Update Prem Resume (1) - 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Prem Prakash

Field Operator –Hindustan Urvarak &


Rasayan Limited
Mobile Number +919045302910
+917983827367
Email: [email protected]
PASSPORT NUMBER – S 6772662

Career Objective:-
In pursuit of the dynamic, challenging and rewarding career in Chemical, Petro - chemical, &
Petroleum industry, i am seeking a lucrative position in a reputed organization where my
knowledge shall be skills utilized to the optimum to bring profit to the organization & helpful
forSociety and an environment to develop new skills to ensure my continuous progress to
words higher positives.

Work Experience:-
 Total Worked Experience + 10 years
 Now working in Ammonia Plant HURL under Aarvi Encon LTD, Barauni
Bihar (29 March to Till Now)
 1 Year Work Experience in Ammonia Plant RFCL under
Aarvi Encon LTD, Ramagundam, India.(09 August to 15
march 2023)
 2.6 Years Work Experience Coal to Liquids (CTL) Plant
EIL under Aarvi Encon LTD,Gurugram, India. (3 sept. 2018
to 29 july 2022)
 01 Years Works Experience Desalter Project BPCL Kochi Refinery
under O&G Skills India Pvt Ltd,kochi India
 2.6 Years of workexperience Gas Cracker Unit of GAIL
under Global S.SConstruction Pvt Ltd Pata, India. (10 march
2016 to 31Aug 2018)
 2.3 years of work experience in CAP & Nitrogen
plant Unit of GAIL under Global S.S.Construction
Pvt LTD, Pata, India(20 Dec. 2013 to 10
March2016)

Hundustan Uravark Rasayan Limited:-

I joined Hundustan Uravark Rasayan Limited in Ammonia Unit Barauni


Bihar from (29 March 2023 To Till Now) under Aarvi Encon Limited.

Role: Field Operator-Ammonia plant (2200MTPD licensed by HTAS-Denmark)

 To handle all sections in ammonia unit – Primary Reformer, Secondary Reformer,


Compressor (PAC, SYN Gas, ARC Compressor Unit ) , Carbon-di-oxide removal ,
Methanation, Desulphurization, Carbon-mono-oxide shift conversion, Cryogenic
Purification etc…
 To handle all equipment in ammonia unit- Stream Turbine, Compressor, Pumps, Lube
oil circulation System, Deaeroter, Stripper, Filter, FD & ID Fan, Heat Exchangers,
Gas Turbine, Knock Out Drum, Ammonia Converter , Separator, Reactor, Vessel,
Reboiler.
 To handle Emergency Shut-down by failure of Utilities, Electricity…… etc.

Ramagundam fertilizers and chemicals Limited:-


AS Field Operator in Ammonia Plant associated with M/S. RAMAGUNDAMFERTILIZERS AND
CHEMICALS LTD., Ramagudam, Telangana.
Role: Field Operator-Ammonia plant (2200MTPD licensed by HTAS-Denmark)
 Logging all Tube skin Temperatures in the Reformer and Checking for any
otherHotspots in Reformer Furnace
 Optimization of vent and trap losses 
 Optimization of radiation losses in reformer furnace.

 Start-up and operation of Primary Reformer, Secondary reformer, HTER,


Fuel Gasexpander
 Start-up and shutdown of Syngas compressor, Ammonia Refrigeration compressor
and processair compressor.
 Start-up, operation & troubleshooting of a MDEA system
 Trouble Shooting all the problems and reporting to Immediate Supervisors.
Engineers India LTD :-
I joined Engineers India limited 3rd. September 2018 to 30 March 2021Gurugram.Under O&G
Skills India PVT & rejoined joined Engineers India limited 30 April 2021 to 29 July 2022
Gurugram. Under Aarvi Encon Limited
Coal to Liquids (CTL) Plant:-
Air Separation unit (ASU),Coal handling plant (CHP), Gasifies plant, Electrical boiler system,
Electrical super-heater system, Syngas cleaning system, Thermic fluid heater system & Ground
Flare system.
Demineralized water plant: Operation experience
Cold flow fluidization in 2D Setup: Testing experience
I involve in this project 15 Jan 2019 to 20 Dec2019 Prototype desalter system in CDU-3, BPCL
Kochi Refinery. Commissioning & Pre-commissioning activities
 Hydro Testing.
 Line Flushing and Cleaning - it may be water Flushing, Air Blowing or Card Board
Blasting.
 Leak test (Either by air or by nitrogen
 Steam Blowing
 Cooling water passivation
 Operation in HMI (Computer device) with SCADA
 Before commissioning other activities like checking of plant for completion as per P&ID
preparation of punch list, stroke checking of control valves, External & Internal inspection
of vessel & column etc. also has to be carried out.
Operation experience to establish the best performance of the newly developed
Desalter technologies & to study the effects of various operation parameters
 Sampling of Crude & Brine samples
 Manual operations (as & when required)
 Experience in working in shifts.
 Assistance during Maintenance works
 Operation experience like Sampling in tedlar bags & boom.
Gas Cracker Unit Gail Pata:-
 2.6 Years works experience in Gas Cracker unit (GCU) at Gail Pata under Global
S.S. construction Pvt Ltd.
 Responsible for smooth & safe field operations, troubleshooting, start-up & shutdowns,
emergency shutdown, & safe handling of all associated process of Ethane / Propane Cracker
unit with normal operation
 Hands on experience in start-up and shutdown, Cracking & Decoking of Twin Cell Furnaces.
 Check the healthiness of Burners in Furnace, TMT measurement etc.
 Hand on experience of Quench water System, Feed Saturator, Dilution Steam Generator,
LP Water Stripper and also Quality Monitoring of QW, BFW System in BFW Tank and
Steam Drum of Furnaces.
 Monitoring Of CO at Furnace outlet by DMDS Adjustment & PH maintaining in Steam
Drumby Phosphate Adjustment.
 DMDS and Phosphate Unloading.
 Handling of Caustic Tower & Caustic Circulation pump . ( To remove H2S and CO2 going
tocold Section )
 Handling and supervising all maintenance jobs for all equipment (Furnaces , Centrifugal
Compressor , Centrifugal pumps , Stem & motor Driven , Reciprocating pump Heat
Exchangers – Double Pipe , Shell & Tube , Vessels etc. )
 Handling and supervising maintenance jobs for all Instruments (TTs , PTs , LTs ,
ControlValves , ON/OFF Valves, and Safety Valves Calibrations )
 I am working operational Assistant (handing the shift.)
 Maintain air resister as per instruction of panel.
 Process parameter maintaining & continuous monitoring through field and recording
theimportant parameter readings.
Pre- Commissioning & Commissioning Activities in GCU – 2
 Before commissioning other activities like checking of plant for completion as per P&ID preparation
of punch list , stroke checking of control valves , External & Internal inspection ofvessel & column
etc. also has to be carried out
 Line Flushing and Cleaning - it may be water Flushing, Air Blowing or Card Board Blasting.
 Hydro testing, chemical Cleaning, Cooling water passivation , chemical cleaning of compressor
suction lines , Lube oil flushing of Compressors lube oil circuit. Steam blowing etc.
 Solo run and coupled run of pump & steam turbine.
Commissioning Activities:-
 Charging of all process line & utilities.
 Start-up and shutdown of pumps and Compressors.
All instrumentation Commissioning (Transmitters, Control Valve Stroke checking, etc.
CAP & NITROGEN Plant Gail Pata:-
 2.3 Years works experience in nitrogen and compressed Air plant. At Gail Pata under
GlobalS.S.construction Pvt Ltd.
 I am working operational Assistant (handing the shift)
 Handling operations of various types of centrifugal & reciprocating pump, expender
turbine, adsorption unit, liquid nitrogen pump, refrigeration system, child water pump,
instrument airdryer, PSV & TSV and pump change over etc.
 Recording for the important parameter readings.
 Maintaining process parameter & continuous monitoring through field.
Handled planned shutdown, emergency shutdown and subsequent start-up activities
 Nitrogen PC-2 commissioning activities involve in hydro testing, card board blasting PDP
airflushing , water flushing ,lube oil flushing & different type steam blowing and leak testing
etc.
Academic Record:-

Qualifying
Institute/University Board/University Year CGPA/Percent
Degree/Examin
age
ation

B.Sc. (Bachelor of SRIC.B.S.M.S.S. C S J M UNIVERSITY 2010 50.8%


Science) JHINJHAK KANPUR

Higher VTA INTER COLLEGE


UP BOARD 2005 57.9%
Secondary DIBIYAPUR AURAIYA
ALLAHABAD
Examination (12TH
Std.)

Secondary SPICSEENGPURWA MANA


UP BOARD 2003 43.9%
Examination(10TH SAHARA AURAIYA
ALLAHABAD
Std.)

Personal Information:-
 Name Prem Prakash
 Father’s Name Shri Satya Prakash
 Passport Number S6772662
 Date of Issue 03/10/2018
 Date of Expiry 02/10/2028
 Place of Issue Lucknow
 Sex Male,
 Nationality Indian
 Interests Music, Bike riding
 Date of Birth 10th Nov, 1990
 Languages Known Hindi and English
 Permanent Address Village: Gapkapur ki madaiyan
Post: Dibiyapur, District: Auraiya
Uttar Pradesh, India (206244)

DECLARATION :-
I hereby declare that all the information given above is true to the best
of my knowledge and I wouldstrive hard to satisfy the expectations of the
organizationfrom my part.

Your Truly
Prem Prakash

Date………………

Place………………..

You might also like