Dear Sir,
Referring to your inquiry regarding Lightning Protection System We are pleased to submit our prices
under reference # CXE-QN-23-228 dated May 01, 2023.
Quotation
General terms & conditions
Your early response in this matter would be highly appreciated. If any further information / clarification are
required in this regard, we will be happy to be of assistance to you.
Yours Truly,
Phone: +92 42-35446195/ 35180653 | fax: +92 42-35181114 | 32-A/2, P.G.E.C.H.S, Lahore, Pakistan. |
Lightning Protection System BOQ
Unit Price Total Price
Sr. # Description Model Units Qty
PKR PKR
1 DAT CONTROLER® PLUS 60-ESE Air Terminal AT-1560 Nos 1 445,000 445,000
2 Brass adap.pieceM20. 1½''mast+cable/tape AT-011A Nos 1 21,500 21,500
5 Naval brass tape and cable square clamp AT-020F Nos 1 8,900 8,900
9 Naval brass cable + tape parallel clamp AT-011F Nos 03 6,800 20,400
11 235x40x25mm bonding bar for earth pit AT-020H Nos 02 19,500 39,000
12 Naval brass clamp for cable/tape + rod AT-090H Nos 06 5,600 33,600
13 ø5/8''x3m thrd 254µ Cu-bond earth rod AT-041H Nos 06 9,500 57,000
14 CONDUCTIVER PLUS (Gel) AT-010L Nos 02 22,500 45,000
15 Installation Charges 100,000
Total Price 1,312,300
GST 18% 236,214
Total Price Ex-Works Lahore 1,548,514
Note:
According to our estimation 100 meters of copper conductor will be used, any changes in the length
at site will affect the cost.
The provision of scaffoldings and civil work for the installation of the air terminals and copper
conductor will be on clients end.
Phone: +92 42-35446195/ 35180653 | fax: +92 42-35181114 | 32-A/2, P.G.E.C.H.S, Lahore, Pakistan. |
General Terms and Condition
Terms of Payment: 70% advance, 20% at the time of delivery and balance after installation
Validity: 10 days
Warranty: 12 months from date of installation or 18 months from delivery date, which
comes first.
Force Majeure: For any delay or failure to deliver the equipment on account of Force Majeure against failure
to deliver the equipment on a reason such WarFire,Flood,Military operation revolution,strike
lockout, riots, epidemic, loss of material in transit wrong shipment by manufacturer/supplier
or any change in Government policies, which may affect our performance and prices, directly
or indirectly and such other reasons not incorporated in this clause. We shall not be held
responsible or liable.
The above quotation is based on your given quantity only. Final quotation shall be quote base on the approval of
drawing/site requirement and total price may be adjusted accordingly.
The above quotation is based on present exchange rate US$ and the prevalent rates from LME price index.
Keeping in view the volatile situation and uncertainty of raw material price, our offer shall be adjusted
as per the prevalent price at the time of procurement of material.