EGME 3.19 Business Process Dcoument 22-12

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Process # Business Process Title Revision #: 22-12

3.19 Power Plant Monitoring Date: 05-04-2023

Aircraft Maintenance & Engineering System

Business Process Document

03.19 Power Plant Monitoring


Process # Business Process Title Revision #: 22-12
3.19 Power Plant Monitoring Date: 05-04-2023

A. EGME Proposed Process Chart

B. Entity
EGME Entity

C. Departments Roles
# Department Role
1 MCC Records Powerplant alerts and reports Powerplant relevant events such as
IFSD’s.
2 Engineering technical services Tracks the Powerplant status, provides data to the OEMs and recommends
corrective actions to improve performances
3 Maintenance Trend update, component rem/install.

D. Issue Log
Number Priority Assigned Description Action

1|Page
Process # Business Process Title Revision #: 22-12
3.19 Power Plant Monitoring Date: 05-04-2023

E. Basic Data Entered


APN # 746; Powerplant Event administration
Data field name in
Data field title
# Description Xfile Xfile # Notes
(on APN screen)
(if applicable)

BasicData-Table storing removal-codes used


by PPEvent-Administration-Module. To determined by engine
Power plant removal
1 The removal-types should be something N/A N/A engineering technical
types
like: BIRDSTRIKE, REPAIR, OVERHAUL, FOD, services
LOAN REMOVAL...
2

F. Activated Parameters
Parameter # Description: Float: Integer: String: Remarks:
N/A N/A N/A N/A N/A N/A

G. Scheduler Tasks
Task Status Frequency Parameter
N/A N/A N/A N/A

H. Active Workflow
Workflow ID # Workflow Name Rules Remarks
N/A N/A N/A

I. Interface
Type Configuration or Name Description Remarks
N/A N/A N/A N/A

J. Users Authorization
APN#:746
Role Code Access License
# Name Department Role Description Remark
(Users Group) (Read/Write) (Yes/No)
track happenings PP Events,
for example ground start
Engineering Engineering failure on engines and APUs.
1.
ETS technical technical It also offers the possibility Write yes
services services to track the accumulated
costs related to these power
plant events
2.
2
3.

2|Page
Process # Business Process Title Revision #: 22-12
3.19 Power Plant Monitoring Date: 05-04-2023

L. Notes and Information


N/A

M. Workshop Questions
# Questions Answers
Q1
Q2

N. Labels, Forms & Reports


Available in AMOS:
AMOS Reports EGME Manuals/LPM
APN Need Corresponding
Name Layout Name
# Changes Label/Form/Report #
ETOPS reliability report

Not Available in AMOS:


EGME Manuals/LPM Category
Label/ Notes
Nice to Not
Form/Report Name Essential Required
Have Need
#

3|Page
Process # Business Process Title Revision #: 22-12
3.19 Power Plant Monitoring Date: 05-04-2023

Solution Definition Stream


PM Director
Prepared by: Checked (Tested) by: MGR
Approval
Sign-off
Shehab mohsen

Date: 05-04-2023 Date: Date:

Approval of Change Committee

4|Page

You might also like