90% of Section 2B - The Quotation Form-Service ALL JAVA
90% of Section 2B - The Quotation Form-Service ALL JAVA
Feeder Permit
b SM20131020001-ID Consist of but not limited to official and unofficial permit
(railways, highway, PU, village, ormas, etc)
Remarks : official letter should be released
Cluster Permit
c SM20131020002-ID
RT, RW, Developer
SM20111010043-ID
Patchcord SM G.657A2 SC/APC - SC/UPC - 10 m
SM20111010044-ID
Patchcord SM G.657A2 SC/APC - SC/UPC - 3 m
SM20111010045-ID
Patchcord SM G.657A2 SC/APC - SC/APC - 10 m
SM20111010046-ID
Patchcord SM G.657A2 SC/APC - SC/APC - 3 m
2.5
Pekerjaan Aktivasi, Integrasi, Testing & Commissioning
Testing & Commissioning (Testcomm / Uji Terima) :
a SM20111050003-ID Testcomm OTDR & OPM ODF - FDT
b SM20111050004-ID Testcomm OTDR & OPM FDT - FAT
c SM20111050002-ID Testcomm OTDR & OPM OLT - FAT
2.6 Documentation
a SM20111030001-ID Survey & Design (Asplan)
b SM20111030002-ID As Built Drawing A1 (1 set asli + 3 set copy + soft copy),
KMZ, BOQ
c SM20111030003-ID Foto Dokumentasi
Notes :
3. TOP :
- 20% DP with Advance payment bond, performance bond
- 40% CWC
- 30% RFS and CC (actual workload calculated trough CC)
- 10% FAC
5. Flow PO :
- Cleanlist shared by project - subcon need to do HP validation - HP approve - NTP (notice to proceed); Subcon nee
Survey n Design - DRM done - PO release - paralel waiting PO release do the Implementation
Splitter 1:4 PC FH -
Splitter 1:8 (Modular) PC FH -
305,550
Galv 1 pipa, bentang 6-12 m(jembatan) M
611,100
Galv 2 pipa, bentang 6-12 m(jembatan) M
-
PU Permit M
-
RT/RW Permit M
-
Pemasangan Tiang 7 meter 4" PC
-
Pemasangan Tiang 9 meter 4" PC
-
Pemasangan Tiang 7 meter 3" PC
-
-
36,000
HELICAL DEAD END DIAMETER 15.7-17.0 MM PC
Clamp 8 (Clamp Gantung) PC
12 core capacity PC -
24 core capacity PC -
48 core capacity PC -
72 core capacity PC -
96 core capacity PC -
-
Patchcord SM G.657A2 SC/APC-SC/UPC-10m PC
-
Patchcord SM G.657A2 SC/APC-SC/UPC-3m PC
-
Patchcord SM G.657A2 SC/APC-SC/APC-10m PC
-
Patchcord SM G.657A2 SC/APC-SC/APC-3m PC
Testcomm OTDR & OPM ODF - FDT PC -
Testcomm OTDR & OPM FDT - FAT PC -
Testcomm OTDR & OPM OLT - ODF PC -
-
ABD Design Documentation PC
Photo Documentation PC -
90%
4,230,928
4,230,928
4,230,928
4,847,938
5,200,515
315,000
360,000
360,000
4,275,000
4,275,000
4,275,000
18,000
18,000
18,000
18,000
166,500
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
4,500
4,500
45,000
31,500
31,500
31,500
31,500
-
40,500
19,350
2,092,500
2,844,000
4,401,000
192,025
384,059
20,273
17,629
225,000
225,000
225,000
-
-
31,500
40,500
4,950
3,600
3,600
3,600
3,600
6,750
3,150
3,150
3,150
3,150
3,150
6,750
378,000
4,500
495,000
495,000
495,000
76,500
76,500
76,500
76,500
76,500
7,650
4,500
7,650
4,500
39,665
31,500
39,665
1,440
2,203,608
1,762,887
Item
j SM20111100001-ID Splicing
m SM20111090003-ID
Label FAT (include QR Code) - (material +service)
n SM20111090004-ID Label Pedestal (material +service)
SM20111060034-ID
Sub Duct / HDPE 40/34 warna Ungu, 3 Strip Putih
SM20111060035-ID Socket HDPE 40/34
m SM20111090043-ID
Cable Ladder Tray include hanger and accessories
n SM20111090044-ID Bobok dinding per titik
o SM20111090045-ID Bobok ceiling per titik
Feeder Permit
d SM20131070001-ID Consist of but not limited to official and unofficial
permit (railways, highway, PU, village, ormas, etc)
Remarks : official letter should be released
Cluster Permit
e SM20131070002-ID
RT, RW, Developer
2.5 Documentation
a SM20111080001-ID Survey & Design (Asplan)
Notes :
1. Delivery material from FH WH to EMR sites become subcontractor responsibility
2. Warehouse become subcontractor responsibility
3. PriceDP
- 20% is with
incluce mobilization
Advance team
payment , bedeng
bond, kerja, papan
performance bond kerja
- 40% CWC
-5.
4.30%
PriceRFS
Flow and
subject
PO : CC (actual
to VAT 11%workload calculated trough CC)
- Cleanlist shared by project - subcon need to do HP validation - HP approve - NTP (notice to proceed); Subcon
PO release
6. SOW - SurveyHP,
: Validation n Design - DRM
Permit, done
Survey and- design,
PO release - paralel waiting
Implementation, PO release do the Implementation
document
7. Donation can reimburse to Fiberhome using debit note
Subcon quotation
Subcontractors quote by selectin
discount rate
Unit Brand / Type
Discount rate
#N/A KM FH -
#N/A KM FH -
#N/A KM FH -
FH -
#N/A KM
FH -
#N/A KM
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
#N/A PC FH -
-
#N/A PC
#N/A PC -
-
#N/A PC
#N/A PC -
-
#N/A PC
#N/A PC -
#N/A M -
#N/A M
-
#N/A M
-
#N/A M
#N/A M -
#N/A M -
#N/A M -
#N/A M -
#N/A M -
#N/A M -
#N/A M -
-
#N/A M
#N/A PC -
-
#N/A M
#N/A PC -
16,200
#N/A M
32,418
#N/A M
#N/A M 36,000
#N/A M 58,500
#N/A M 76,500
#N/A M 103,500
#N/A M 10,800
#N/A M 17,100
#N/A M 40,500
#N/A M 67,500
#N/A M 3,600
#N/A M 5,400
#N/A M 7,200
#N/A M 9,900
#N/A M 11,700
#N/A M 27,000
#N/A M 49,500
#N/A M 4,500
#N/A M 4,500
#N/A PC 4,500
#N/A PC 1,800
22,500
#N/A PC
#N/A PC 12,600
#N/A PC 13,500
#N/A PC 10,800
#N/A PC 13,500
#N/A PC 10,800
#N/A PC 4,050
#N/A M 5,400
#N/A PC -
#N/A PC 3,746,134
#N/A PC -
#N/A PC 2,027,320
#N/A PC -
881,443
#N/A PC
#N/A PC -
305,550
#N/A M
611,100
#N/A M
106,380
#N/A M
219,150
#N/A M
-
#N/A M
27,711
#N/A M
811,800
#N/A PC
#N/A PC 641,790
#N/A PC 162,000
#N/A PC 175,500
-
#N/A M
#N/A PC 211,500
#N/A M 103,500
166,500
#N/A M
#N/A PC -
#N/A PC -
#N/A M
-
#N/A M
#N/A PC -
-
#N/A PC
-
#N/A PC
#N/A PC -
#N/A PC -
#N/A PC -
#N/A PC -
#N/A PC -
-
#N/A PC
-
#N/A PC
-
#N/A PC
-
#N/A PC
#N/A PC -
#N/A PC -
#N/A PC -
#N/A M -
-
#N/A PC
#N/A PC -
sponsibility
rove - NTP (notice to proceed); Subcon need to continue to do SND until DRM before
gcument
PO release do the Implementation
Subcon quotation
actors quote by selecting
ate
90%
3,780,000
3,780,000
3,780,000
4,230,928
4,671,650
315,000
360,000
360,000
4,275,000
4,275,000
4,275,000
18,000
18,000
18,000
18,000
166,500
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
4,500
4,500
202,500
45,000
31,500
31,500
31,500
31,500
39,665
162,545
24,240
169,627
37,800
45,000
49,500
54,000
121,500
247,500
247,501
1,410
2,250
1,410
2,250
1,289
1,688
3,150
3,150
4,050
5,850
3,150
3,150
4,050
5,850
2,250
2,250
3,150
3,600
3,600
5,400
6,300
2,250
2,250
3,150
1,800
11,700
5,850
6,750
3,600
5,850
5,850
2,250
2,250
2,520,928
1,980,000
1,502,861
630,000
339,355
180,000
31,500
192,025
384,059
30,606
36,725
1,746
63,999
576,102
566,161
31,500
40,500
990
40,500
27,900
36,000
54,000
49,500
20,273
17,629
495,000
495,000
495,000
76,500
76,500
76,500
76,500
76,500
7,650
4,500
7,650
4,500
39,665
39,665
31,500
1,440
2,203,609
1,762,887