1. EXECUTIVE SUMMARY
2. BACKGROUND FACTS
2.1. The subject property falls within Parklands Phase 14C. The development parameters
for single residential properties within Parklands are guided by the Parklands Design
Guidelines (PDG). The main factor determining the housing typology applicable to
the various single residential erven within the area, is the plot size and dimensions.
2.2. It should be noted that the applicable design guidelines do not oppose the
subdivision of any given erf. The guidelines were drawn up to support the Parklands
Township establishment, which was approved in terms of section 42(1) of the Land
Use Planning Ordinance, 15 of 1985.
2.3. The subject erf sizes and site dimensions proposed after subdivision would determine
the residential style of the newly created erven.
2.4. There are no restrictive title conditions preventing the proposed application.
2.5. There is an existing approved building plan for a main and second dwelling built semi-
detached (refer annexure D).
3.1. The applicant’s motivation of the proposed development (see Annexure D) may be
summarised as follows:
4. PUBLIC PARTICIPATION
Applicable Dates / Comments
Notice in the media (s81)
13/08/2019 (closing date 26
Notice to a person (s82)
September 2019)
13/08/2019 (closing date 26
Notice to Community organization (s83)
September 2019)
Advertising
Objection petition
Support / No objection
Comments
No comment submitted within
Ward Councillor response x
allotted timeframe
4.1. Objections / comments received in respect of the application (see Annexure F) may
be summarised as follows:
- Reducing this standard single residential erf into smaller erven will have a
negative impact on the surrounding standard single residential properties.
- No comment received
4.2. Departmental comments received with respect to the application (see annexure F)
4.2.1 Summary of comments (of significance) from internal departments (see Annexure G)
Transport Directorate:
- The proposed condition should be relaxed as it would be awkward to enter
the proposed portion two through a combined driveway for two separate
erven.
- One entrance would also minimize off-street parking for portion two.
- The kerbs in the area are all lowered.
Parklands HOA:
- The building plans have been approved and the units have been completed.
The subdivision is only allowing individual ownership and will thus have no
further impact or change issues that are raised by the Parklands HOA.
5 BACKGROUND TO PROPOSAL
Background
5.2 The specific portion of Parklands surrounding the subject property is mainly residential
in nature. A General Business (GB1) zoned properties is situated further North on Tryall
Road and Trinity Street (erf 6075).
The bulk of the properties surrounding the proposal are developed with dwelling
houses being used for residential purposes.
Property description
5.3 The property is currently developed with an existing main and second dwelling semi-
detached units. The subject property is situated along Trinity Street.
The subject property is easily accessible to the surrounding area as Trinity Street links
Oakland Hills with Tryall Road. Tryall Road intersects with the R27 (West Coast Road),
M14 (Otto du Plessis Drive) and M120.
The subject property is located outside of the demarcated Public Transport (PT)
Zones.
Proposed development
6 PROPOSAL ASSESSMENT
The application complies with the Municipal Spatial Development Framework (MSDF)
as the subject property falls within an area that is identified as the incremental growth
and consolidation areas.
6.1.3 Consideration in terms of Section 99(3) of the desirability of the following criteria:
a. socio-economic impact
- Positive socio-economic impact as the proposed will bring along
additional employment opportunities during the subdivision registration
process and the implementation of the service department conditions,
such as the installation of separate water and electricity metres etc.
e. impact on heritage
- None
h. Conditions that can mitigate an adverse impact of the proposed land use.
- No adverse impacts are expected. The use remains residential. Conditions
have been imposed to mitigate the proposed subdivision (refer annexure A).
6.1.4 Would approval of the application have the effect of granting the property the
development rules of the next subzone within a zone? No.
I am satisfied that the decision making criteria in Section 99(1) have been complied with.
I am satisfied that the considerations in Section 99(3) have been assessed and that the
proposed land use is desirable.
- The Cape Town Spatial Development Framework (CTSDF) property falls within
an area that is identified as the Incremental Growth and Consolidation Areas.
- As a result of the scale of the CTSDF it is not site specific therefore the
Blaauwberg District Plan will be the principle spatial planning document used
in the evaluation of the application. Nevertheless, the following is pointed
out in respect of the CTSDF:
o Incremental Growth and Consolidation Areas are areas where the City is
committed to servicing existing communities and where new
development will be subject to infrastructure capacity.
Section 4.1 addresses the key principle of the Incremental Growth and
Consolidation Areas, which is aimed at servicing existing communities. With the
desired outcomes being to create and address:
The proposal therefore complies with the broader vision and goals of the MSDF
inasmuch as it will allow for improved urban efficiency (through densification) and
accommodating a range of lifestyles by providing a choice of housing types and
tenure options. The proposed increase in densification will lead to better access
to opportunities, the provision of a quality urban environment and a more
compact urban form that will enhance resources efficiency.
- The Blaauwberg District Plan BDP (2012) categorizes the area for ‘urban
development’, which is the prevailing nature of the area.
6.2.2 Applicable policy or strategy approved by the City to guide decision making
The proposal is not in conflict with the criteria contemplated in the DMS related to
SRI zoned properties. The SR1 zoning provides for predominantly single-family
dwelling houses and additional use rights in low to medium-density residential
neighbourhoods, whether these incorporate small or large erven.
The typical dimensions of a Village Style erf are 13m x 25m with a typical erf size of
approximately 325m2 and less. The Village Style erf can be developed with free
standing or semi-detached residential units. The proposed dimension and erf sizes of
the proposed subdivided erven will be generally in accordance with the Village Style
housing units and in accordance with the Parklands Single Residential Design
Guidelines.
6.2.4 Consideration in terms of Section 99(3) of the extent of desirability of the following
criteria:
e. impact on heritage
- None
h. conditions that can mitigate an adverse impact of the proposed land use
- No change in land use is proposed, proposed to remain as SR1 and hence
no adverse impacts are expected. Standard conditions are proposed as
per annexure A.
6.2.5 impact on existing rights (other than the right to be protected against trade
competition)
The impact on the existing rights are negligible, if any. The objector’s main concern
was that by reducing the standard single residential plot into smaller plots such will
have a negative impact on the surrounding Standard Single Residential properties.
The abovementioned reason is in contrast with City policies such as the Densification
Policy that motivates for appropriate densification as well as a variety of erf and
dwelling sizes that should be promoted within any one area. It should also be noted
that a variety of erf sizes are already visible within the immediate area of the subject
property. This further establishes that the proposed erf sizes after subdivision will be in
line with the surrounding erven and the greater Parklands suburb.
Should the subdivision of erf 6145 be approved, it will be a Village Style residence, a
category catered for in the Parklands Single Residential Design Guidelines. The
subdivision of this standard Parklands single residential plot into two smaller plots will
not have a negative impact on the surrounding standard single residential properties.
Smaller erven in the immediate vicinity of the subject property already exists. This
proposal is there for supported by this department.
I am satisfied that the decision making criteria in Section 99(2) have been complied with.
7.1 Reasons for the recommended decision for approval relating to the application for
the subdivision and City approval for development in an overlay zone may be
summarised as follows:
7.1.1 The proposal complies with sections 99(1) and 99(3) of the MPBL as elaborated on
in section 6 of this report.
7.1.2 The proposed increase in density is considered appropriate in the context and
contributes positively to a more compact urban environment and is therefore in
line with the City’s Densification Policy.
7.1.3 The nature and scale of the proposed development is considered compatible with
the character of the surrounding area given its residential nature.
7.1.5 Adequate services capacity exists in the area to support the marginal increase in
density.
8 RECOMMENDATION
8.1 The subdivision of erf 6145, Parklands into two portions be approved in terms of section
98(b)(iii) of the Municipal Planning By-Law, 2015, subject to the conditions contained
in Annexure A.
8.2 City approval to permit development within the Koeberg Restriction Area Overlay
Zoning on erf 6145, Parklands, be granted in terms of section 98 (b) of the Municipal
Planning By-Law, 2015, subject to the conditions contained in Annexure A.
ANNEXURES
__________________________________________________
ANNEXURE A
In this annexure:
“City” means the City of Cape Town
“The owner” means the registered owner of the property
“The property” means ERF 6145, 63 TRINITY STREET, PARKLANDS
“Bylaw” and “Development Management Scheme” has the meaning assigned thereto by the City of Cape Town
Municipal Planning Bylaw, 2015 (as amended)
“Item” refers to the relevant section in the Development Management Scheme (DMS)
“Dir: DM” means Director: Development Management or his/her delegatee.
1.2. City approval to permit a development application in the Koeberg Restriction Area
Overlay Zone as per item 158(3) of the DMS.
DEVELOPMENT MANAGEMENT
2.1. The subdivision shall be in accordance with drawing number VP PARK003/vp, dated
10 April/July 2019, reference SG N/S M3189, attached as per annexure C.
2.3. A previous application was made for a 2nd dwelling for which the DC will be
discounted from the current application. The total amount payable for the
proposed subdivision into two portions in accordance with the DC calculation is
R14 510.60. It must be noted that the amount due will be escalated annually on 1
July with the Construction Price Adjustable Formula using the industry indices of
StatsSA.
2.5. That the subdivided portions shall be provided with individual services connection
for which Engineers Drawings shall be submitted and installed before the issuing of
transfer clearance.
2.6. The subdivided portions shall be serviced through the existing private combined
sewer over which a servitude shall be registered, prior to transfer clearance, in
favour of the adjacent portion being Portion 1;
2.7. The access to the subdivided portions shall be limited to the access positions
indicated on the subdivision diagram (Annexure C);
2.8. Stormwater run-off from the individual portion shall be piped to the road edge and
shall not cross the cadastral boundary of the individual portions.
2.9. All subdivided erven to have separate water and sewer connections;
2.10. Detailed Civil Engineering services plans be submitted to the Engineer for approval,
showing the proposed new sewer and water connections and all services comply
with the "Minimum Standards of Civil Engineering Services in Townships (as
amended) document".
2.13. All internal services are private and will not be taken over by The City of Cape Town.
2.17. That the approved and signed SG diagram for the subdivision be sent to GIS in order
to update the cadastre prior to transfer clearance.
GENERAL:
- The standard conditions as per annexure 1 to be noted.
ANNEXURE 1
In addition to the conditions of approval listed in Annexure A, the following further processes and
standard administrative requirements are to be noted and complied with in full timeously and where
applicable.
1. Generally, the further processes following subdivision / consolidation approval involve the
following sequence of events:
Actual site surveying and preparation of a survey diagram or General Plan by the owner I
applicant's appointed land surveyor
Submission to and approval by the Surveyor General (SG) of the diagram or General Plan
Once services infrastructure has been installed and all conditions of subdivision have been
complied with, upon application, transfer clearance certification issued by City in terms of
Section 137(3) of the City of Cape Town Municipal Planning By-law, 2015 (MPBL)
Once Section 137(3) transfer clearance is issued, upon application, rates clearance
certification issued by the Chief Financial Officer in terms of Section 118 of the Municipal
Systems Act, No 32 of 2000
Supported by the above clearances, conveyancer application to the Registrar of Deeds for
separate registration and/or transfer of newly subdivided portions
Upon individual registration, building plan approval, followed by construction, subsequent
building completion certification by the City and eventual occupation
2. Kindly note, the subdivision approval in the accompanying decision letter will lapse unless
separate registration of at least one land unit is effected in the Deed's office within 5 years of
the date of the City's final notification letter of this approval (which letter will follow in due
course), unless extension of the validity thereof has been granted in terms of Section 107 of the
MPBL prior to such lapsing.
3. After final notification of this subdivision / consolidation approval, the SG will require
preparation of a diagram or General Plan (illustrating any servitudes where applicable) of the
newly created land unit(s) for its approval. Such diagram or General Plan is to be prepared by
a land surveyor appointed by the owner / applicant. The owner / applicant or their surveyor is
required to liaise directly with the SG in this regard. Upon approval thereof, the SG will indicate
by means of an endorsement the date and reference number of this subdivision/consolidation
approval on the back of the diagram(s) of the newly created erven or on the front of the
General Plan, whichever are applicable.
4. Once the diagram(s) or a General Plan has been approved by the SG an electronic copy
thereof must be e-mailed to the GIS technician for the district Planning office where the
approval was issued at the relevant address reflected below as well as the Cadastral unit at
[email protected]. Proof of such e-mail transmission must accompany
any transfer clearance application or building plan submission to the Development
Management Department, whichever may occur first.
5. Once the diagram(s) or a General Plan has been approved by the SG and all the conditions of
subdivision have been met by the developer, application may be made by the owner (or his
appointed conveyancing attorney) to the Director: Development Management at your
nearest district Planning office for transfer clearance certification in terms of Section 137 of the
(MPBL). Such application must be accompanied by the following:
Where servitudes are to be created as part of the subdivision / consolidation or there is a requirement
for an owners' association to be established, of which new owners are required to be members, a copy
of the draft power of attorney to pass registration / transfer must be submitted to the Director:
Development Management as part of the above application.
6. Required to effect registration and/or transfer, a rates clearance certificate in terms of Section
118 of the Municipal Systems Act, No. 32 of 2000 may only be applied for to the Chief Financial
Officer once the Director: Development Management has certified that all conditions of
subdivision have been complied with to its satisfaction, as per the foregoing paragraphs. Such
applications for rates clearance certificates must therefore be accompanied by the above
subdivision clearance (condition compliance) certificate in terms of Section 137 of the (MPBL).
7. The Registrar of Deeds will not permit registration of individual portion(s) or servitude area(s)
and/or transfer of such new land unit(s) unless the Chief Financial Officer has issued the above
rates clearance certificate in terms of Section 118 of the Municipal Systems Act, No 32 of 2000
in respect of such land unit(s).
8. The General Plan / Diagram of the approved subdivision / consolidation in PDF format must
include the following information:
property boundaries
co-ordinates
parent erf number(s)
newly allocated erf number(s)
extent of all erven
approved street name(s), including whether public or private
9. The following is to be noted in respect of all public roads and places resulting from the
subdivision:
All newly created public roads (including road splays where relevant) and places to vest in the
City in terms of Section 58(1) of the MPBL must be clearly defined, be provided with separate
portion / erf numbers (and not indicated as remainders) and be indicated as such on the SG
approved diagram or General Plan.
All such public roads and places are to be registered as individual portions and transferred to
the City upon transfer of the first unit / erf in the subdivision or phase concerned, the cost of
surveying, registration and transfer of which shall be borne by the applicant.
10. The above electronic data must be delivered (preferably by e-mail to the address supplied
above) to the GIS technician for the district Planning office where the subdivision /
consolidation approval was issued in standard PDF format.
11. Kindly note, building plan applications will not be accepted by the Development
Management Department (Building Control office) if the above electronic data has not been
submitted to the SG office and such office approved the new or amended diagrams. The
City's cadastre layer is only updated after the SG office approved the diagram and provided if
to the City.
12. Except where construction of buildings on unregistered land units for good reason are
specifically provided for in the conditions of approval, it is to be noted that building plan
applications will not be approved before:
13. Notwithstanding the above and upon proper motivation, application may be made in terms of
Section 55(4)(b) of the MPBL to the Director : Development Management for the
commencement of construction on unregistered subdivided portions prior to confirmation of a
subdivision or registration of individual portions (e.g. development of show units), if the
conditions of approval made specific allowance for this (but subject to submission of an
approved SG diagram or General Plan in the case of show units).
allow any service relating to the approval of the subdivision to be conveyed across or installed
on the land unit in the manner and position that the City or organs of state from time to time
reasonably requires. The services include gas mains, electricity infrastructure, telephone cables,
television cables, internet cables, other electronic infrastructure, main and other water pipes,
sewers, stormwater pipes, ditches and channels, and surface installations such as mini
substations, meter kiosks and service pillars; and
allow access to the works and infrastructure contemplated above on the land unit at any
reasonable time including for the purpose of constructing, altering, repairing, maintaining,
removing or inspecting the works; and
receive such material or permit such excavation on the land unit as may be required to allow
use of the full width of an abutting street and provide a safe and proper slope to its bank
necessitated by differences between the level of the street as finally constructed and the level
of the land unit unless the owner elects to build retaining walls to the satisfaction of and within
a period determined by the City.
15. Where the City of Cape Town is not the electricity service provider, it remains the duty of the
developer / owner to timeously liaise directly with the relevant service provider for connection
to the power grid.
Allotment: Suburb:
1:9 600
Petition
Signatory
Objections
Received
Generated by:
File Reference:
4365MANAGEMENT
PLANNING AND BUILDING DEVELOPMENT
LOCALITY MAP
ANNEXURE : B2
Allotment: Suburb:
1:2 400
Petition
Signatory
Objections
Received
Generated by:
File Reference:
4366
ZONING MAP
Planning and Building Development Management
ANNEXURE : B3
Zoning Legend
Erf: Allotment:
Generated by:
File Reference:
4367
PLAN OF PROPOSED SUBDIVISION ANNEXURE C:
OF ERF 6145 PARKLANDS Subdivision Plan
SITUATE IN THE CITY OF CAPE TOWN, ADMINISTRATIVE DISTRICT OF THE CAPE
ERF 6144
S
B
5,15
T R IN IT Y
#63A wm S
30,09 C
A
y
7,28
1 d r iv e w a
ST R E E T
ERF 6133 Portion
331 Sq m
9,43
T N
3 0 ,3 5
1 3m
wm
9,60
Portion
2 d r iv e w a y
9,60
291 Sq m #63B
ERF 6132 D
3 0 ,2 4
E
SCALE 1:500
ERF 6146
LEGEND
S
SEWER MANHOLE
ELECTRIC LIGHT POLE
ELECTRICITY CONNECTION
CATCHPIT
wm WATER METER
N o t e s:
1. The figure A B C D E represents Erf 6145 Parklands, situate in the City of Cape Town, Administrative
District of the Cape, Province of the Western Cape, as represented on General Plan SG No. 285/2012
2. OWNER : PINKIE ANGEL KHOLONG
3. Title Deed No. T 64846/2015
4. All measurements are in metres
5. All distances are approximate and are subject to final survey
6. represents a party wall
CAPE GEOMATICS
Professional Land Surveyors
Precise Engineering Surveyors
High Density Laser Scanning Specialists
P.O. Box 334, Parow, 7499
Tel: 0833 257 257 Fax: 0866 206 546
e-mail: v alen [email protected]
Date: 10 April 2019/ July 2019
FILE REC
MEMO
4368
ANNEXURE D: NOTES:
110Ø Soil Vent Pipe 110Ø Soil Vent Pipe
wc whb b sh wc whb b sh
Double roman cement tiles in
17.50°
3° pitch Written dimensions should be used in preferrence to scaling the drawings. All work to be carried out
230
re1 in strict accordance with the drawings. Any discrepancies or incorrect information detected on the
NGL to municipal IBR roof sheeting
Boundary Line
drawing should be reported to the Architect prior to construction. Should any portion of the drawing
Boundary Line
150Ø uPVC soilpipe connection 300 @ 3° pitch be unclear or contain insufficient information for construction it should be reported to the Architect
ie2 MH
ie3 immediately. Drainage connection point and levels to be verified by the plumbing contractor before
17.50°
17.50°
Backyard Backyard commencement of any work.
COVER 10 000 10 000 9 925
Plastered & painted Roof Construction (house):
INVERT 9 550 9 380 8 925 1,8m high Double roman profile cement tiles in charcoal colour at 17.5° pitch on underlay on 38x38mm battens
pc walling at 320mm centers with headlap, on trusses at 760mm centers, on 114x38mm timber wallplate. All
DEPTH 450 620 1 000 17.50° 17.50° GARAGE GARAGE roofing to be designed by roofing specialist and to be tied down with galvanized hoop-iron strapping
2700
DIST. 5 900 15 000
2600
1 2 at 300mm deep into the brickwork. Aluminium gutters and downpipes to discharge to storm water
2400
2400
W2 D2 pipes and taken to on-site soakaways as shown on plan. 300mm Overhang. All roofing to be
FALL 1:33 Screed W1 Screed
1800
waterproofed by specialist.
10150 10150
DRAINAGE SECTION 1 NGL 10000 10000 10000 Roof construction (garage):
IBR long span single length roof sheeting in grey colour at 3° pitch on 228x50mm rafters at
Specified floor finish on 25mm screed on NGL 600mm centers with head wall side wall and side lap flashing. All waterproofing to be
17.50°
City of Cape Town Stamp 100mm conc. slab on DPM on 50mm managed by a specialist.
110Ø Soil Vent Pipe 110Ø Soil Vent Pipe clean sand blinding on well compacted
earthfill - foundation depth to be Walls:
wc whb b sh wc whb b sh dw s dw s wm 700x230mm Concrete determined on site 700x230mm Concrete
External and internal SABS approved cement block - 400x200x180 solid walls. External walls to
17.50° Foundations Foundations
17.50° have stepped dpc's at floor level and around all openings. Weepholes @ 1200mm c/c to all stepped
0 1m 2m 3m 4m 5m dpc's. Prestressed concrete lintols over all openings in brickwork where no rc beams are specified
TOC with minimum of 4 courses of brickwork over.
17.50°
230
Scale 1:100 NGL re4 re7 g
to municipal SECTION A-A ALL FLASHING, COUNTER
FLASHING AND
Chimney:
Chimneys to be min. 1000mm above roof pitch and flashed with acrylic flashing and counter
ie5 150Ø uPVC soilpipe connection WATERPROOFING TO BE flashing.
ie6 ie8 ie9
MH 1 : 100 DONE BY SPECIALIST
Ceilings:
17.50°
COVER 10 000 10 000 10 000 10 000 9 925 17.50° 6.5mm Skimmed rhinoboard ceiling on 38x38mm brandering at 450mm centers fixed to underside
Double roman cement tiles in
charcoal colour @ 17,5° pitch of rafters (to man. specs.)
INVERT 9 550 9 453 9 203 9 013 8 925
Boundary Line
17.50°
17.50°
DEPTH 450 574 797 987 1 000 Skimmed rhinoboard ceiling Floor Construction:
SA Pine skirting on specified floor covering on 25mm screed on 100mm concrete slab on SABS
DIST. 5 900 15 000 11 400 5 300 approved 275 micron DPM on 50mm clean sand blinding on well compacted earth fill.
3.00° 300
FALL 1:60 3.00°
Close Cavities:
All cavities to be closed min. 3 courses below wall plates. Hoop-iron for fixing roof to go through
DRAINAGE SECTION 2 closure and to locate 7 to 10 courses below wall plate level alternatively.
2800
1500 4095 8040 4065 1330 Plastered & painted doors in timber (to be patterned 40mm hollow core) lighting and ventilation to comply with local
W9 Plastered Tiles Tiles authority requirements. DPC to be wrapped around all window and door openings.
Tiles Tiles
2330
& painted
1800
200 3695 200 3905 200 3935 200 3665 200 Precast Lintols:
900
10150 10230 10150 To be laid to manufacturer's specification to all openings >900mm. All openings >3000mm to have
1150 1800 1890 2400 1720 2400 1890 1800 1150 10000 10000
windows & openings
NGL NGL min. 4 courses brickwork with brickforce to each course.
1,8m high PARKLANDS FFL 10.000 FFL 10.000 walling Concrete Foundation 2. All plumbing pipes to be concealed.
pc walling 1,5m Building Line
dp dp 3. External steps max. risers 180mm, min. treads 250mm.
sump sump 1 : 200 4. Expansion joints to be provided to boundary walling at max. 5000mm centers.
swp Step Step swp
SECTION B-B 5. Light switches to be 1200mm above f.f.l unless otherwise shown.
200
200
200
200
1,8m high pc 6. Wall sockets to be 400mm above f.f.l unless otherwise shown.
1,5m Building
D3 walling D4 7. WM and DW waste to be min. 600mm above FFL
1 : 100
800
1030
W8 8. Supply and waste to w/m and DW to be in 90mm deep recess. Stopcock to be above counter.
1890
Line
1 4
3310
tv tv TO BE DONE BY
200 1050 200
12. No foundation or any portion of the building to extend over the site boundary.
Boundary Line
Boundary Line
4930
5080
charcoal colour @ 17,5° pitch 13. All timber built into brickwork to be wrapped in DPC.
17.50°
900 200 fall fall 1500 200 1965 120mm Plaster band around 14. Provide 1000mm high aluminium balustrades with max. 100mm openings to all balconies &
300mm OVERHANG front elevation doors & windows staircases.
200
300 15. 40mm 1/2 hr fire rated door to be provided between the garage and the dwelling.
200
TERRACE TERRACE
3630
1.8m bic
16. Doors & sidelights to be glazed with safety glazing.
200
FFL 10.150 FFL 10.150 18. Plumber to provide min. class 1 copper water pipes to building.
EN-SUITE EN-SUITE 19. Rhioboard ceilings fixed to 38x38mm brandering to u/s of concrete slab to be provided to all
re1 1 2 re4
3290
ceilings.
3.1m bic
D8 D9
3100
900
600
W7 Tiles Tiles W10
200
1.8m bic
D5 D6 svp
ie2 svp ie5
W2
D2
1970
1820
W1
200
200
tap Party wall: To be tap
built up to u/s of 10.000
swp
16650
wall) W11
16850
W6
5
3260
tv tv
3260
200
[30 090]
ERF 6146
Boundary Line
Boundary Line
BATHROOM BATHROOM
17.50°
200x200mm Chandelier
23580
svp
900
900
660 200
ERF 6146
Pendant 300
linen
linen
200
tel
Brickpaving
2120
2120
YARD
2.8m bic Distribution board Plastered & painted Plastered & painted
1,2m
200 1965 Watertight power point
1,2m
BEDROOM BEDROOM Single power point
KITCHEN
3320
3320
1200
1200
W4 2 1800mm
6
W3 D4 D6 D5 D3
KITCHEN Tiles 1m (h) Double power point 1,2m
sump
Carpet
dp &
Tiles Carpet
Brickpaving Double power point 10.000
dw NGL
1180
high wall
1,8m high block walling
D10 wm
swp
900
6930
Boundary Line
17.50°
5203
swp
GARAGE 390x590mm Pier light positions refer to specialist. Double roman cement tiles in
No roof over
5300
1
5110
300
Screed GARAGE AREAS: DRAWN: Tiaan Moggee
A A UNIT 1 UNIT 2
FFL 10.150 2
sump
sump
D8
4880x2150mm tip up door with pcl over D7 COV. PATIO 1m² 0m² SIGNATURE(S):
146m² 155m²
200
Driveway
Brickpaving
EAST ELEVATION PROPOSED NEW HOUSE FOR
2410
[5 150] NOTE:
[16 880]
swp
Boundary Line
MID-DAY
SABS APPROVED
17.50°
SUN CWC "STUMBEL BLOC" USED
N FOR ALL WALLING Double roman cement tiles in
5500 charcoal colour @ 17,5° pitch
PR
300
W AILI DS
EV WI
IN NG
TE
R
N
200 695 200 3000 200 2416 200 1089 200 1090 200 2645 200 2655 200 810 200
W
S
NG R
1800
1800
3% fall from top of kerb
2000
Existing tar FGL
NGL
FALL 450x450x600mm
700x230mm Conc. Conc. Foundation not
Foundation not to to project over
project over boundry boundry
Plan of rollover kerb CWC - CK5 Elevation of rollover kerb CWC - CK5
Section Through Block Wall Section Through PC Wall
Kerb Section Detail Scale 1:100 Scale 1:100 Scale 1:100
Scale 1:100
Scale 1:50
City of Cape Town Stamp
900 900 875 925 875 925 1175 1225 1175 1225 900 2440 4880 900
WINDOW
HEAD
2100mm
fixed
glazing
2120
fixed fixed fixed fixed
glazing glazing glazing glazing
FFL
D1 D2 D3 D4 D5 D6 D7 D8 D9 D10
ENTRY ENTRY BEDROOM 1 BEDROOM 4 LIVING LIVING GARAGE GARAGE GARAGE GARAGE
ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM
CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS NORTH FACADE SOUTH FACADE SOUTH FACADE WEST FACADE
SOUTH FACADE SOUTH FACADE NORTH FACADE NORTH FACADE NORTH FACADE NORTH FACADE
450
NOTE: 2.1 17/03/2017 Garage on the right re-postioned
750
750
750
[3 413 KWH (50%) - to be provided with solar/heat pump as per SANS XA/201]
900
900
450
Proposed Instillation:
1500
1500
1500
glazing fixed glazing
1800
glazing fixed fixed fixed • 200L Solar Geyser with 2KW Backup Electric element. Collector to be 2.5m2
750
750
750
glazing glazing glazing • Solar useful energy rating (KWH/m2) per day = 4.19
NOTE: • Annual solar energy available for a 2.5m2 Solar collector (KWH) = 3823.375
Brickwork openings sizes
1200
1200
• Solar Energy 3823 KWH > 3413 KWH (50% of required consumption)
to be checked by window • Outstanding energy to be provided by 2KW electric geyser
specialist before
600
600
600
manufacturing special • Kwiksol solar panel efficiency
300
- -
TOTAL AREA 300m2 301m²
322 29.9
450
450
600
600
Resultant materials:
750
900
900
- Single Clear glass (5.8W/m² and SHGC=0,8 as per "Glass Warehouse" specifications)
fixed fixed fixed
450
450
450
1500
1800
fixed south elevation doors & Total fenestration DOES NOT exceeds maximum deemed to satisfy value of 15% of nett floor area, but remains within the SANS
750
1200
1200
1200
VALUE:
300
300
FFL
NETT FLOOR AREA (EXCL. STORE, GARAGES) 173m² - New Building
W7 W8 W9 W10 W11 W12
EN-SUITE 1 BEDROOM 1 BEDROOM 4 EN-SUITE 2 BEDROOM 5 BATHROOM 2 ROOF INSULATION 3.7 R factor=3.35
ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM -less 0.35(Roofing and plasterboard)
CLEAR GLASS CLEAR GLASS CLEAR GLASS EAST FACADE CLEAR GLASS CLEAR GLASS -less 135mm Cellulose fibre Loose-fill
WEST FACADE EAST FACADE WEST FACADE EAST FACADE EAST FACADE insulation to ceiling space DATE OF SCALE : REVISION :
=(deemed to satisfy)
COMPLETION : As
01/25/17 2.1
HOT WATER AND PIPE INSULATION: -Neoprene insulation to be used indicated
WINDOW SCHEDULE -50% hot water generation by alternate source (heat pumps/solar geyser)
-Insulated hot water piping to conform to SANS 204
-Fit water saving nozzles to all showers
SHEET : MODIFIED DATE : DRAWING No :
1 : 50
LIGHTING:
-Lighting to be max 5w per sq/m as per SANS 204
-LED Energy saving lights to be used 2 of 2 21/03/2017 16 - 84
ANNEXURE E:
4370 Applicant's motivation
MOTIVATION IN TERMS OF SECTION 52
OF CAPE TOWN MUNICIPAL BY LAW
1. BACKGROUND
Parklands is an existing township, established and approved in terms of the City of Cape Town
Municipal Planning By-Law 2015. Erf 6145 Parklands is situated on No. 63 Trinity Street, Parklands.
The property is fully developed. The approved building plans are attached in this application. The
structure has only recently been completed and no further changes will be made. No other
applications to council have been submitted, with regards to this erf.
2. PHYSICAL CHARACTERISTICS
Erf 6145 Parklands has a fully developed, single-storey, brick and mortar, semi-detached, double-
dwelling on the property, and surrounding grounds for a conservatively sized garden. The
surrounding properties are all developed with structures of similar size. The land is relatively flat and
the vegetation is low and young. This part of Parklands is very newly developed and the vegetation
is not at all well-established. As in many parts of Cape Town, manicured gardens are a thing of the
past with many gardens, side-walks and public areas looking very sad.
Trinity Street easily joins one of the major transport spines in Parklands: Sandown Road, and other
major transport routes beyond that. Since the entire neighbourhood is fully developed, all the roads
and services are completed, thus the danger of flooding is minimal. The area being new, the
infrastructure is modern enough to cater for this eventuality.
Ecologically, this area has no flora or fauna that would need consideration or protection. The
subdivision of this property into two, independent, residential, free-hold erven, is both realistic and
recommended. There is always a high demand for smaller, more manageable properties in any
neighbourhood.
3. DEVELOPMENT PROPOSAL
The proposed development simply extends the flexibility of title from single title and tenant, to
separate title with autonomy. The buildings will not be altered in any way further; the subdivision will
create a boundary through the building as a party wall servitude, as on the approved building plans,
attached. Each portion has its own driveway and enough surrounding grounds for a manageable,
small garden.
This application fully complies with the Parklands Home Owners Association Design Guidelines and
in terms of Section 99(1) of the Municipal Planning By-Law, as well as the Municipal Spatial
Development Framework, it complies with all aspects of an existing residential township where
densification, land use and services are already decided and adhered to. The zoning is SR1 and will
stay SR1 after the subdivision. One land parcel will become two as has been done at No. 6 to No. 24
Holborn Crescent, around the corner.
In terms of Section 99(2) of the Municipal Planning By-Law, this application fully complies with the
Cape Town Municipal Spatial Development Framework, as Parklands is an existing township,
catering for the desired densification in the area.
4. DESIRABILITY
a) Socio-economic impact:
This development creates an extra two dwellings in this economically well sought-after
neighbourhood. It has filled a gap of vacant land and helps to complete the neighbourhood.
e) Impact on heritage:
The properties do not fall within a heritage overlay zone.
The proposed subdivision complies with both the By-Law’s and the Parklands Home Owners
Association Design Guidelines intention and scope of reasonable incremental densification.
This property falls within the Koeberg Restriction Overlay Zone, and more specifically Section 158
(1)(b) “Urgent Protective Action Zone (UPZ)”, within 16km radius of the Koeberg Nuclear Power
Station.
The densification in the areas is already ascertained and implemented according to the Zoning
Regulations which together with the Parklands Home Owners Association Guidelines, allow for
subdivision into this sought “Village Style” Residential Development. The road infrastructure is
modern and accommodates the required evacuation, to the satisfaction of the Koeberg Nuclear
Emergency Plan.
In the unforeseen and unlikely event of nuclear emergency, Parklands is positioned in a lower
restricted area, where both the winter prevailing North-Wester and the summer prevailing South-
Easter, will carry toxic elements away from Parklands.
The title deed of Erf 6243 Parklands does not prohibit it from being sub-divided. See attached
conveyancer’s certificate, confirming that there are no title restrictions.
It is hereby requested that consolidation in terms of Section 52 of the Cape Town Municipal By-Law
2015 be granted, and any other applicable legislation.
July 2019
…………………………………….
V. PAPANICOLAOU (PLS 891D)
Our ref: PARK003
ANNEXURE F:
4372
Objection
PARKLANDSHOMEOWNERSASSOCIATION
P.O.BOX60538TABLEVIEW7441
TEL: 5566768/ FAX: 5562589
Emailaddress: [email protected]
2019-08-26
TheCityManager
Planning
andBuildingDevelopment
Management
POBox35
MILNERTON
7435 Attention:
JodiFullard
DearSir/Madam
Re:PROPOSED
SUBDIVISION
ANDCITYAPPROVAL:
ERF6145,63 TRtNtTySTREET.
PARKLANDS
Yourletterdated13August2019application
number70457312
regarding
theabove
mentioned aoolication
refers.
Thisapplication
was discussedwiththe trusteesof the ParklandsHomeownersAssociation
(PHOA)at theirmeetingheldon 20 August2019.
Parklands
HomeOwnersAssociation
4373
ANNEXURE G
Departmental comments
4374
4375
4376
SPATIAL PLANNING
AND ENVIRONMENT
MEMORANDUM
To : Development Management
Date : 12-08-2019
1. That Portion 1 as per the subdivision proposal plan be allocated a physical street address of:
63A Trinity Street.
2. That Portion 2 as per the subdivision proposal plan be allocated a physical street address of:
63 Trinity Street.
3. That the approved and signed SG diagram for the subdivision be sent to GIS in order to
update the cadastre.
Kind Regards
Chantel Erlank
Administrative Officer 1
Application for Subdivision for Erf 6145, Parklands is Supported by the Director: Solid Waste Management
(DSWM) Subject Following Conditions Listed Below:
Please ensure that refuse bins are placed outside on the scheduled day of refuse removal to the nearest
access Road for a Kerbside (Sidewalk) Refuse Removal Service.
Please Refer to Paragraph (1) listed below referring to Subdivision to enable refuse removal services.
1) Should the owner/s make alterations or additions to the Residential Property or Subdivide the
Property into 2 or more portions for Residential Purposes and require Additional Refuse Containers
/ Bins, the owner/s must liaise with the Corporate Call Centre for Solid Waste Management
Enquiries on 086 010 3089 to make the necessary arrangements. The owner/tenants are required
to Place the Refuse bin/s on their nearest access Road – the Kerbside (Sidewalk) of a Public Street
on the Scheduled Day of Refuse Collection.
Solid Waste Conditions must be clearly stated with the Attached “Annexure A” forms to avoid delays with the
clearances given by Solid Waste Management.
Yours Faithfully,
Chantel Erlank
For: The Director: Solid Waste Management
Nazier Samodien
SPO: TIA & DC
DATE 2019-09-03
TO J Fullard
CASE NO 70457312: PROPOSED SUBDIVISION AND CITY APPROVAL: ERF 6145, 63 TRINITY STREET,
PARKLANDS
Application
Subdivision into two portions;
City approval/consent required in terms of the Koeberg Density Overlay zone to
permit additional use rights.
Comment:
This branch does not condone the proposed cwc’s on the subdivision plan
The cwc’s do not meet the minimum spacing as intended with the DMS
The subdivision plan cwc’s do not coincide with the building plan.
Recommendations:
Yours sincerely
Nazier Samodien
[email protected]
Enquiries:
[email protected]
1. Eskom services are affected by your proposed works and the following must be noted:.
a) Eskom has no objection to the proposed work and include a drawing indicating Eskom
11kV/LV underground services in close proximity.
b) Please note that underground services indicated are only approximate and the onus is on
the applicant to verify its location.
c) There may be LV overhead services / connections not indicated on this drawing.
d) The successful contractor must apply for the necessary agreement forms and additional
cable information not indicated on included drawing, in order to start construction.
Include Eskom Wayleave as-built drawings and all documentation, when applying for
Working Permit.
Should it be necessary to move, relocate or support any existing services for possible future
needs, it will be at the developer’s cost. Application for relocating services must be made to Sabelo
Potela on 084 745 8990 / [email protected].
a) No work or no machinery nearer than the following distances from the conductors:
4. NOTE
Wayleaves, Indemnity form (working permit) and all as-built drawings issued by Eskom to be kept
on site at all times during construction period.
Yours faithfully
Herewith our approval with reference to water and sanitation: to the following conditions.
CONDITIONS
Contact Person:
E-MAIL: [email protected]
4384
ANNEXURE H:
4385to objection
Response
Professional Land Surveyors
Precise Engineering Surveyors
Town & Regional Planners
Sectional Title Consultants
High Density Laser Scanning Specialists
P O Box 334, Parow, 7499 ● Telephone: 021 531 2351● 0833 257 257 ● Fax: 0866 206 546 ● [email protected]
With reference to your correspondence dated 16 October 2019 in connection with the above
application, I thank you for the responses from the various applicable departments. I hereby
provide my response, to only two of the departments; those which have an objection to this
application.
Yours sincerely
_________________________________
V Papanicolaou PLS0891D