0% found this document useful (0 votes)
37 views4 pages

01pantry Layout

Uploaded by

rolly
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views4 pages

01pantry Layout

Uploaded by

rolly
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

KEY PLAN :

SANITARY LEGEND- BASEMENT


BATH R.2 SHOWER CHANGING R.
SERVICES
DRIVER ROOM

SYMBOL TAGS DESCRIPTION QUANTITY


PANTRY-2
BATH R.
LOCKERS

TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM

ELEVATOR

CONTRACT REVERSIBLE FLOOR DRAIN PARKING 04


SLOP=5.76 %

WET
CORRIDOR
SHOWER

S-B4-06
W.C-1 W.C
AQUADRAIN-AQD-TG-700-SS
BAGNO DESIGN- ITEM REF NO:AQD-TDV-090920-BS- Contract Reversible Floor Drain +00
B.F.L

With Tile Insert WASHBASINS


PARKING 03
Reversible Floor Drain- with Tile Insert- Vertical Outlet Dia. 50 mm-Capacity - 40 l/m
CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L

CORRIDOR LAUNDRY

S-B4-13 BASIN MIXER PARKING 01


-295

VALVE CHAM. BATH R.1


SUMP PIT PANTRY-1

G.T SAND TRAP GYM

MAID'S ROOM-1

WATER TANK & PUMP ROOM

WATER TANK CB

SETBACK LIMITS

S-B4-14 KITCHEN SINK WATER TANK

FLOOR FINISHING LEGEND- BASEMENT


SYMBOL TAGS DESCRIPTION QUANTITY
NOTE :

FLR-FNS-1
ALL DIMENSION ARE IN MILLIMETERS
UNLESS NOTED OTHERWISE.

FLOOR TILE
EPOXY GROUT
CEMENT GROUT
MAIN CONTRACTOR :
CEMENT MORTAR BED

FLR-DTL-5
WATERPROOFING
CONCRETE

FLR-DTL-5

WALL FINISHING LEGEND- BASEMENT


SYMBOL TAGS DESCRIPTION QUANTITY

WAL-FNS-1

WAL-DTL-7
MRL-FNS-2

T A S M E E M C.
LMT-FNS-3
D E S I G N & F I T O U T

Business Bay
MIR-FNS-4 Westburry Office Tower, Office 2508
(+971 4) 3251135 ext.107
[email protected]
www.tasmeemcode.net
GLS-FNS-5

S-B4-03
GROUT
WALL TILE

WAL-DTL-6
ADHESIVE
WATERPROOFING
PLASTER
SOLID BRICK

WAL-DTL-6
R0 13.06.2023 SUJITH FOR APPROVAL

REV.MARK DATE DRAWN DESCRIPTION

PANTRY
PAINT

WAL-DTL-7
WALL PUTTY
PLASTER
SOLID BRICK

ARCHITECT PROJECT MANAGER


WAL-DTL-7

0 0

CEILING FINISHING LEGEND- BASEMENT STRUCTURAL ELECTRICAL MECHANICAL

SYMBOL TAGS DESCRIPTION QUANTITY


S-B4-14 0 0 0

FLR-FNS-1 CLG-GYP-1 ORDINARY CHECKED BY DRAWN BY DESIGN BY


S-B4-13 GYPSUM CEILING

HANOUF SUJITH HANOUF


CLG-GYP-2 MOISTURE RESISTANT
GYPSUM CEILING
PROJECT NAME

WAL-DTL-7
CLG-GYP-3 ACOUSTIC
CEILING PANELS MOHAMMED TAMIMI
Page 11

SHADOW GAP
VILLA,Duabi,UAE

15..30
Floor slab

15

15
Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard

44
Liquid nails / glue

Wall layers:
Decorative panel
-Porcelain stoneware or decorative panel
- Tile adhesive( for a porcelain stoneware)

CLG-SH-01
or liquid nails for wood panels
-Tiefen grund primer or analog
-Putty Knauf-Fugen / Analog
One layer of 12.5 mm plasterboard.
-Tiefen grund primer or analog
15..30
-Reinforcing tape

For wall paneling with invisible damper seams


-Putty Knauf-Fugen / Analog
Metal frame Knauf
-Knauf plate
-Knauf metal frame
Self-tapping screw

44
±0.000 Porcelain Stoneware
Shadow gap Type 2

15
15 (tenevoy.eu)

15..30
Screed Putty

aluminum- matt black finish


Note:
The height of the shadow groove can affect the ability to install the finish floor covering.
This must be taken into account before starting finishing work. Tenevoy Shadow Gap System
www.tenevoy.eu

Shadow gap Type 1 for plastering (tenevoy.eu)


Vertical section
Page 8

CLIENT NAME
For separation the wall from the false ceiling Knauf

SHADOW GAP- WITH LED LIGHT


Wall-Ceiling node

Floor slab

Knauf metal frame for ceiling


55
Self-tapping screw

CLG-SH-02
Putty

Shadow profile Type 2- Wall-ceiling


Existing wall

15
Places of cut glass fiber Leveling the final ceiling

Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber
5..20

- Finishing putty Rotbant Paste Profi / Analog


- Painting net / fiberglass

For wall paneling with invisible damper seams


15..30 Shadow gap Type 1
- Rotband Finish putty / Analog
- Primer Tiefengrund / Analog (tenevoy.eu)
Diffuser (optional)
- Putty Knauf-Fugen / Analog
- Primer Tiefengrund / Analog
LED strip (option)
- Reinforcing tape
- Putty Knauf-Fugen / Analog
- Knauf sheet
- Metal frame Knauf

Последовательность монтажа : Installation sequence:


1. Align the walls
2. Install a metal ceiling frame Knauf

aluminum- matt black finish


3. Sew up with 1 layer of plasterboard
4. Install the Shadow gap on liquid nails and fix it with self-tapping screws
5. Install the 2nd layer of drywall sheet, remove it in the Shadow gap
6. Prepare surfaces for framed topcoats using building mixtures
7. Paint / apply decorative plaster on the wall and ceiling
8. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers
(example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
we apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)

Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface

Tenevoy Shadow Gap System


The shade profile is also suitable for single-layer headliners. In this case, the profile is mounted directly to the metal frame
www.tenevoy.eu
and then we install the plasterboard sheet

MOHAMMED TAMIMI
Page 14

The Shadow gap type 4 niche for plasterboard ceilings (tenevoy.eu)


Vertical section

Ceiling niche for lighting the ceiling around the perimeter

SHADOW GAP- WITH LED LIGHT


all-ceiling node (Single layer

Floor slab

Floor slab

Dowel (if necessary)


55

Shadow profile Type 4- for ceiling


CLG-SH-03
Knauf metalframe for ceiling
Shadow gap Type 4

45
(tenevoy.eu)
LED strip (option)

14.3
25 Putty
Leveling the final ceiling Places of cut glass fiber
Plaster

Existing wall

Ceiling niche for lighting the ceiling around the perimeter


Installation sequence:
1. Align the walls
2. Install the Shadow gap TYPE 4 and fix it with dowels
3. Install a metal ceiling frame Knauf (without a stringer)
4. Sew up with 1 layer of plasterboard
5. Prepare the surface of the ceiling for the topcoat using building mixtures
6. Paint / apply decorative plaster on the wall and ceiling
7. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers (
example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
We apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)
aluminum- matt white finish

PANTRY LAYOUT
Tenevoy Shadow Gap System
www.tenevoy.eu

LUMINAIRE KEY (BOH-HIGH LEVEL) DRAWING TITLE

IMAGE TYPE REF. DESCRIPTIONS QTY.

RECESSED DOWNLIGHT WITH TRIM, IP54


PANTRY LAYOUT
BOH-02 Lamp: LED 3000K, Non-Dim.
Finishes: White

SCALE : REV. NO. DATE :

PANTRY EQUIPMENT LEGEND- BASEMENT


AS SHOWN R0 13-06-2023
SYMBOL TAGS DESCRIPTION QUANTITY
@ A1

E-P1-02
PROJECT NO: SHEET NO: FLOOR :

DC-68-00 ID-ARC-01 BASEMENT


KEY PLAN :

BATH R.2 SHOWER CHANGING R.


SERVICES
DRIVER ROOM PANTRY-2
BATH R.
LOCKERS

TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM

ELEVATOR

SLOP=5.76 %

PARKING 04 SHOWER
WET
CORRIDOR
W.C-1 W.C

+00
B.F.L

WASHBASINS
PARKING 03

CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L

CORRIDOR LAUNDRY

-295
PARKING 01

VALVE CHAM. BATH R.1


SUMP PIT PANTRY-1

G.T SAND TRAP GYM

MAID'S ROOM-1

WATER TANK & PUMP ROOM

WATER TANK CB

SETBACK LIMITS

WATER TANK

NOTE :

ALL DIMENSION ARE IN MILLIMETERS


UNLESS NOTED OTHERWISE.

MAIN CONTRACTOR :
SANITARY LEGEND- BASEMENT
SYMBOL TAGS DESCRIPTION QUANTITY

CONTRACT REVERSIBLE FLOOR DRAIN


S-B4-06 AQUADRAIN-AQD-TG-700-SS
BAGNO DESIGN- ITEM REF NO:AQD-TDV-090920-BS- Contract Reversible Floor Drain
With Tile Insert
Reversible Floor Drain- with Tile Insert- Vertical Outlet Dia. 50 mm-Capacity - 40 l/m

2.20 m
S-B4-13 BASIN MIXER

S-B4-14 KITCHEN SINK

T A S M E E M C.
FLOOR FINISHING LEGEND- BASEMENT D E S I G N & F I T O U T
SYMBOL TAGS DESCRIPTION QUANTITY
1.10 m
PANTRY
7.60 m

Business Bay
Westburry Office Tower, Office 2508
FLR-FNS-1
(+971 4) 3251135 ext.107
[email protected]
FLOOR TILE
EPOXY GROUT
CEMENT GROUT
CEMENT MORTAR BED
www.tasmeemcode.net
FLR-DTL-5
WATERPROOFING
CONCRETE

S-B4-06
FLR-DTL-5

2.10 m
WALL FINISHING LEGEND- BASEMENT R0 13.06.2023 SUJITH FOR APPROVAL

SYMBOL TAGS DESCRIPTION QUANTITY REV.MARK DATE DRAWN DESCRIPTION

ARCHITECT PROJECT MANAGER


WAL-FNS-1

0 0

FLR-FNS-1 MRL-FNS-2 STRUCTURAL ELECTRICAL MECHANICAL

0 0 0

LMT-FNS-3
CHECKED BY DRAWN BY DESIGN BY

HANOUF SUJITH HANOUF


MIR-FNS-4

PROJECT NAME

GLS-FNS-5
2.20 m MOHAMMED TAMIMI
GROUT
WALL TILE
VILLA,Duabi,UAE
WAL-DTL-6
ADHESIVE
WATERPROOFING
PLASTER
SOLID BRICK

WAL-DTL-6

CLIENT NAME
PAINT

WAL-DTL-7
WALL PUTTY
PLASTER
SOLID BRICK

WAL-DTL-7

MOHAMMED TAMIMI

FLOOR LAYOUT DRAWING TITLE

FLOORING LAYOUT

SCALE : REV. NO. DATE :

AS SHOWN R0 13-06-2023
@ A1

PROJECT NO: SHEET NO: FLOOR :

DC-68-00 ID-ARC-01 BASEMENT


KEY PLAN :

BATH R.2 SHOWER CHANGING R.


SERVICES
DRIVER ROOM PANTRY-2
BATH R.
LOCKERS

TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM

ELEVATOR

SLOP=5.76 %

PARKING 04 SHOWER
WET
CORRIDOR
W.C-1 W.C

+00
B.F.L

WASHBASINS
PARKING 03

CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L

CORRIDOR LAUNDRY

-295
PARKING 01

VALVE CHAM. BATH R.1


SUMP PIT PANTRY-1

G.T SAND TRAP GYM

MAID'S ROOM-1

WATER TANK & PUMP ROOM

WATER TANK CB

SETBACK LIMITS

WATER TANK

NOTE :
WALL FINISHING LEGEND- BASEMENT
ALL DIMENSION ARE IN MILLIMETERS
SYMBOL TAGS DESCRIPTION QUANTITY UNLESS NOTED OTHERWISE.

WAL-FNS-1 MAIN CONTRACTOR :

MRL-FNS-2

LMT-FNS-3
WAL-FNS-1
3.27 sq m

CLG-SH-02 MIR-FNS-4

GLS-FNS-5
T A S M E E M C.
D E S I G N & F I T O U T

Business Bay
GROUT
WALL TILE

WAL-DTL-6
ADHESIVE
WATERPROOFING
PLASTER
SOLID BRICK

WAL-DTL-6
Westburry Office Tower, Office 2508
(+971 4) 3251135 ext.107
PAINT
[email protected]
WAL-DTL-7
WALL PUTTY
PLASTER
SOLID BRICK

WAL-DTL-7 www.tasmeemcode.net
CLG-SH-02

BOH-02 CEILING FINISHING LEGEND- BASEMENT


SYMBOL TAGS DESCRIPTION QUANTITY
R0

REV.MARK
13.06.2023

DATE
SUJITH

DRAWN
FOR APPROVAL

DESCRIPTION

CLG-GYP-1 ORDINARY ARCHITECT PROJECT MANAGER


GYPSUM CEILING

0 0

CLG-GYP-2 MOISTURE RESISTANT


CLG-GYP-2 GYPSUM CEILING
STRUCTURAL ELECTRICAL MECHANICAL

0 0 0
CLG-GYP-3 ACOUSTIC
CEILING PANELS
CHECKED BY DRAWN BY DESIGN BY
Page 11

SHADOW GAP
HANOUF SUJITH HANOUF

15..30
Floor slab

15

15
Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard

44
Liquid nails / glue

Wall layers:
-Porcelain stoneware or decorative panel Decorative panel
- Tile adhesive( for a porcelain stoneware)

CLG-SH-01
or liquid nails for wood panels
-Tiefen grund primer or analog
-Putty Knauf-Fugen / Analog
One layer of 12.5 mm plasterboard.
-Tiefen grund primer or analog
15..30
-Reinforcing tape

For wall paneling with invisible damper seams


-Putty Knauf-Fugen / Analog Metal frame Knauf
-Knauf plate
-Knauf metal frame
Self-tapping screw

44
±0.000 Porcelain Stoneware
Shadow gap Type 2
15

15
(tenevoy.eu)

15..30
Screed Putty

aluminum- matt black finish

CLG-SH-02 Note:
The height of the shadow groove can affect the ability to install the finish floor covering.
This must be taken into account before starting finishing work.

Shadow gap Type 1 for plastering (tenevoy.eu)


Vertical section
Tenevoy Shadow Gap System
www.tenevoy.eu

Page 8
PROJECT NAME
For separation the wall from the false ceiling Knauf

SHADOW GAP- WITH LED LIGHT


Wall-Ceiling node

Floor slab

Knauf metal frame for ceiling


55
Self-tapping screw

CLG-SH-02
Putty

Existing wall

Shadow profile Type 2- Wall-ceiling

15
Places of cut glass fiber Leveling the final ceiling

Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber 5..20

- Finishing putty Rotbant Paste Profi / Analog


- Painting net / fiberglass

For wall paneling with invisible damper seams


15..30 Shadow gap Type 1
- Rotband Finish putty / Analog
(tenevoy.eu)
- Primer Tiefengrund / Analog
Diffuser (optional)
- Putty Knauf-Fugen / Analog
- Primer Tiefengrund / Analog
LED strip (option)
- Reinforcing tape

MOHAMMED TAMIMI
- Putty Knauf-Fugen / Analog
- Knauf sheet
- Metal frame Knauf

Последовательность монтажа : Installation sequence:


1. Align the walls
2. Install a metal ceiling frame Knauf

aluminum- matt black finish


3. Sew up with 1 layer of plasterboard
4. Install the Shadow gap on liquid nails and fix it with self-tapping screws
5. Install the 2nd layer of drywall sheet, remove it in the Shadow gap
6. Prepare surfaces for framed topcoats using building mixtures
7. Paint / apply decorative plaster on the wall and ceiling
8. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers
(example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
we apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)

Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface

Tenevoy Shadow Gap System


The shade profile is also suitable for single-layer headliners. In this case, the profile is mounted directly to the metal frame
and then we install the plasterboard sheet www.tenevoy.eu

VILLA,Duabi,UAE
Page 14

The Shadow gap type 4 niche for plasterboard ceilings (tenevoy.eu)


Vertical section

Ceiling niche for lighting the ceiling around the perimeter

SHADOW GAP- WITH LED LIGHT


all-ceiling node (Single layer

Floor slab

Floor slab

Dowel (if necessary)


55

Shadow profile Type 4- for ceiling


CLG-SH-03
Knauf metalframe for ceiling
Shadow gap Type 4

45
(tenevoy.eu)
LED strip (option)

14.3
25 Putty
Leveling the final ceiling Places of cut glass fiber
Plaster

Existing wall

Ceiling niche for lighting the ceiling around the perimeter


Installation sequence:
1. Align the walls
2. Install the Shadow gap TYPE 4 and fix it with dowels
3. Install a metal ceiling frame Knauf (without a stringer)
4. Sew up with 1 layer of plasterboard
5. Prepare the surface of the ceiling for the topcoat using building mixtures
6. Paint / apply decorative plaster on the wall and ceiling
7. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers (
example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
We apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)
aluminum- matt white finish
Tenevoy Shadow Gap System
www.tenevoy.eu

CLIENT NAME

LUMINAIRE KEY (BOH-HIGH LEVEL)


IMAGE TYPE REF. DESCRIPTIONS QTY.
MOHAMMED TAMIMI
RECESSED DOWNLIGHT WITH TRIM, IP54
BOH-02 Lamp: LED 3000K, Non-Dim.

CEILING LAYOUT Finishes: White

DRAWING TITLE

CEILING LAYOUT

SCALE : REV. NO. DATE :

AS SHOWN R0 13-06-2023
@ A1

PROJECT NO: SHEET NO: FLOOR :

DC-68-00 ID-ARC-01 BASEMENT


KEY PLAN :

BATH R.2 SHOWER CHANGING R.


SERVICES
DRIVER ROOM PANTRY-2
BATH R.
LOCKERS

TURKISH
BATH
MAID'S ROOM-2
ELEC.
ROOM

ELEVATOR

SLOP=5.76 %

PARKING 04 SHOWER
WET
CORRIDOR
W.C-1 W.C

+00
B.F.L

WASHBASINS
PARKING 03

CORRIDOR fridge
SAUNA STEAM
A
B D
C
CINEMA
-600 PANTRY fridge
PARKING 02 B.F.L

CORRIDOR LAUNDRY

-295
PARKING 01

VALVE CHAM.
BATH R.1
SUMP PIT PANTRY-1

G.T SAND TRAP GYM

MAID'S ROOM-1

WATER TANK & PUMP ROOM

WATER TANK CB

SETBACK LIMITS

WATER TANK

NOTE :

ALL DIMENSION ARE IN MILLIMETERS


UNLESS NOTED OTHERWISE.
WALL PAINT
6.3 sq m

WALL PAINT MAIN CONTRACTOR :


4.78 sq m

CEILING LAYOUT

T A S M E E M C.
DESIGN & FITOUT

Business Bay
Westburry Office Tower, Office 2508
ELEVATION-C ELEVATION-D (+971 4) 3251135 ext.107
[email protected]
www.tasmeemcode.net

R0 09.01.2023 SUJITH FOR APPROVAL

REV.MARK DATE DRAWN DESCRIPTION

ARCHITECT PROJECT MANAGER

0 0

STRUCTURAL ELECTRICAL MECHANICAL

0 0 0

CHECKED BY DRAWN BY DESIGN BY

HANOUF SUJITH HANOUF


FLOOR LAYOUT
PROJECT NAME

Meydan Sobha,
WALL PAINT
1.63 sq m
Al Merkadh,Duabi,UAE

CLIENT NAME

WALL PAINT
3.53 sq m

fridge
A DRAWING TITLE

B D
C
PANTRY
LAYOUTS & SECTIONS
PANTRY fridge
SCALE : REV. NO. DATE :

1:50 @ A1 R0 09-01-2023

PROJECT NO. DC-68-00

PANTRY LAYOUT ELEVATION-A ELEVATION-B


SHEET NO. ID-ARC-01

You might also like