QUOTATION FOR INSTALLATION OF 1.
5’’ LPG LINE
IN ORON PLANT
19/12/2022
S/N MATERIAL QTY PRICE PER UNIT AMOUNT
(N) (N)
1. 1.5’’ Steel pipe(25m) 3 pcs 32,000 96,000
2. 1’’ Ball Valves 2pcs 30,000 60,000
3. 2’’ Flanges 2pcs 6,000 12,000
4. 2’’ x 1’’ Reducer 6pcs 6,000 6,000
5. 1’’ Elbow Joints 3pcs 6,000 18,000
6. 1’’ Tee Joint 1pc 6,000 6,000
7. 1’’ Flange 6pcs 3,000 18,000
8. Gaskets 10pcs 800 8,000
9. 1’’ Nipples 5pcs 3,000 15,000
10. 1’’ Blind flange 1pc 6,000 6,000
11. Bolts and Nuts 36pcs 400 14,400
12. Consumables/TP/Labour 60,000
TOTAL N 319,400