PROJECT NAME : Improvement Emergency Access Installation at Wayang Windu REPORT NO : BST/EAI-WW/I-033
LOCATION : Power Station Control Room DAY / DATE
CONTRACT NO : 4200003155 PREPARED BY : Nadia Nur Islami
CLIENT : Star Energy Geothermal Wayang Windu Limited SUBMITTED TO : SEGD Representative
CONTRACTOR : PT. Bagus Sarana Teknik
1. Weather Condition :
Time 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 C : Clear TR : Tiny Rain
C C C C C C C C C C CL : Cloudy HR : Heavy Rain
2. Construction Highlights :
A. This Day Construction: B. List of next day contruction priority:
1 Fabrication Railing 1 Continue Fabrication Railing
2 2
3 3
4 4
5 5
4. HSE Performance: (Describe HSE activities summary performed by Contractor)
Activities Total Activities Total
1 Toolbox meeting 1 4
2 5