Responsibilities of Guide
Responsibilities of Guide
4. In case the project group is absent for review meetings, the guide shall interact with the
students/parents and bring this to the notice of the Project Coordinator/HoD through official
means.
5. The project guides shall conduct the project reviews within the stipulated period and the review
marks to be sent to the Project Coordinator of the department at said times. PRC members shall
timely update the Project Proctor.
Attendance Requirement
1. Students are required to satisfy minimum attendance criteria as prescribed by VTU i.e. (85%). If
the student fails to meet the minimum attendance requirements, he/she shall not be permitted to
take up the project work viva voce (both internal and external).
2. Students who intend to do project work in the industry can go to the industry for 4 days only
from Monday to Thursday and remaining 2 days students shall attend classes.
3. Students carrying out project work in the college are required to work on project from Monday
to Thursday and remaining 2 days of the week, they shall attend classes.
1. The students are required to meet their Internal Guides to report their progress on project work.
2. Progress Report (PR) has to be maintained in the form of a diary by the project group and the
same has to be discussed with the Internal Guide regularly.
3. In case of industry project, during the course of project work, the Internal Guides will be in regular
contact with External Guides and will visit the industry at least twice during the project period.
4. For IA assessment the project groups must give a presentation, report and demonstration as per
the schedules.
5. The presentation session for each group will be for 30 minutes and every member of the team
needs to defend the work done.
6. The project team is required to submit hard copy of the final project report phase I in the
prescribed format to the guide. Hard copy and soft copy of final project report phase II to guide
and departmental library, one CD to the guide written with code.
`
Presentation and Demonstration
One of the most important skills which the project aims is to assess the student’s ability to
communicate their ideas and work effectively. As part of the assessment, they are required to
rendera Presentation and Demonstration of their Project work to the project committee.
⮚ The time allotted for presentation and demonstration is 1 hour.