unplug the electric drive. Dismount the part of the hinge curl or in the central part of
electric drive according to the directions the roller holder curl.
for electric drive. Close the door and loose If closing or opening of the doors
the spring. Then dismounting must be requires force applying, adjust the rollers.
performed in accordance with this directions If there is a clearance between the roller and
in the reverse order. the track profile, loose the bolts on the roller
holder, move the roller holder along the slots
Upgrading until the roller fits tightly to the track, tighten
Installation of the additional equipment the loosed bolts on the roller holders.
or accessories as well as self-replacement If there are creaks and knocks in the
or self-adjustment of the components torsion gears clean them from dust and dirt
without consulting with the manufacturer is with a dry rag and streak any lubricant for
forbidden. metal surfaces on the about 3 cm wide area
Only original spare parts and accessories along the spring
are recommended to be applied for installation For manual opening and closing of the
and operation of the sectional doors. door the handle is used.
The manufacturing company shall not If the automatic drive is used follow the
be held responsible for possible injuries and directions for the drive.
wrong done to people, animals or objects in Do keep the tracks clean. Do not apply
case of unauthorized modification. lubricants for them!
After about 20000 times of door
Maintenance operation acts an expert should test the
The sectional doors do not need any spring mechanisms.
complicated or special maintenance. Test is carried out by the doors operation
Panels that make up the door shield, have intensity:
the resistant protective-decorative coating. ·up to 5 times a day – every 9 years;
To keep them nice and tidy we recommend ·up to 10 times a day – every 4.5 years;
to clean their surface using a moist rag and ·up to 20 times a day – every 2.5 years;
neutral domestic detergents. ·up to 50 times a day – every year.
In case of door hinge creaking or roller The doors should be installed, adjusted or
axes creaking they should be lubricated repaired only by qualified specialists.

installation of garage and industrial sectional doors 87


10 NOTES

88 installation of garage and industrial sectional doors


NOTES 10

installation of garage and industrial sectional doors 89


10 NOTES

90 installation of garage and industrial sectional doors


NOTES 10

installation of garage and industrial sectional doors 91


ООО «ДорХан»
Россия, 121354, г. Москва, Можайское ш., стр. 36
Тел. (+7 495) 933 24 33
Факс (+7 495) 937 95 50
E-mail: [email protected]
www.doorhan.ru