A8 Documented Information For Internal Audit
A8 Documented Information For Internal Audit
1. OBJECTIVE
2. SCOPE
This procedure applies to the Quality Management System of Khomanie Group Four
Projects. It is applicable to Khomanie Group Four Projects as we seek to plan and
conduct internal audit of an quality management system or manage an audit
programme. It includes:
3. PROCESS OWNER
4. REFERENCES
ISO 9001:2015, Clause 9.1.2 : Evaluation of Compliance
ISO 19011:2018 : Guidelines for Auditing Management Systems
.
Page 1 of 6
The following positions have responsibilities and authorities in this process:
Project Coordinators
Project Managers
Auditor
Quality Management Representative
6.1. Audit
Systematic, independent and documented process for obtaining objective evidence and
evaluating it objectively to determine the extent to which the audit criteria are fulfilled.
6.9. Auditor
Person who conducts an audit
6.10. Auditee
Organization as a whole or parts thereof being audited
6.12. Conformity
Fulfilment of a requirement
6.13. Nonconformity
Non-fulfilment of a requirement
6.14. Performance
.
Page 2 of 6
Measurable result
6.15. Effectiveness
Extent to which planned activities are realized and planned results achieved
6.16. Process
Set of interrelated or interacting activities that use inputs to deliver an intended result
7. AUDIT PROCESS
7.3 Audits shall be conducted to verify the effectiveness of corrective action taken on
previous audits as well as whether activities and results conform to the requirements
of ISO 9001:2015 Standard, ISO 19011:2018, Khomanie Group Four Projects’
Procedures, Work Instructions, specifications or contracts and legislation and that
these are effective and add value to Khomanie Group Four Projects’ performance.
The audits shall be coordinated by the Quality Management Representative and
performed by an employee or Consultant who is independent of the responsibilities
for the activities being audited, and who has acquired training and skills in auditing
techniques.
7.4 Audit findings shall be recorded and included in a report and discussed by the auditor
with the personnel responsible for the activities audited. The auditor shall direct
nonconformities mentioned in the report to the addressee with a Request for
Improvement report (RFI) Form. The addressee shall reply to the RFI being
discussed within 14 days to ensure timely corrective action on the nonconformities
that were found. The audit report shall be numbered.
7.5 The following subjects shall be discussed in the audit report when and where
relevant:
7.6 A summary of findings shall be discussed during the Management Review meetings.
.
Page 3 of 6
7.7 Follow-up audits to verify the implementation and effectiveness of the corrective
action shall be done. Depending on the seriousness of the matter such a follow-up
may only be done during the following scheduled audit for that activity.
8. RECORDS
Audit Reports Admin Office Quality Management Lever arch file in audit report number 3 Years Recycle
Project /Coordinator’s office Representative sequence.
A back-up will be available on the PC 6 Years Delete
Request for Improvement Admin Office / Quality Management Lever arch file in RFI number 3 Years Recycle
(RFI) Project Coordinator’s office Representative sequence
.
Page 4 of 6