the ON position
This ensures that the EV Charger is ready to be controlled by our Smart Energy
After DSW 1.3 is turned ON, perform the EV Charger Connectivity test in SetApp
(ver. 2.18.1) to validate the ability to control the EV Charger via UDP commands.
https://marketing.solaredge.com/evsetup 1/5
6/1/23, 10:02 AM EV Set up
https://marketing.solaredge.com/evsetup 2/5
6/1/23, 10:02 AM EV Set up
4. Verify that AC connection box is covered (top left cabinet) and turn back ON AC power
to the EV Charger
Notes:
cycle.
For DSW setting change to be activate, the EV Charger must be restarted
To restart, press the "Service button" T1 until the first signal tone is heard
(approx. 1 second)
Or briefly cycle AC power of the EV Charger
7. After successful test results close the communication panel and the cover
Recommendation for new EV Charger installations or when visiting a site with an existing
EV Charger:
Ensure EV Charger and SolarEdge Inverter are on the same internal IP network
https://marketing.solaredge.com/evsetup 3/5
6/1/23, 10:02 AM EV Set up
To avoid multiple site visits to the customers, we recommend waiting till the
inverter Local Control firmware upgrade is released (targeted for CPU Version 4.18
by end of 2022).
After the inverter Local Control firmware upgrade is available, visit the site:
logo
https://marketing.solaredge.com/evsetup 4/5
6/1/23, 10:02 AM EV Set up
https://marketing.solaredge.com/evsetup 5/5