0% found this document useful (0 votes)
18 views16 pages

Group 7

The document discusses solving three assignment problems. The first assigns workers to jobs to minimize costs. The second assigns jobs to machines. The third assigns registration centers to people to maximize profits.

Uploaded by

Anik Saha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views16 pages

Group 7

The document discusses solving three assignment problems. The first assigns workers to jobs to minimize costs. The second assigns jobs to machines. The third assigns registration centers to people to maximize profits.

Uploaded by

Anik Saha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

PREMIER UNIVERSITY, CHITTAGONG.

FACULTY OF BUSINESS STUDIES.

Course Title : Operation Research


Assignment On : Assignment Problem

SUBMITTED TO:
Mr. Touhidul Islam
Lecturer,
Premier University, Chittagong.

SUBMITTED BY:

Sl Name: ID:
0 Mithila Afrin 1503210108660
1
0 Samia Farha 1503210108667
2
0 Ablin Hoq 1503210108664
3
0 Umme Haney Mishaka 1503210108707
4
0 Ami Chakma 1402810106823
5

Batch : 32nd
Program : BBA
Semester : 5th
Section :B
Submission Date : 02/07/2018
Assignment Problem

Question 1: A manager has four workers.A,B,C and D


who are to be assign jobs 1,2,3, and 4 .The alternative
and estimated jobs compliation cost are given below:
A B C D
1 $15 $20 $18 $24
2 $12 $17 $16 $15
3 $14 $15 $19 $17
4 $11 $14 $12 $13
Solution:
Row reduction : Original Cost:
Employee

Job A B C D Row
Minimum
1 15 20 18 24 15
2 12 17 16 15 12
3 14 15 19 17 14
4 11 14 12 13 11

Cost after row reduction:


Employee
Job A B C D
1 0 5 3 9
2 0 5 4 3
3 0 1 5 3
4 0 3 1 2
Column Reduction of opportunity costs revised
(row reduction) cost:
Employee

Job A B C D
1 0 5 3 9
2 0 5 4 3
3 0 1 5 3
4 0 3 1 2
Column 0 1 1 2
minimum
Column Reduction:
Employee

Job A B C D
1 0 4 2 7
2 0 4 3 1
3 0 0 4 1
4 0 2 0 0
Determine the minimum number of liner
needed to cover the zeros:
Employee

Job A B C D

1 0 4 2 7
2 0 4 3 1

3 0 0 4 1

4 0 2 0 0

1 is the smallest uncovered cost

Further Revision of the cost table revised cost:

Employee
Job A B C D
1 0 3 1 6

2 0 3 2 0

3 1 0 4 1

4 1 2 0 0

Optimal Assignment:
Assignment Cost
1. A 15
2. B 15
3. C 15
4. D 12
Total cost $57
Problem 2 :
The following table contains processing cost 2 job’s
on various machines each job must be procied one
machine determine asset of baring that will
minimize total proceeding cost.

Jobs
Machine 1 2
A 8 7
B 5 4
C 3 1

Solution :
Assignment technique required square tables . There are
3 machine & only 2 job’s so a third (dummy) job must be
added resulting in this table.

Jobs
Machine 1 2 3
A 8 7 0
B 5 4 0

C 3 1 0

Smallest value in each row is zero. Consiquently a


row reduction will result in the same value. There
fore we move to the next step which is a column
reduction.

Job

Machine 1 2 3 Column
reduction
A 8 7 0 3
B 5 4 0 1

C 3 1 0 0

Cost after column reduction


Job

Machine 1 2 3
A 5 6 0
B 2 3 0
C 0 0 0

Determining minimum no. of line require to cover


the zeros:
Job

Machine 1 2 3
A 5 6 0
B 2 3 0
C 0 0 0
2 is the smallest value.
Further revision of the cost table.
Jobs

Machine 1 2 3
A 3 4 0
B 0 1 0
C 0 0 0

Optimal Assignment:
Assignment Cost
A.3 0
B. 1 5
C. 2 1

Total cost $6
problem- 3
There are five registrations centers 5 persons are
available for service
Person
center A B C D E
1 30 37 40 28 40
2 40 24 27 21 36
3 40 32 33 30 35
4 25 38 40 36 36
5 29 62 41 34 39

How should the centers be assigned to person so as to


maximize the profit.

Solution:
Identify the highest value and substract each value from
highest value we get,

Person
center A B C D E
1 32 25 22 34 22
2 22 28 35 41 26
3 22 30 29 32 27
4 27 24 22 26 27
5 33 0 21 28 23

Row reduction :
Person
center A B C D E Row
Minimum
1 32 25 22 34 22 22
2 22 38 35 41 26 22
3 22 30 29 32 27 22
4 37 24 22 26 26 22
5 33 0 21 28 23 0
Value after Row reduction:
Person
center A B C D E Column
minimum
1 10 3 0 8 0 0
2 0 16 13 15 4 0
3 0 8 7 6 5 0
4 15 2 0 0 4 4
5 33 0 21 24 23 0
Column reduction of the value after row reduction

Value after column reduction:


Person
Center A B C D E
1 10 3 0 8 0
2 0 16 13 15 4
3 0 8 7 6 5
4 15 2 0 0 4
5 33 0 21 24 23
Determining the minimum no. of line needed to cover
the zeros
Person
Center A B C D E
1 10 3 0 8 0
2 0 16 13 15 4
3 0 8 7 6 5
4 15 2 0 0 4
5 33 0 21 24 23

Further revision of the table


person
Center A B C D E
1 14 3 0 8 0
2 0 12 9 11 0
3 0 4 3 2 1
4 19 2 0 0 4
5 37 0 21 24 23

Optimal Assignment :
Assignment Value
1–C 40
2–E 36
3–A 40
4–D 36
5–B 62
Total= $214
So, total maximize profit 214 .