0% found this document useful (0 votes)
56 views19 pages

Boq 182202

Uploaded by

Rajnish Anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views19 pages

Boq 182202

Uploaded by

Rajnish Anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 19

Validate Print Help Percentage BoQ

Tender Inviting Authority: General Manager (PJ-CGD) / M/s VCS QUALITY SERVICES PVT. LTD.

Name of Work: Zonal PE laying, Last Mile Connectivity (LMC) and Direct Marketing Agency (DMA) works in Saran GA authorized in State of Bihar

Tender No.: PLCGD/WORKS/ZONAL/23/13

NOTES:
a) Please enable macros before filling the rates to see the quoted figures in words.
b) The bidder has to download the SOR excel file along with tender documents and subsequent Addendum/Corrigendum/Clarifications, if any, issued at a later stage.
c) Bidder to note that there are ‘White’ cells in the SOR excel file, which should not be modified by the bidder.
d) The Bidders shall quote “Excess(+)/ At Par/ Less(-)” percentage in the BOQ1 . Evaluation will be carried out on the basis of rate quoted in BOQ1. This quoted “Excess(+)/ At Par/ Less(-)” percentage in the
BOQ1 shall be applicable on all the rates of BOQ2 , which is unit rate of each items (Bidder has to not quote in BOQ2 ).
e) The Bidder shall quote in percentage (limited to a maximum of 2 decimal places) “Excess(+)/ At Par/ Less(-)” on the rates indicated in the Schedule of Rates annexed to the "Part-II: Price Bid" of tender
documents. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off. The
“Percentage” quoted by the Bidder shall be applicable uniformly to all the rates of the items indicated in Schedule of Rates, BOQ2 .
f) Only "Bidder Name", " Excess(+)/ At Par/ Less(-)" , "Percentage" & are to be filled by the bidder in the designated "Sky Blue Cells".
Bidders to note that Estimated Item rates specified in column F of the BoQ is excluding GST and rate of GST has been selected as 18% in the BoQ. In case, if Bidder wants to modify the GST Rates, the same
can be done by selecting GST rates from dropdown menu of Cell No. AY13 (highlighted in sky blue cell) of the BoQ. Please note that the selected GST rate shall be applicable for entire items of BOQ1.
g) "Excess (+)" or “At Par” or "Less (-) can be selected from the dropdown menu by clicking on the cell. The landed cost inclusive of GST (As selected by bidder in the cell no. AY13) shall be arrived at cell no.
BA17 after factoring in the "Excess (+)" or “At Par” or "Less (-) selected by the bidder.
h) Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ worksheet.
i) Goods & Services tax (GST) shall be paid as quoted/selected by bidder in BoQ/Annexure-8, upon submission of Goods & services tax invoice.
j) Do not insert any additional sheet and any condition in BOQ sheet. Please do not temper the BOQ sheet.
l) The scope of work under the subject tender is of indivisible nature and shall be awarded to a single agency only.

Bidder
Name : PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to
Sl. Item Description enter the Bidder Name and Values
Quantity only ) Estimated Rate GST % to
Units
No. Excluding GST be
(In Rs.) quoted TOTAL AMOUNT
here With Taxes
TOTAL AMOUNT
(Including Goods
In Words
& Services Tax)
(In Rs.)

1 2 4 5 6 51 53 55

2 GST % for the tender 18%


Please Note that the rate selected shall be applicable for entire items of the Boq

Zonal PE laying, Last Mile Connectivity (LMC) and Direct Marketing Agency (DMA) works
3 1 LS 100.00 18% 118.00 #VALUE!
in Saran GA authorized in State of Bihar as item rates specified in BOQ2

Total in Figures 118.00 #VALUE!

Quoted Rate in Figures Select 0.00 #VALUE!

Quoted Rate in Words #VALUE!


Please Enable Macros to View BoQ information
Q information
Item Rate BoQ
Tender Inviting Authority: General Manager (PJ-CGD) / M/s VCS QUALITY SERVICES PVT. LTD.

Name of Work: Zonal PE laying, Last Mile Connectivity (LMC) and Direct Marketing Agency (DMA) works in Saran GA authorized in State of Bihar

Tender No.: PLCGD/WORKS/ZONAL/23/13

NOTE :

1) The Bidders shall quote “Excess(+)/ At Par/ Less(-)” percentage in the BOQ1 only. This quoted “Excess(+)/ At Par/ Less(-)” percentage in the BOQ1 shall be applicable on all the rates of BOQ2, which is unit rate of each items (Bidder has to not quote in BOQ2).
2) Evaluation will be carried out on the basis of rate quoted in BOQ1.
3) Only name of the bidder and rates are to be filled by the bidder. No changes shall be made by the bidder to item Sl. No., Brief description, Quantity, Unit.
4) In case of any difference in item description/quantity/unit in BOQ, then item description/quantity/unit provided in Schedule of Rates of tender document shall prevail.
5) Do not insert any additional sheet and any condition in BOQ sheet. Please do not temper the BOQ sheet.
6) The work is of indivisible nature and shall be awarded to a single agency only. The Bidder has to necessarily quote for all the items indicated in the SOR

Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Na
Sl. Item Description Quantity Units
No.

1 2 3 4
10 PE PIPELINE WORK

Laying of MDPE Pipeline of PE100 grade with SDR 11 by any methodology (open cut trenching/trenchless/manual or mechanical boring/moling/HDD) in all kind of soil (soft/hard/rock) including hard rock with all kind of surface (normal/built-up/CC) as mentioned in SOR item. Raking up of built-up
surface for the entry and exit pit in case of laying by moling/HDD or open trenching in case line is laid by open cut method is covered under the scope of this item. Procurement and Installation of PE Fittings, Transition Fittings, Warning Mats and any other items required for execution of work shall
also be in Contractor's scope. Preparation of detailed route plan, making trial pits to determine the underground utilities/ services etc. Liasioning shall be carried out by the contractor to complete the project in totality. Restoration of the all excavation / trial pits as per satisfaction to Engineer- Incharge
(EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by
owner / other utility agencies). Trenching to the required depth in all type of surface/soil, providing additional protection like CC slab etc. as per PNGRB guideline where sufficient depth can not be attained, uncoiling / stringing of PE pipes, jointing of the PE pipe ends / fittings / valves by qualified
personnel, using approved electro fusion techniques as per the specification. No Separate rate is payable for excavation in any kind of strata including rock. All fittings whatsoever required to complete the work is in contractor's scope."
Receiving, handling, loading, transportation and unloading of owner supplied PE pipes or any other free issue material from Owner's designated stock yards to Contractor's own stock-yards / work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials.
Survey of designated area & submission of plan for laying of Medium pressure/Low pressure network/service lines for societies / colonies/ localities shall be done by the contractor. However the MDPE pipe is to be laid on best probable route after discussion with EIC. All the Proposed route/kmz file
of medium pressure main pipeline (180/125/90/63) and Low pressure network/service lines 32/20mm dia pipeline, as per site condition shall be discussed and finalised with IOCL/consultant for execution. Further, the scope of contractor also includes preparation of plan/kmz, for any change in route
due to site condition for mainline (180/125/90/63) etc. Intimation to all other utility agencies through owner/ CBuD app as per the directives of EIC. Preparation and getting approval of schedules, execution procedures, drawings / sketches. Finalizing optimum route with consent of EIC. Uncoiling /
stringing, laying and aligning of MDPE pipes in trench, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification. Achieving the desired top cover of MDPE pipeline Laying using any method with or without casing, survey
of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by EIC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the pipe dia. Jointing and insertion of the carrier pipe in casing pipe
(on case to case basis) and subsequent backfilling, compaction & restoration. Item also includes dewatering from the trench before laying of the pipes if required. The laying shall be carried out by any methodology as per specification and site requirement as decided by Engineer-in-Charge (EIC).
Lowering the PE pipe line in trench to required depth, padding around pipeline with suitable soil including supply of foreign soil/sand required in rocky area or any hard strata, supply & laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated
material, if suitable, after screening or procurement of suitable sand / soil as per directions of EIC. Compaction with manual technique / jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles / slabs / kerb stones etc. removed during excavation. Roads, pavements,
footpaths etc. shall be made motorable wherever pipeline is laid and shall be restored to original condition to the satisfaction of respective authority & EIC. Restoration Charges for all tiles / slabs / Kerb stones / Cement Concrete Road / Paver/ Brick soiling/ Asphalt road/ any type of tar road/ Red
10.001 Sand Stone/ Channels etc. will be paid over and above with the separate SOR item rate Procurement & installation of Transition fitting, GI end plug at TF for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of
job. Supply & Installation of Transition fitting of any required size for PNG Connection/SR/Domestic/Commercial/Industrial connection is included in the PE laying rate. No separate payment shall be made for supply & installation of TF. Excavation, breaking through any obstructions, insertion of pipe,
sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of concrete pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of EIC. Concrete Pedestal construction with supply of GI
sleeve is included in the contractor's scope and no separate payment shall be made. GIS data collection: The scope includes Capturing GIS data of PE network along with all PE valves and fittings and sharing data in format prescribed by EIC/IOCL. The specification of the device to be used for GIS
data capturing is part the technical volume. GIS data to be collected prior to backfilling of trenches to locate & depict the as laid underground pipelines on GIS portal. Payment for GIS data collection shall be paid separately under relevant SOR. Cleaning the area of all unserviceable materials, debris,
excess earth near trenches to the designated disposal area as per specifications, instructions of land owners / EIC to the complete satisfaction of local authorities. Supply & Installation of Pipeline Markers as per relevant SOR. Flushing, cleaning, pneumatic testing, purging with nitrogen and
commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect
liability period. Preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract. Handing over the completed works to owner for their operation/ use,
returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate. Submission of as-graphs and as-built drawings as per the attached specification and the instruction of EIC/ Owner. Final clean-up of right-of-use or area disturbed by
contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by EIC. Preparation, Certification and submission
of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements. Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be
covered under the scope of work and has to be completed by the Contractor within specified schedule. The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the
requirement of the Owner. In case more than 1 MDPE pipelines are laid in a common trench/bundle pulling, SOR rate of higher dia shall be paid as per relevant SOR. Payment for lower dia pipeline which is laid in common shall be made under item of common laying. No Separate payment shall be
made for any additional excavation including rocky strata if required for maintaining sufficient gap between two PE pipelines. PE line should preferably be laid by open cut/moling methodology so that connection can be done easily as and when required. HDD method is allowed only after consent
from Engineer In-charge (EIC) for any specific location/stretch for laying of PE line. Shallow depth to be preferred for HDD. Project area means areas where Low Pressure PE network (63/32mm) is not laid previously as decided by EIC.O&M area means areas where Low Pressure PE network
(63/32mm) PE network is already laid & backfilled or commissioned previously provided line is not laid under same work order as decided by EIC .

PE Pipe line laying without casing in all kinds of surfaces & All kinds of Soil/Strata including hard rock using any laying methodology "Payment for cutting of Built-up (PCC/RCC/Asphalt) surfaces shall be made
10.002 separately under relevant SOR wherever applicable. Paver block shall not be considered as built-up road and dismantling of paver blocks is included in this item.This item includes laying in hard rock. No separate
payment shall be made for rock excavation under any SOR item. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

10.003 Laying In Project Area : Laying of 20 mm dia (Service Line) PE Pipeline up to TF 1.00 M

10.004 Laying in O&M Area : Laying of 20 mm dia (Service Line) PE Pipeline up to TF 1.00 M

PE Pipe line laying without casing in all kinds of surfaces & All kinds of Soil/Strata except hard rock strata using any laying methodology.Payment for cutting of Built-up (PCC/RCC/Asphalt) surfaces shall be made
10.005 separately under relevant SOR wherever applicable. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. Paver block shall not be considered as built-up road
and dismantling of paver blocks is included in this item.
10.006 Laying of 32 mm dia PE Pipeline in all areas 1.00 M

10.007 Laying of 63 mm dia PE Pipeline in all areas 1.00 M

PE Pipe line laying without casing in all kinds of surfaces including built-up & Hard Rock Strata using any laying methodology. This item is applicable where rock breaker/blasting is used for excavation and diamond
10.008 cutter and other rock drilling tools are used for HDD with approval of EIC. Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. No separate payment shall be made for rock
excavation & cutting of Built-up (PCC/RCC/Asphalt) surfaces under any relevant SOR.

10.009 Laying of 32 mm dia PE Pipeline in all areas 1.00 M

10.01 Laying of 63 mm dia PE Pipeline in all areas 1.00 M

PE Pipe line laying with HDPE casing in all type of soil/surface (normal/hard/CC/Built-up etc.) & Strata including hard rock using any laying methodology. This item is applicable where rock breaker/blasting is used
for excavation and diamond cutter and other rock drilling tools are used for HDD with approval of EIC. MDPE pipeline laying by any method with supply & installation of HDPE casing pipe of PE 100 PN 6/ GI casing
pipe of heavy class as per specification in all kind of laying like Nala crossing, as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of
10.011
carrier pipe, subsequent backfilling, compaction, end sealing etc. The payment shall be made for length of casing pipe laid, remaining carrier pipe length without casing shall be paid under SOR relevant to laying
without casing pipe. No separate payment shall be made for excavation including rocky strata under any SOR item. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included
under scope. No separate payment shall be made for rock excavation & cutting of built-up (PCC/RCC/Asphalt) surfaces under any relevant SOR.

10.012 Laying of 20mm/32 mm Dia pipeline (in 63 mm dia HDPE casing pipe /3" GI casing pipe of heavy class) in project areas 1.00 M

10.013 Laying of 20mm/32 mm Dia pipeline (in 63 mm dia HDPE casing pipe /3" GI casing pipe of heavy class) in O&M areas 1.00 M

10.014 Laying of 63 mm Dia pipeline (in 125mm dia HDPE casing pipe) in all areas 1.00 M

20mm PE pipe laying (in project/O&M area) for Pedestal/Varandah/Podium Crossing with supply of HDPE casing pipe as per tender refere nce drawing, HDPE Sleeves/Concrete U blocks & Clamps for protection to
PE pipe including niche cutting on wall/platform, brick wor k, concrete work and any other civil/restoration work as per site condition. For Payment purpose, length of PE pipe shall be conside red starting from tapping
10.015 1.00 M
point of service line (20mm) till transition fitting (excluding length of road crossing if any which shall be paid under relevant SOR). No separate payment shall be made for any kind of re storation/civil work done for
crossing portion. Length of PE paid under this item shall not be paid under any other item. All work r equired for safe laying of PE pipe as per PNGRB guideline/IOCL requirement is included in the scope of this SOR.

PE Pipeline laying in common with another PE pipeline in all type of soil/surface (normal/hard/CC/Built-up etc.) & Strata including Hard rock strata by any methodology. Laying of PE pipeline in common with another
PE pipeline in same trench or same bore using any methodology in all kind of soil and surface. Payment of higher dia pipeline will be paid as per relevant SOR. For lower dia pipeline which is laid in common, payment
10.016 shall be made under this SOR. No Separate payment shall be made for any additional excavation including rocky strata if required for maintaining sufficient gap between two PE pipelines. In case two same dia
pipeline is laid one will be considered for common laying for which payment shall be made under this item. Testing, pre-commissioning, commissioning shall be paid under relevant SOR. No separate payment shall be
made for rock excavation & cutting of built-up (PCC/RCC/Asphalt) surfaces under any relevant SOR.

10.017 Laying of PE pipeline in common trench/bore in all areas 1.00 M

PE Pipe line laying in all kinds of surfaces & All kinds of Soil/Strata except hard rock strata. Payment for cutting of Built-up (PCC/RCC/Asphalt) surfaces shall be made separately under relevant SOR wherever
10.018 applicable. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. Paver block shall not be considered as built-up road and dismantling of paver blocks is included
in this item.
10.019 Laying of 90 mm dia pipeline by open trench method in all areas 1.00 M
10.02 Laying of 90 mm dia pipeline by moling/boring method in all areas 1.00 M
10.021 Laying of 125 mm dia pipeline by open trench method in all areas 1.00 M
10.022 Laying of 125 mm dia pipeline by moling/boring method in all areas 1.00 M

10.023 Laying of 180 mm dia pipeline by open trench method in all areas 1.00 M

10.024 Laying of 180 mm dia pipeline by moling/boring method in all areas 1.00 M

PE Pipe line laying in all type of Surface (normal/hard/CC/Built-up etc.) & Hard Rock Strata. This item is applicable for stretches where rock breaker/blasting is used for excavation with approval of EIC. Supply of
10.025 Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. No separate payment shall be made for rock excavation & cutting of built-up (PCC/RCC/Asphalt) surfaces under any relevant
SOR.

10.026 Laying of 90 mm dia by open trench method in all areas 1.00 M

10.027 Laying of 125 mm dia by open trench method in all areas 1.00 M

10.028 Laying of 180 mm dia by open trench method in all areas 1.00 M

PE Pipe line laying by HDD Method, without casing in all kinds of soil/surface (normal/hard/CC/Built-up etc.) & Strata excluding Hard rocky strata. MDPE pipeline laying by HDD method without casing pipe in all kinds
of surfaces, terrain & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner/ CBuD app, submission of HDD profile for approval, execution of the work as per
10.029 the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, submission of as-built drawings/ graphs
as per specification and the instructions of EIC/ SIC of owner. The all other activities required to complete the work in all respect shall be scope of the Contractor within the quoted rates. No separate payment shall be
made for cutting of built-up surface. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

10.03 Laying of 90 mm dia by HDD in all areas except hard rock 1.00 M

10.031 Laying of 125 mm dia by HDD in all areas except hard rock 1.00 M

10.032 Laying of 180 mm dia by HDD in all areas except hard rock 1.00 M
PE Pipe line laying by HDD Method, without casing in all kinds of soil/surface (normal/hard/CC/Built-up etc.) & Hard rocky strata. This item is applicable where rock breaker/ blasting is used for excavation and
diamond cutter and other rock drilling tools are used for HDD with approval of EIC. Record for use of rock cutting tools to be created and maintained for each section/HDD. MDPE pipeline laying by HDD method
without casing pipe in all kinds of surfaces, terrain & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner/ CBuD app, submission of HDD profile for approval,
10.033
execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, submission
of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner. The all other activities required to complete the work in all respect shall be scope of the Contractor within the quoted rates. No
separate payment shall be made for cutting of built-up surface. If required, Supply of Foreign sand/ soil for 150mm thick padding all around pipeline is included under scope.

10.034 Laying of 90 mm dia by HDD in all areas in hard rock 1.00 M

10.035 Laying of 125 mm dia by HDD in all areas in hard rock 1.00 M

10.036 Laying of 180 mm dia by HDD in all areas in hard rock 1.00 M

PE Pipe line laying by HDD Method, with casing (Including supply & installation of HDPE casing pipe) in all kind of soil/surface (normal/hard/CC/Built-up etc.) & Strata including Hard rocky strata. "MDPE pipeline
laying by HDD method with supply & installation of HDPE casing pipe of PE 100 PN 6 as per specification in all kind of terrain & soil condition including survey of the underground utilities, intimation to all other utility
agencies through owner/ CBuD app, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing
10.037 and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner. The all other activities required to
complete the work in all respect shall be scope of the Contractor within the quoted rates. The payment shall be made for length of casing pipe laid in HDD, remaining carrier pipe length without casing shall be paid
under SOR relevant to laying without casing pipe. No separate payment shall be made for rock excavation & cutting of built-up surface. If required, Supply of Foreign sand/ soil for 150mm thick padding all around
pipeline is included under scope."

10.038 Laying of 90 mm dia (in 180 mm HDPE casing pipe) in all areas 1.00 M

10.039 Laying of 125 mm dia (in 200-250 mm HDPE casing pipe) in all areas 1.00 M

10.04 Laying of 180 mm dia (in 300-350 mm HDPE casing pipe) in all areas 1.00 M

GIS data collection for PE pipeline. The scope includes Capturing GIS data of PE network along with all PE valves and fittings and sharing data in format prescribed by EIC/IOCL. The specification of the device to be
10.041 used for GIS data capturing is part the technical volume. GIS data to be collected prior to backfilling of trenches to locate & depict the as laid underground pipelines on GIS portal. Any rectification/re-collection of data
if required during validation is to be done by contractor at no extra cost.

10.042 GIS data collection for PE pipeline of any diameter 1.00 M

Testing of PE Pipeline. Flushing, cleaning, pneumatic testing and pressure preservation of PE pipeline laid by any method in all areas including PE pipe Line Repairing, excavation, leakage arrest, Electrofusion
10.043 jointing, supply and installation of all fittings required & all work to make network ready for pre-commissioning. Identification of damages by sectionalising the pipeline network, repairing, jointing, Any excavation
jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports, as built drawings (if any) etc.

10.044 20mm dia PE line 1.00 M


10.045 32mm dia PE line 1.00 M
10.046 63mm dia PE line 1.00 M
10.047 90mm dia PE line 1.00 M

10.048 125mm dia PE line 1.00 M

10.049 180mm dia PE line 1.00 M

Pre-Commissioning of PE Pipeline. Pre commissioning as per specification and approved procedures, providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per
10.05 the instructions of the EIC. Purging with nitrogen at positive pressure as decided by EIC and Maintaining the completed pipelines/ installation for any defect, failures till hand over. Any excavation
jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports submission of as built drawings etc.

10.051 20mm dia PE line 1.00 M


10.052 32mm dia PE line 1.00 M
10.053 63mm dia PE line 1.00 M
10.054 90mm dia PE line 1.00 M
10.055 125mm dia PE line 1.00 M
10.056 180mm dia PE line 1.00 M

Commissioning of PE Pipeline. Commissioning of PE pipeline laid by any method in all areas as per scope of work, specification and approved procedures providing all tools and tackles, supply of nitrogen,
10.057 instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures till hand over. Any excavation
jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid gr aphs/reports submission of as built drawings etc.

10.058 20mm dia PE line 1.00 M


10.059 32mm dia PE line 1.00 M
10.06 63mm dia PE line 1.00 M
10.061 90mm dia PE line 1.00 M
10.062 125mm dia PE line 1.00 M
10.063 180mm dia PE line 1.00 M
Testing of already laid PE Pipeline. "This is for the line which is laid previously by other contractor. Flushing, cleaning, pneumatic testing and pressure preservation of PE pipeline laid by any method in all areas
including identification of pending tie-ins/joints, excavation, Electrofusion jointing, supply and installation of all fittings required & all work to make network ready for pre-commissioning. Any excavation
jointing/tie-in/looping/hook-up required is included in the scope of contractor. Laying of any pup-piece for jointing of up to 2m length for is included in the scope of this item for which no extra payment shall be made. If
10.064
more than 2m PE pipeline laying is required for jointing the laid network, it will be considered as fresh laying and accordingly payment for laying shall be made under relevant SOR item for length over and above 2m.
PE Pipe required shall be issued by Owner as free issue material. Identification of damages by sectionalising the pipeline network and air filling or by any method as required. Repair work required at each identified
damaged location shall be paid separately under relevant SOR item. Scope includes Submission/updation of as laid graphs/reports, as built drawings (if any) etc. "

10.065 20mm dia PE line 1.00 M


10.066 32mm dia PE line 1.00 M
10.067 63mm dia PE line 1.00 M
10.068 90mm dia PE line 1.00 M
10.069 125mm dia PE line 1.00 M

10.07 180mm dia PE line 1.00 M

Pre-Commissioning & Commissioning of already laid PE Pipeline. This is for the line which is laid previously by other contractor. Making the tested network ready for commissioning, Purging with nitrogen at positive
pressure as decided by EIC and commissioning of PE pipeline laid by any method in all areas as per scope of work, specification and approved procedures providing all tools and tackles, supply of nitrogen,
10.071
instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures till hand over. Any excavation
jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports submission of as built drawings etc.
10.072 20mm dia PE line 1.00 M
10.073 32mm dia PE line 1.00 M
10.074 63mm dia PE line 1.00 M
10.075 90mm dia PE line 1.00 M
10.076 125mm dia PE line 1.00 M
10.077 180mm dia PE line 1.00 M
10.078 Cutting of built-up surfaces - PCC / RCC Road/asphalt multi-layer Road

Cutting of built-up surfaces - PCC / RCC Road/asphalt multi-layer Road (along length of pipeline) of any width and excavation for l aying of PE line in built-up surface as per direction of EIC. These rates are not
10.079 1.00 M
applicable on HDD method and laying in hard rock strata. Paver block shall not be considered as built-up surface and no payment shall be made under this SOR for dismantling paver bl ocks.

Providing extra protection for service lines where proper depth cannot be obtained. "The buried service lines shall be provided with a minimum cover of 1.0 m. Where it is impractical to provide 1.0 m cover due to
physical constraints, additional protective measures such as concrete slabs shall be installed at least 300 mm above the service line. In no case the depth of cover shall be less than 600mm. The depth of cover can
10.08
be further reduced up to 375 mm provided it meets the following requirements: i. The line pressure shall not exceed 110 mbar. ii. The diameter of pipe shall not exceed 63mm. All records of such cases of lesser cover
shall be prepared & maintained separately."
Supply & Installation of RCC slab of minimum 150mm thick and 300mm width for protection of pipeline. There shall be sand filling ac ross three sides of the line pipe of 100mm each shall be required to be taken by
10.081 contractor in consultation with EIC as per latest P NGRB Guidelines. No additional payment shall be admissible against the same. In case RCC slab protection is also required at the bot tom of pipeline, length of same 1.00 M
shall also be measured for payment purpose.
HSE Compliance - PE Work Charges for compliance to Health, Safety & Environment (HSE) as detailed in Scope of Work. MDPE Section-PPE, Continuous Barricades along the trenches as per approved drawing
10.082 in tender, Use of Safety Boots, Hand gloves, Reflective jackets, Hard hats(helmets), Safety shoes, eye and ear safety equipments, Fire extinguishers, warning display board and as per the detailed scope of work in
tender specifications and as per the direction of EIC.
10.083 Providing hard barricading with all HSE compliance for PE Pipeline 1.00 M
10.084 Providing Safety Cone & Chain barricading with all HSE compliance for PE Pipeline 1.00 M
10.085 Protection for Transition joint of all sizes
Pedestal - Providing PCC of grade (1:2:4) work supply and installation of GI Sleeves of 2.5" NB x 300 mm length to 3" NB x 300 mm, c onstruction of concrete pedestal of adequate size with supply of all materials,
10.086 1.00 EA
supply & filling of sand etc. for domestic connectio ns/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job.
HDPE Crash Guard - Proving PCC work supply and installation of GI Sleeves of 2.5" NB x 300 mm length to 3" NB x 300 mm, supply and i nstallation HDPE Crash Guard, supply & filling of sand etc. for domestic
10.087 1.00 EA
connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job.
Supply & Installation of GI/ MS/ Concrete Sleeves/HDPE Crash Guard (wherever required as a Special Case as per instructions of the Engineer-in-charge) "Supply, installation of sleeve, insertion of pipe, sealing the
10.088 annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-
Class) as per IS-1239. The decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In Charge/ Owner."
10.089 GI Sleeves /Concrete Sleeves
10.09 2 1/2” NB, 1’ Length 1.00 Num
10.091 4” NB, 1’ Length 1.00 Num
10.092 MS Enamel Coated
10.093 4” NB, 3’ Length 1.00 Num
10.094 Concrete Sleeve (NP-2 Class)
10.095 4” NB, 3’ Length 1.00 Num
10.096 6” NB, 3’ Length 1.00 Num

Restoration Work Restoration of excavated pits, trench, surface with required thickness as per original condition. Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition
including supply of the approved quality material required to complete the activities mentioned above as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party
inspection agencies (if any) designated by owner and to? the satisfaction of Engineer-in-charge. Asphalt road: Restoration of bitumen Asphalt road after laying of MDPE pipe line as per the drawing and to the original
10.097 conditions, specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done to the satisfaction of local authorities and to get NOC from the concerned authorities. Restoration of the all kind of
pathway by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC pf required thickness and making it as original as per the drawings and to the original conditions Item includes
providing of extra material such as Tiles/Paver/Granite etc matching to original pathways. Concrete road/ Concrete pavement: Restoration of concrete road and pavements shall be done by providing PCC 1:4:8 of
specified thickness as per the drawing and to the original condition. The cost of all materials, labours, Shuttering, compacting the base surface etc. are in the scope of this item.

10.098 Asphalt Road/ any type of tar road 1.00 M

10.099 Cement Concrete Road 1.00 M

10.1 Tiles / Paver / Blocks / Kerb Stones, Red Sand Stone 1.00 M
10.101 Brick Soling / Channels, etc. 1.00 M

Installation of valve in pit including supply of PE valves. Supply of isolation valves (as per data sheet) and installation of valves in the valve pits as per typical drawing and specification enclosed and instructions of
10.102
Engineer-in-charge. Payment of civil construction of valve Pits shall be paid separately as per relevant SOR.

10.103 PE Valve 32 mm dia 1.00 Num


10.104 PE Valve 63 mm dia 1.00 Num
10.105 PE Valve 90 mm dia 1.00 Num

10.106 PE Valve 125mm dia 1.00 Num

10.107 PE Valve 180mm dia 1.00 Num

Construction of RCC Valve Pits. Construction of Valve Pits as per the enclosed tender drawing and specification. The item includes supply of all the material including Pre-cast RCC cover, shuttering, reinforcement,
10.108 labour, curing etc as per the drgs, specification and instruction of EIC. Note: The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference
tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC.
10.109 Type-I having Internal size of approximately Rs. 1000 x 1000mm 1.00 Num
10.11 Type-II having Internal size of approximately 600 x 600mm 1.00 Num
10.111 Type-III having Internal size of approximately 1500mm x 1500mm 1.00 Num

Fabrication & Installation of Pipeline Markers: Procurement and Installation of Route Markers / Pole Markers / Plate Markers as per the attached drawings, along the route / along boundary wall, lamp posts including
10.112 all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, procurement and application of approved colour and quality of primer
and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge.

10.113 RCC Route Markers 1.00 Num


10.114 Pole markers with foundation 1.00 Num
10.115 Plate markers 1.00 Num
10.116 MDPE Repair Activity
PE pipe Line Repairing including excavation, leakage arrest, Electrofusion jointing and restoration of any dia. up-to 63 mm includin g laying, testing of PE line up to 5meter with supply and installation of all fittings
10.117 required. PE Pipe required shall be issued by Owner as free issue material. Payment for laying and testing of MDPE Pipes of length over & above 5 Meter (if required) shall be p aid as per the relevant SOR Item as 1.00 Num
per the instruction of EIC
PE pipe Line Repairing including excavation, leakage arrest, Electrofusion jointing and restoration of any dia. above 63 mm includin g laying, testing of PE line up to 5meter with supply and installation of all fittings
10.118 required. PE Pipe required shall be issued by Owner as free issue material. Payment for laying and testing of MDPE Pipes of length over & above 5 Meter (if required) shall be paid as per the relevant SOR Item as 1.00 Num
per the instruction of EIC
10.119 Civil Works
Earth Filling - Supplying and filling selected earth/ moorum (excluding black cotton soil) from Contractor's own borrow areas incl uding royalty, with all leads and lifts in low laying areas and filling to required grade
10.12 and level including watering, compacting in layers not exceeding 20 cm thickness, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of 1.00 CUM
Site Engineer.

10.121 Sand Filling - Supplying and filling in plinth with sand in low lying areas,foundation, including watering, ramming, consolidating and dressing complete. 1.00 CUM

"Paver Blocks- Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M-35 grade made by block making machine with strong vibratory compaction, of approved size, design &
10.122 1.00 SQM
shape, laid in required colour and patter n over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of the Engineer-in-Charge."

Reinforced Cement Concrete (M-25): Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and
unserviceable earth. Soil to be levelled and properly compacted complete in all respect as per scope of work including brick soiling and PCC, technical specification and directions of EIC. Providing and laying
REINFORCED CEMENT CONCRETE (RCC) of M-25 Grade (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs
10.123 1.00 CUM
including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing
pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates include grouting of
pockets, procurement of material, shuttering, tools & tackles, reinforcement etc.

10.124 Plain Cement Concrete (1:2:4)

Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using servic eable earth and disposal of surplus and unserviceable earth. Soil to be levelled and
properly compacted complete in all respect as p er scope of work, technical specification and directions of EIC. Providing and laying PLAIN CEMENT CONCRETE (PCC) (1:2:4) (Concrete shall be design mix /
10.125 nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs inclu ding pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all 1.00 CUM
necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rende ring and making smooth if required in any
position, shape, level and thickness etc. as specified and directed by EIC.
10.126 Gate and Fencing
Supply of erection of single leaf mild steel gate 2.5m high with mesh with anti climbing measures/spikes complete in all respect inc luding painting as per TS on all MS items, all works as per specification and
10.127 1.00 EA
drawings.
Supply of all materials, fabrication and erection of chain link fencing 2.5m high with mesh up to 2m height and Concertina coil/RBT wire (@100mm c/c gap) fencing complete in all respects including painting as per TS
10.128 1.00 M
on all MS items, all works as per specification and drawings.

Installations of DRS/DCU/MRS/ Metering Skid / Service Regulator. "Receiving, handling, loading, transportation and unloading of owner supplied DRS/DCU/MRS/ Metering Skid/ service regulator including wall
mounted SR from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Supply of cover box for
10.129 service regulator is in the scope of contractor. Installations of DRS/DCU/MRS/ Metering Skid/ service regulator with all associated work at foundation and hooking up with PE pipe line. The scope includes supply of
transition fittings and other PE and CS fittings, GI as per requirements and various associated works (including steel welding with NDT and pressure testing, if required) to commission DRS/MRS/Metering Skid/Service
Regulator. Payment towards civil foundation work & structural work for gate and fencing shall be payable as per relevant SOR items."

10.13 DRS / DCU 1.00 EA


10.131 MRS / Metering Skids 1.00 EA

Wall mounted/ on ground type Service Regulator Module: Installation of Service Regulator along with piping and fabrication & supply of Cover box as per drawing, painting etc. as per drawing & Construction of
10.132 1.00 EA
Brick/RCC Foundation with plaster including sand filling .
10.133 Pipeline laying liaisoning and assistance in getting permissions from the statutory authorities
"Providing assistance to IOCL to obtain permission from land/RoU owing agencies like NHAI, Indian Railways and any other government agencies who maintains the public lands. This rates are not applicable for
10.134 1.00 M
Private lands i.e. Apartments etc. Permissions required from various authorities like NHAI / SH/PWD/Railways / Irrigation (Canal) etc. falling enroute shall be inclusi ve in the item rate."
Ground Penetrating RADAR "Carrying out subsurface utility survey along the proposed pipeline route and/ or as specified by Engineer-In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth up
to 5m below the existing ground level to locate and identify all existing underground utilities/buried objects including but not limited to pipelines, sewers, conduits, cables, drains, manholes, appurtenances etc in the
proposed corridor along with location, DGPS coordinates, depth, shape and dimensional details of utilities. Four (4) Copies of Report and Drawings incorporating all collected data shall be submitted as per scope of
10.135
work and direction of the Engineer-in-charge. Scale of Drawing shall be Planimetry (X Axis 1:1000, Y Axis 1:100), Longitudinal Section (Z Axis 1:100) and Transverse Section at critical location. Note: 1.Survey Agency
for execution of GPR Survey Work to be engaged by the Contractor shall be submitted for approval of Owner/ Consultant prior to start of work. 2. GPR Work shall be carried in presence of Contractor Representative,
EPMC & TPI."

10.136 GPR Survey Length up to 1 Km including mobilisation 1.00 EA


10.137 "GPR Survey more than 1 Km Note : In case of GPR Survey Length exceeds 1 Km, payment for quantity beyond 1 Km shall be payable on per meter basis as per this S OR Item)" 1.00 M
10.138 Electrical Work
"Supply, Installation, testing & commissioning of Maintenance free Earthing with GI earth pipe, 3.0 mtr long, 100 mm dia including accessories and providing masonry enclosure with cover plate having locking
10.139 1.00 Num
arrangement etc, (with charcoal and salt ) as require d as per IS 3043. Supply and installation of GI earthling conductor of the following sizes:- Above ground/buried under ground"
Supply, Installation, testing & commissioning of Maintenance free Copper Earthing with Copper cladded GI pipe, 3.0 mtr long, 50 mm dia including accessories and providing masonry enclosure with cover plate
10.14
having locking arrangement etc, (with requisite Chemi cal ) as required.

10.141 Supply & Installation of 25X 6mm GI Strip 1.00 M

10.142 Supply & Installation of 2.5 sq.mm CuPVC wire 1.00 M

10.143 Supply & Installation 10sq. mm Cu PVC insulated cable 1.00 M

20 LAST MILE CONNECTIVITY WORK

Installation of Powder Coated GI Pipes (Heavy Class)/Cu tube/Multi Layered Composite (MLC) pipes for all floor levels including high-rise along with supply & installation of GI, Cu, MLC Fittings, welded fittings, Brass
fittings, Flexible Hose (Anaconda) if required ,Appliance Valve & Isolation valve, Meter, Regulator to complete the work asper the satisfaction of EIC. Note:-Powder Coated GI Pipe, Cu Pipe, Isolation Valve, Appliance
Valve of 1/4"" dia, Meter & Regulators shall be free issue material." Assessment of material requirement for installation at site, Order placement for Purchasing of GI fittings, Copper fittings, Brass Fittings & Flexible
Hose (Anaconda; adaptors to be used preferably, anaconda to be used only if unavoidable), 1/2" femaleX3/4" (or any size as required) male GI bush for GI to regulator & regulator to meter connection, 1/2" male X
3/4" (or any size as required) female SS adaptor for regulator to meter connection as per specification from approved/recommended vendors by Owner for completing the work, Scheduling, Planning of material &
Forwarding inspection call, getting dispatch clearance, handling, loading, transportation and unloading of these items at respective contractor’s store. Receiving, taking over, handling, loading, transportation and
unloading of owner supplied items i.e. GI & Cu Pipe, Isolation Valve, Appliance Valve Domestic, Commercial, & Industrial Meter & Regulator etc. as defined in specification from owners designated stock yard to
contractors own store/ work site, proper storing stacking, identification, providing security and insurance cover. Preparation and approval of sketches, schedules & execution procedures. Finalizing optimum route with
consent of customer from transition fitting to cooking oven / appliance and ensuring installations in well ventilated areas. Making temporary but stable platforms/ scaffolding/ rope ladders and supply of all other safety
devices. SAP/ Portal entry / Data Entry for new connections - New registration tracking and feasibility survey and its updation as per Owner defined TAT, printing of stationary as per approved Owner formats required
20.01 during connections. All fittings whatsoever required to complete the work is in contractor's scope. Connection using meter adaptor(s)/bush is preferrable instead of anaconda. Anaconda is optional and only to be used
for specific cases where connection using adaptor/bush is not possible as directed by EIC. Installation of GI service pipes & fittings, regulators, Valves etc. including NPT threading, as specified, Drillings of holes
through the walls (Brick, RCC), Granite, Marble, Wood Cutting, Glass Cutting with proper heavy duty hammer drill machine, tools & tackles, using proper sealant/grout material and colours to match the original
replacement of the damages during drilling, restoring the area to the original condition, Painting of scratched length of powder coated pipe and fittings after proper surface finish by one coat of approved primer paint
and two coats of approved synthetic enamel paint. Restoring the wall surface to original conditions. Copper tube shall be installed inside the kitchen only up to the Appliance valve as per requirement and the
satisfaction of EIC, the contractor to provide all equipment, tools and materials necessary to execute the work in efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes
supply of tools, tackles and consumables including clamp for fixing the tubes. Supply & fixing of approved clamps & nylon plugs with SS 304 2" screws, grout material, suitable thread sealant i.e. Teflon Tape, Joining
of transition fitting to above ground service GI pipes, testing, purging and commission of the complete installation. The rates in connections also includes meter and regulator installation, tap off rates etc. Installation in
already gas charged area, planning & coordinating with existing consumer's for New tap offs from existing riser with or without tee, testing of these existing risers and commissioning of these connections with newly
tap offs etc. is inclusive. Project area means - area where riser after TF/RIV is not installed/commissioned previously. O&M area means - areas where GI work is required for additional connection from already
installed/commissioned riser provided riser work is not installed/commissioned under same work order. Area to be declared and decided by EIC.

20.02 GI Pipe Installation - Threaded


20.03 Installation of 1/2" GI Pipe in Project areas including supply & installation of contractor's Supplied Materials 1.00 M

20.04 Installation of 1/2" GI Pipe in O&M areas including supply & installation of contractor's Supplied Materials 1.00 M

20.05 Installation of 3/4" GI Pipe in Project areas including supply & installation of contractor's Supplied Materials. 1.00 M
20.06 Installation of 3/4" GI Pipe in O&M areas including supply & installation of contractor's Supplied Materials 1.00 M
20.07 Installation of 1" GI Pipe in all areas including supply & installation of contractor's Supplied Materials. 1.00 M

20.08 Installation of 1.5" GI Pipe in all areas including supply & installation of contractor's Supplied Materials. 1.00 M

20.09 GI Pipe Installation - Welded

20.1 Installation of 3/4" GI Pipe in all areas including supply & installation of contractor's Supplied Materials 1.00 M

20.11 Installation of 1" GI Pipe in all areas including supply & installation of contractor's Supplied Materials. 1.00 M

20.12 Installation of 1.5" GI Pipe in all areas including supply & installation of contractor's Supplied Materials. 1.00 M
Testing & Rectification of GI Pipe Installation in any area - all type. Testing of GI network installed (new or previously) including all tools & tackles, materials, any rectification & making connection ready for conversion.
20.13
Submission/updation of as laid graphs/reports, isometric drawings etc. as required. Updation of all data in SAP/IOCL apps as directed by EIC.
20.14 1/2" GI Pipe 1.00 M
20.15 3/4" GI Pipe 1.00 M

20.16 1" GI Pipe 1.00 M

20.17 1/5" GI Pipe 1.00 M


20.18 Meter-Regulator Installation
Installation of regulator, meter with associated inlet & outlet connections with supply & installation of fittings/adaptors/anaconda , supply and fixing of approved meter brackets (as required) and other supports up to
20.19 appliance valve & surakhsa hose including supp ly of all material in contractor's scope - for any area. Scope includes online testing of gas meter and regulator assembly, GIS tagg ing of connection, Updation of all 1.00 Num
data in SAP/IOCL apps as directed by EIC.
Pre-Commissioning & Commissioning of GI Network. Pre-commissioning & Commissioning of GI network including all tools & tackles, materials, rectification/re-testing of any segment if required & making connection
20.2
ready for gas supply. Submission/updation of as laid graphs/reports, isometric drawings etc. as required. Updation of all data in SAP/IOCL apps as directed by EIC.
Pre-commissioning & Commissioning of GI network including all tools & tackles, materials, rectification/re-testing of any segment if required & making connection ready for gas supply. Submission/updation of as laid
20.21
graphs/reports, isometric drawings etc. as requir ed. Updation of all data in SAP/IOCL apps as directed by EIC.

20.22 1/2" GI Pipe 1.00 M


20.23 3/4" GI Pipe 1.00 M
20.24 1" GI Pipe 1.00 M
20.25 1/5" GI Pipe 1.00 M
20.26 Cu Tubing Work
Installation, testing, pre-commissioning & commissioning 12 mm Copper Tube - Inside kitchen location only - including supply & inst allation of contractor's Supplied Materials. Submission/updation of as laid
20.27 1.00 M
graphs/reports, isometric drawings etc. as required. Upd ation of all data in SAP/IOCL apps as directed by EIC.
20.28 Testing and Conversion of Domestic Appliances
Conversions of all the burners of LPG Stove (one appliance per household) to Natural Gas (NG) based appliances, Supply & changing of the nozzles / jets and associated controls for domestic & imported appliances
with proper tools and tackles. The rates include test ing of Kitchen piping from meter to Appliance valve and supply and fixing of one Steel reinforced Flexible Hose as per IS 9573 (wit h Type as per latest PNGRB
20.29 guidelines) per appliance/stove with clamps. Cleaning and performing minor maintenance including gas inl et side change in stove, greasing etc. of the appliance. Testing and showing the performance to the 1.00 Num
customer, signing of joint mete r records (JMR) and instructing the customer on use & safety norms, complete as per specifications & to satisfaction of owner / Engi neer in Charge. (Supply of Steel Reinforced Rubber
hose, Nozzle jets for conversion of burners is inclusive.)
20.3 Commercial Connection / Industrial Connection
Installation/Fixing of Commercial/Non-Commercial meter and regulator with associated inlet & outlet connections including supply of fittings, anaconda, valves, meter brackets. Using approved meters & regulator
20.31 1.00 Num
brackets and other supports by proper scaffolding/g routing. Restoring the area/walls to original condition as per specification and to complete satisfaction of consumer and EIC.
HSE Compliance - GI Work Charges for compliance to Health, Safety & Environment (HSE) as detailed in Scope of Work. Use of Safety Boots, harness belts, Hand gloves, Reflective jackets, Hard hats(helmets),
20.32
Safety shoes, eye and ear safety equipments, Fire extinguishers, warning display board and as per the detailed scope of work in tender specifications and as per the direction of EIC.

20.33 All HSE compliance for GI Work of any dia 1.00 M

30 DMA WORK

"Organising events (Nukkad Natak/awareness camp/audio announcement in local lanuguage) for promotion of use of Natural Gas among hou sehold consumers in societies/ coloniew etc. -The agent shall make
arrangement for conopies, Banners (as per design approved by IOCL), audio system mounted on vehicle (audio cli p to be approved by IOCL) etc. -Supply and distribution of Pamphlets of about 8.5'' X 5.5'' size
30.01 1.00 Num
(quality of paper to be used and printing material shall be appro ved by OWNER (1000 numbers of Pamphelets per events shall be arranged by agency) -Agency shall provide minimum 4 persons per event to promote
the usage of Natural Gas among household consumers."
"Installation of Hoardings at prominent Loaction (to be decided by OWNER) within city of size of about 5 m X 3 m for a period of two years.However, Payment shall be as per the actual months of installation of
particular hoarding. Agency shall be responsible for paying all amount to various authorities as per their rules and regulations including rental. The material to be printed on hoardings shall be finalised by OWNER.
30.02 1.00 MON
Hoardings can also be installed on existing advertising boards/frames available at prominent location and at the descition of OWNER. Rate is inclusive of obtaining permission for hoarding from Corporation, taxes
levied therein"
Advertisesing through running of video clip of about 30 second duration (4 times per day) in a movie theatre (to be decided by OWNER ). Video Clip to be prepared by agency in consultation with OWNER. Selection of
30.03 1.00 MON
Movie theatre shall be at the sole descretion of the OWNER only.
Advertisesing through running of audio clip of about 10 second duration (4 times per day) in one of the FM Channels (to be decided b y OWNER). Audio Clip to be prepared by agency in consultation with OWNER.
30.04 1.00 MON
Selection of FM channel will be at the sole descretion of the OWNER only.
Advertisesing through running of Video clip of about 30 second duration (6 times per day) in one of the TV Channels (to be decided b y OWNER). . Video Clip to be prepared by agency in consultation with OWNER.
30.05 1.00 MON
Selection of TV Channel for broadcasting the Video clip will be at the sole descretion of the OWNER only.
"Interaction with individual household consumers, Registration for PNG(Domestic) supply by gettings prescribed For duly filled (Form s to be provided by IOCL), data entry in IOCL's mobile/desktop applications for
30.06 PNG(D), submission of consolidated data in requisit e format on daily basis. Providing assisstance for clerance of cheque in bank, Providing uniform and ID cards to marketing executives, collection of GPS coor 1.00 Num
idnates of consumers' household and submitting it in the requisite format "
(Marketing) DMA WORK Carrying out the work of obtaining PNG registration in all respect as detailed in Scope of work and Special Con ditions of contract and as per directions/instructions of Engineer In charge
/Authorized representative including but not limited to following : 1) Enrolment & Registration of PNG Customers as per the given target. 2) Collection of filled up form along with Securi ty Deposit amount (only in the
form of cheque/Demand Draft/ Online mode) and relevant documents. 3) Carrying out the work of demand registration, evaluation, facilitation of signing of GSA and collection of security deposit and payment against
30.07
payment security as detailed in scope of work and special condition of contract of tender document as per requirement and the satisfaction of the EIC fo r industrial and commercial customers. 4) Carrying out the
marketing activities for PNG connection as per directions/instructions of the EIC including but not limited to the following: Printing & Distribution of leaflets & FAQ, Printing & Installation of banners a t prime locations,
Awareness cum Registration Camp, Audio/Visual Presentations, Organizing Road Shows, etc.

30.08 Commercial PNG Connections 1.00 EA

30.09 Industrial PNG Connections 1.00 EA


"Notes: 1) The SOR items would be executed as per the job requirement. 2) The scope as mentioned in the above SOR is of indicative nature only and shall include all activities as detailed in the relevan t clauses of
the specifications. 3) Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work a s defined in tender has to be supplied / done by contractor at no
30.1
extra cost to owner. 4) Prices quoted in column shall be all inclusive of all taxes / duties (excluding GST) and nothing extra shall be payable by the O wner except for statutory variation in GST. 5) The quantities
mentioned in SOR are tentative only and for the purpose of evaluation and may vary as per the actual site conditi on. 6) The SOR shall be read along with the relevant clauses of tender document"
Bihar

n the BOQ1 shall be applicable on all the rates of BOQ2, which is unit rate of each items (Bidder has to not quote in BOQ2).

n, Quantity, Unit.
nder document shall prevail.

cated in the SOR

PRICE SCHEDULE
aded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
BASIC RATE In TOTAL AMOUNT TOTAL AMOUNT
Figures Without Taxes In Words
Rs. P

5 54 7

#VALUE! #VALUE!
319.60

#VALUE! #VALUE!
351.55
#VALUE! #VALUE!
163.71

#VALUE! #VALUE!
164.71

#VALUE! #VALUE!
365.59

#VALUE! #VALUE!
374.21

#VALUE! #VALUE!
407.89

#VALUE! #VALUE!
448.67

#VALUE! #VALUE!
845.76

#VALUE! #VALUE!

1263.40

#VALUE! #VALUE!
49.11

247.57 #VALUE! #VALUE!


#VALUE! #VALUE!
291.31
266.92 #VALUE! #VALUE!
#VALUE! #VALUE!
316.16

#VALUE! #VALUE!
384.37

#VALUE! #VALUE!
455.25

#VALUE! #VALUE!
509.20

#VALUE! #VALUE!
556.04

#VALUE! #VALUE!
800.67

#VALUE! #VALUE!
375.14

#VALUE! #VALUE!
546.29

#VALUE! #VALUE!
786.65
#VALUE! #VALUE!
1419.58

#VALUE! #VALUE!
2039.36

#VALUE! #VALUE!
2936.72

#VALUE! #VALUE!
2202.58

#VALUE! #VALUE!
3032.65

#VALUE! #VALUE!
4367.36

#VALUE! #VALUE!
11.40

#VALUE! #VALUE!
57.02
71.27 #VALUE! #VALUE!
71.27 #VALUE! #VALUE!
#VALUE! #VALUE!
85.53

#VALUE! #VALUE!
114.04

#VALUE! #VALUE!
123.54

4.75 #VALUE! #VALUE!


7.13 #VALUE! #VALUE!
9.50 #VALUE! #VALUE!
11.88 #VALUE! #VALUE!
14.25 #VALUE! #VALUE!
16.63 #VALUE! #VALUE!

7.13 #VALUE! #VALUE!


11.88 #VALUE! #VALUE!
23.76 #VALUE! #VALUE!
28.51 #VALUE! #VALUE!
33.26 #VALUE! #VALUE!
42.76 #VALUE! #VALUE!
62.72 #VALUE! #VALUE!
78.40 #VALUE! #VALUE!
78.40 #VALUE! #VALUE!
94.08 #VALUE! #VALUE!
#VALUE! #VALUE!
125.44

#VALUE! #VALUE!
135.88

11.88 #VALUE! #VALUE!


19.01 #VALUE! #VALUE!
33.26 #VALUE! #VALUE!
40.39 #VALUE! #VALUE!
47.51 #VALUE! #VALUE!
59.39 #VALUE! #VALUE!

#VALUE! #VALUE!
171.81

#VALUE! #VALUE!
534.45

11.40 #VALUE! #VALUE!


7.60 #VALUE! #VALUE!

#VALUE! #VALUE!
101.43

#VALUE! #VALUE!
598.36

21.90 #VALUE! #VALUE!


38.11 #VALUE! #VALUE!

87.79 #VALUE! #VALUE!

22.07 #VALUE! #VALUE!


35.05 #VALUE! #VALUE!

#VALUE! #VALUE!
761.75

#VALUE! #VALUE!
886.04

#VALUE! #VALUE!
316.67
#VALUE! #VALUE!
227.48

#VALUE! #VALUE!
5144.50
10378.54 #VALUE! #VALUE!
#VALUE! #VALUE!
15641.64

#VALUE! #VALUE!
21068.06

#VALUE! #VALUE!
30338.01

19148.89 #VALUE! #VALUE!


17874.54 #VALUE! #VALUE!
#VALUE! #VALUE!
25910.47

#VALUE! #VALUE!
742.91
3069.49 #VALUE! #VALUE!
#VALUE! #VALUE!
394.51

#VALUE! #VALUE!
1768.12

#VALUE! #VALUE!
2216.57

#VALUE! #VALUE!
397.24

#VALUE! #VALUE!
1878.31

#VALUE! #VALUE!
851.62

#VALUE! #VALUE!

13134.72

#VALUE! #VALUE!

5059.27

#VALUE! #VALUE!
26402.05

#VALUE! #VALUE!
3281.69

#VALUE! #VALUE!
34620.90
#VALUE! #VALUE!
22637.66

#VALUE! #VALUE!
11501.05

#VALUE! #VALUE!
24.13

18906.42 #VALUE!
18906.42
18.94 18.94 #VALUE!

10334.34 #VALUE!
10334.34

133.22 #VALUE!
133.22

48.41 #VALUE!
48.41

108.99 #VALUE!
108.99

#VALUE! #VALUE!
155.65

#VALUE! #VALUE!
163.43

#VALUE! #VALUE!
175.57
184.34 #VALUE! #VALUE!
#VALUE! #VALUE!
189.28

#VALUE! #VALUE!
202.52

#VALUE! #VALUE!
193.12

#VALUE! #VALUE!
208.20

#VALUE! #VALUE!
222.77
51.89 #VALUE! #VALUE!
#VALUE! #VALUE!
58.52

#VALUE! #VALUE!
69.40

#VALUE! #VALUE!
74.24

#VALUE! #VALUE!
297.62

#VALUE! #VALUE!
37.63
44.27 #VALUE! #VALUE!
45.47 #VALUE! #VALUE!
#VALUE! #VALUE!
46.56

#VALUE! #VALUE!
249.81

#VALUE! #VALUE!

185.00

#VALUE! #VALUE!
1230.08

#VALUE! #VALUE!
14.25

#VALUE! #VALUE!
6206.02

#VALUE! #VALUE!
20785.63

#VALUE! #VALUE!
107923.22

#VALUE! #VALUE!
28760.05

#VALUE! #VALUE!
10114.10

#VALUE! #VALUE!
266.01

#VALUE! #VALUE!
1772.51

#VALUE! #VALUE!
2692.04

You might also like