0% found this document useful (0 votes)
25 views4 pages

Sen Imp

The document provides a collection of past year questions from chapters in Software Engineering. It includes 2 mark, 4 mark and 6 mark questions related to topics like software development process, software requirement engineering, software modeling and design, software project estimation, and software quality assurance and security. The questions cover key concepts, principles, models and diagrams related to each chapter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views4 pages

Sen Imp

The document provides a collection of past year questions from chapters in Software Engineering. It includes 2 mark, 4 mark and 6 mark questions related to topics like software development process, software requirement engineering, software modeling and design, software project estimation, and software quality assurance and security. The questions cover key concepts, principles, models and diagrams related to each chapter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

----SEN IMP----

(Note: The questions below are considered according to the PYQ's of last four years only...)

Chap 1:-SOFTWARE DEVELOPMENT PROCESS

****2 Marks Questions****

1. Enlist and explain software characteristics (any two). (S-19),(W-19),(W-22)


2. Define software on engineering. (S-19)
3. Define software. Draw the failure curve for Software. (W-19)
4. List any four types of software. (S-22)
5. List any four selection criteria for Software Process Model. (S-22)
6. Define :– i) Software ii) Software Engineering (W-22)

****4 Marks Questions****

1. Explain Software Engineering as layered technology approach. (S-19),(S-22)


2. Distinguish between perspective process model and agile process model. (S-19)
3. Describe extreme programming with proper diagram (S-19)
4. State and explain with examples four broad categories of software. (W-19)
5. Explain process framework with a suitable diagram. (W-19)
6. Explain waterfall process model. State its advantages and disadvantages. (W-19)
7. Explain Waterfall Model with neat labeled diagram. (S-22)
8. State and describe any four types of Software. (W-22)
9. Distinguish between waterfall model and spiral model. (W-22)
10. Explain Dynamic Systems Development Method (DSDM). (W-22)

****6 Marks Questions****

1. Explain software process framework with neat labelled diagram and also describe software
process framework activities. (S-22)

Chap 2:- SOFTWARE REQUIREMENT ENGG.

****2 Marks Questions****

1. State need of software requirement specification (SRS). (S-19)


2. Define software requirements specifications. (W-19)
3. List any four planning principles. (S-22)
4. State the characteristics of SRS. (W-22)

****4 Marks Questions****

1. Describe any four principles of communication for software engineering. (S-19)


2. List and explain any four “core principles” of software engineering. (S-19), (S-22)
3. Describe four principles of good planning. (W-19)
4. Enlist core principles of Software engineering practice. (W-19)
5. State and describe any four deployment principles. (S-22)
6. State the need of SRS and also enlist the characteristics. (S-22)
7. Describe any four Software analysis modeling principles. (W-22)
8. State software engineering practices and its importance. (W-22)

R.S fan (IG)kartixk.45 Page 1


****6 Marks Questions****

1. Enlist Requirement Gathering and Analysis for web based project for registering candidates
for contest (any six points). (S-19)

2. Identify and enlist requirement for given modules of employee management software:
(i) Employee detail (ii) Employee salary (iii) Employee performance. (S-19)
3. Sketch a use case diagram for library management system with minimum four use cases and
two actors. (W-19)
4. Explain six functions of requirement engineering process. (W-19)
5. State and describe any six communication principles. (S-22)
6. Sketch use-case diagram for Library management with minimum four use cases and two
actors. (W-22)
7. Recognize requirement for following modules of hospital management software(W-22)

i) Customer module ii) Administrator module iii) Account module

Chap 3:-SOFTWARE MODELLING AND DESIGN

****2 Marks Questions****

1. Describe following design concepts (S-22)


i) Abstraction
ii) Information hiding.

****4 Marks Questions****

1. Explain with example Decision table. (S-19)


2. Draw proper labeled “LEVEL I Data Flow Diagram” (DFD) for student
attendance system. (S-19)
3. Explain the notations used for preparing a Data Flow diagram. (W-19)
4. Draw and explain Level 0 Level 1 DFD for railway reservation system. (W-19),(W-22)
5. Explain Test Documentation with the help of following terms. (S-22)
i)Test Case ii) Test Data iii) Test Plan.
6. Draw DFD 0 and DFD 1 diagram for Library Management System. (S-22)
7. Distinguish between Black Box and White Box testing. (Write any four points). (S-22)
8. Explain structured flowchart with suitable example. (W-22)

****6 Marks Questions****

1. Differentiate between White box and Black box testing (any six points). (S-19),(W-22)
2. Draw and explain Transition diagram from requirement model to design model. (S-19),(S-22),(W-22)
3. Explain the concept of Black box testing and white box testing. (W-19)
4. Define data objects, attributes, relationship, cardinality with example of each. (W-19)

R.S fan (IG)kartixk.45 Page 2


Chap 4:- SOFTWARE PROJECT ESTIMATION

****2 Marks Questions****

1. Define Reactive Risk strategies. (S-19)


2. Specify following cost directives of cocomo: (S-19)
(i) Product attributes (any two)
(ii) Hardware attributes (any two).
3. Define Proactive and Reactive risk strategy. (W-19)
4. Name two cost estimation approaches. (W-19)
5. List 4P’s of Management spectrum. (S-22)
6. Define project Cost Estimation. (S-22)
7. List the project cost Estimation Approaches. (W-22)
8. Define risk and list any two types of risk. (W-22)

****4 Marks Questions****


1. Explain following elements of management spectrum: (S-19),(W-22)
(i) People (ii) Process
(iii) Product (iv) Project
2. State importance of “Function Point (FP)” and “Lines of codes (LOC)” in concerned with
project estimation. (S-19)
3. Explain RMMM plan with example. (S-19)
4. Explain any one project cost estimation approach. (S-19)
5. Describe 4 ‘P’s of management spectrum giving their significance. (W-19)
6. With an example, explain Line of Code (LOC) based estimation. (W-19)
7. Describe RMMM Strategy. (W-19),(S-22)
8. Describe the Analytical method of project cost estimation with example. (W-19)
9. State and describe two metrics of project size estimation. (S-22)
10. Explain line of code metrics for size estimation. (W-22)
11. State and explain the component of Risk Management. (W-22)
12. Describe following project cost estimation approaches :–
13. i) Heuristic ii) Empirical (W-22)

****6 Marks Questions****

1. Describe Co-Como II model for evaluating size of software project with any three
parameters in detail. (S-19)
2. Calculate using COCOMO model
(i) Effort (ii) Project duration (iii) Average staff size
if estimated size of project is 200 KLOC using organic mode.
3. Describe following project cost estimation approaches.
i) Heuristic ii) Analytical iii) Empirical
4. Use COCOMO model to calculate. (S-22)
i) Effort ii) Development Time
iii) Average staff size iv) Productivity
if estimated size of project is 400 KLOC using embedded mode.
5. Describe a Cocomo and Cocomo-II models. (W-22)

Chap 5:- SOFTWARE QUALITY ASSURANCE AND SECURITY

****2 Marks Questions****

1. Differentiate between Software Quality Management and Software Quality Assurance (any two
points). (S-19)
2. Define Software Quality Assurance. (S-19)

R.S fan (IG)kartixk.45 Page 3


3. Define software quality. (W-19)
4. Name four software quality assurance activities. (W-19)
5. Define Quality Control and Quality Assurance. (S-22),(W-22)
6. List the phases of Software Quality Assurance. (W-22)

****4 Marks Questions****

1. List and explain basic principles of project scheduling.(any four) (S-19),(W-19),(S-22)


2. Prepare time line chart for Library Managements System (five days a week).
Consider phases of SDLC. (S-19)
3. Explain GANTT chart and its application for project tracking with an example. (W-19)
4. Explain CMMI in detail with neat diagram. (S-22)
5. Prepare Macro Timeline chart for 20 days of Hotel Management system (6 days a week)
consider broad phase of SDLC. (S-22)
6. Describe critical path method with suitable example. (W-22)
7. Prepare macro time line chart for 15 days of college management system (5 days a week)
consider phases of SDLC. (W-22)

****6 Marks Questions****

1. Describe CMMI. Give significance of each level. (S-19)


2. Compare CMMI and ISO for software w.r.to (W-19)
i) Scope ii) Approach iii) Implementation.
3. Describe six Sigma Strategy in details. (S-22)
4. Explain CMMI Techniques with its level. (W-22)

R.S fan (IG)kartixk.45 Page 4

You might also like