01pantry Layout
01pantry Layout
TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM
ELEVATOR
WET
CORRIDOR
SHOWER
S-B4-06
W.C-1 W.C
AQUADRAIN-AQD-TG-700-SS
BAGNO DESIGN- ITEM REF NO:AQD-TDV-090920-BS- Contract Reversible Floor Drain +00
B.F.L
CORRIDOR LAUNDRY
MAID'S ROOM-1
WATER TANK CB
SETBACK LIMITS
FLR-FNS-1
ALL DIMENSION ARE IN MILLIMETERS
UNLESS NOTED OTHERWISE.
FLOOR TILE
EPOXY GROUT
CEMENT GROUT
MAIN CONTRACTOR :
CEMENT MORTAR BED
FLR-DTL-5
WATERPROOFING
CONCRETE
FLR-DTL-5
WAL-FNS-1
WAL-DTL-7
MRL-FNS-2
T A S M E E M C.
LMT-FNS-3
D E S I G N & F I T O U T
Business Bay
MIR-FNS-4 Westburry Office Tower, Office 2508
(+971 4) 3251135 ext.107
[email protected]
www.tasmeemcode.net
GLS-FNS-5
S-B4-03
GROUT
WALL TILE
WAL-DTL-6
ADHESIVE
WATERPROOFING
PLASTER
SOLID BRICK
WAL-DTL-6
R0 13.06.2023 SUJITH FOR APPROVAL
PANTRY
PAINT
WAL-DTL-7
WALL PUTTY
PLASTER
SOLID BRICK
0 0
WAL-DTL-7
CLG-GYP-3 ACOUSTIC
CEILING PANELS MOHAMMED TAMIMI
Page 11
SHADOW GAP
VILLA,Duabi,UAE
15..30
Floor slab
15
15
Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard
44
Liquid nails / glue
Wall layers:
Decorative panel
-Porcelain stoneware or decorative panel
- Tile adhesive( for a porcelain stoneware)
CLG-SH-01
or liquid nails for wood panels
-Tiefen grund primer or analog
-Putty Knauf-Fugen / Analog
One layer of 12.5 mm plasterboard.
-Tiefen grund primer or analog
15..30
-Reinforcing tape
44
±0.000 Porcelain Stoneware
Shadow gap Type 2
15
15 (tenevoy.eu)
15..30
Screed Putty
CLIENT NAME
For separation the wall from the false ceiling Knauf
Floor slab
CLG-SH-02
Putty
15
Places of cut glass fiber Leveling the final ceiling
Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber
5..20
Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface
MOHAMMED TAMIMI
Page 14
Floor slab
Floor slab
45
(tenevoy.eu)
LED strip (option)
14.3
25 Putty
Leveling the final ceiling Places of cut glass fiber
Plaster
Existing wall
PANTRY LAYOUT
Tenevoy Shadow Gap System
www.tenevoy.eu
E-P1-02
PROJECT NO: SHEET NO: FLOOR :
TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM
ELEVATOR
SLOP=5.76 %
PARKING 04 SHOWER
WET
CORRIDOR
W.C-1 W.C
+00
B.F.L
WASHBASINS
PARKING 03
CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L
CORRIDOR LAUNDRY
-295
PARKING 01
MAID'S ROOM-1
WATER TANK CB
SETBACK LIMITS
WATER TANK
NOTE :
MAIN CONTRACTOR :
SANITARY LEGEND- BASEMENT
SYMBOL TAGS DESCRIPTION QUANTITY
2.20 m
S-B4-13 BASIN MIXER
T A S M E E M C.
FLOOR FINISHING LEGEND- BASEMENT D E S I G N & F I T O U T
SYMBOL TAGS DESCRIPTION QUANTITY
1.10 m
PANTRY
7.60 m
Business Bay
Westburry Office Tower, Office 2508
FLR-FNS-1
(+971 4) 3251135 ext.107
[email protected]
FLOOR TILE
EPOXY GROUT
CEMENT GROUT
CEMENT MORTAR BED
www.tasmeemcode.net
FLR-DTL-5
WATERPROOFING
CONCRETE
S-B4-06
FLR-DTL-5
2.10 m
WALL FINISHING LEGEND- BASEMENT R0 13.06.2023 SUJITH FOR APPROVAL
0 0
0 0 0
LMT-FNS-3
CHECKED BY DRAWN BY DESIGN BY
PROJECT NAME
GLS-FNS-5
2.20 m MOHAMMED TAMIMI
GROUT
WALL TILE
VILLA,Duabi,UAE
WAL-DTL-6
ADHESIVE
WATERPROOFING
PLASTER
SOLID BRICK
WAL-DTL-6
CLIENT NAME
PAINT
WAL-DTL-7
WALL PUTTY
PLASTER
SOLID BRICK
WAL-DTL-7
MOHAMMED TAMIMI
FLOORING LAYOUT
AS SHOWN R0 13-06-2023
@ A1
TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM
ELEVATOR
SLOP=5.76 %
PARKING 04 SHOWER
WET
CORRIDOR
W.C-1 W.C
+00
B.F.L
WASHBASINS
PARKING 03
CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L
CORRIDOR LAUNDRY
-295
PARKING 01
MAID'S ROOM-1
WATER TANK CB
SETBACK LIMITS
WATER TANK
NOTE :
WALL FINISHING LEGEND- BASEMENT
ALL DIMENSION ARE IN MILLIMETERS
SYMBOL TAGS DESCRIPTION QUANTITY UNLESS NOTED OTHERWISE.
MRL-FNS-2
LMT-FNS-3
WAL-FNS-1
3.27 sq m
CLG-SH-02 MIR-FNS-4
GLS-FNS-5
T A S M E E M C.
D E S I G N & F I T O U T
Business Bay
GROUT
WALL TILE
WAL-DTL-6
ADHESIVE
WATERPROOFING
PLASTER
SOLID BRICK
WAL-DTL-6
Westburry Office Tower, Office 2508
(+971 4) 3251135 ext.107
PAINT
[email protected]
WAL-DTL-7
WALL PUTTY
PLASTER
SOLID BRICK
WAL-DTL-7 www.tasmeemcode.net
CLG-SH-02
REV.MARK
13.06.2023
DATE
SUJITH
DRAWN
FOR APPROVAL
DESCRIPTION
0 0
0 0 0
CLG-GYP-3 ACOUSTIC
CEILING PANELS
CHECKED BY DRAWN BY DESIGN BY
Page 11
SHADOW GAP
HANOUF SUJITH HANOUF
15..30
Floor slab
15
15
Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard
44
Liquid nails / glue
Wall layers:
-Porcelain stoneware or decorative panel Decorative panel
- Tile adhesive( for a porcelain stoneware)
CLG-SH-01
or liquid nails for wood panels
-Tiefen grund primer or analog
-Putty Knauf-Fugen / Analog
One layer of 12.5 mm plasterboard.
-Tiefen grund primer or analog
15..30
-Reinforcing tape
44
±0.000 Porcelain Stoneware
Shadow gap Type 2
15
15
(tenevoy.eu)
15..30
Screed Putty
CLG-SH-02 Note:
The height of the shadow groove can affect the ability to install the finish floor covering.
This must be taken into account before starting finishing work.
Page 8
PROJECT NAME
For separation the wall from the false ceiling Knauf
Floor slab
CLG-SH-02
Putty
Existing wall
15
Places of cut glass fiber Leveling the final ceiling
Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber 5..20
MOHAMMED TAMIMI
- Putty Knauf-Fugen / Analog
- Knauf sheet
- Metal frame Knauf
Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface
VILLA,Duabi,UAE
Page 14
Floor slab
Floor slab
45
(tenevoy.eu)
LED strip (option)
14.3
25 Putty
Leveling the final ceiling Places of cut glass fiber
Plaster
Existing wall
CLIENT NAME
DRAWING TITLE
CEILING LAYOUT
AS SHOWN R0 13-06-2023
@ A1
TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM
ELEVATOR
SLOP=5.76 %
PARKING 04 SHOWER
WET
CORRIDOR
W.C-1 W.C
+00
B.F.L
WASHBASINS
PARKING 03
CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L
CORRIDOR LAUNDRY
-295
PARKING 01
VALVE CHAM.
BATH R.1
SUMP PIT PANTRY-1
MAID'S ROOM-1
WATER TANK CB
SETBACK LIMITS
WATER TANK
NOTE :
CEILING LAYOUT
T A S M E E M C.
DESIGN & FITOUT
Business Bay
Westburry Office Tower, Office 2508
ELEVATION-C ELEVATION-D (+971 4) 3251135 ext.107
[email protected]
www.tasmeemcode.net
0 0
0 0 0
Meydan Sobha,
WALL PAINT
1.63 sq m
Al Merkadh,Duabi,UAE
CLIENT NAME
WALL PAINT
3.53 sq m
fridge
A DRAWING TITLE
B D
C
PANTRY
LAYOUTS & SECTIONS
PANTRY fridge
SCALE : REV. NO. DATE :
1:50 @ A1 R0 09-01-2023