SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
BELT CONVEYOR
(Equipment #: 5 - L – 202)
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
Guido F. Cozzi
Site Manager
Naoufal Akhrif
Operations Manager
Remington Tan
Senior Safety Officer
Elvin Tom
Operations Supervisor
Andrews Ackah
Operations Supervisor
Amro Burhan
Oliver Lazo Bibat Operations Supervisor
Operations Superintendent
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
Contents
1. Purpose/Scope........................................................................................................................................4
2. Terminology...........................................................................................................................................4
3. References:.............................................................................................................................................4
4. Key Personnel Responsibilities..............................................................................................................5
5. HSE........................................................................................................................................................5
6. Requirements.........................................................................................................................................7
7. Other requirements.................................................................................................................................9
8. Spares, Tools & Special Consumables:.................................................................................................9
9. General Information.............................................................................................................................10
10. Before Execution.................................................................................................................................10
11. During Execution.................................................................................................................................10
12. After Execution....................................................................................................................................11
13. Process / Step- by- Step Methodology:................................................................................................11
14. Records Involved.................................................................................................................................36
15. Attachments.........................................................................................................................................36
16. Revision History..................................................................................................................................37
1. Purpose/Scope
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
This procedure provides a generic guideline for the disassembly, cleaning, inspection, assembly,
and maintenance of Belt Conveyor facilities including driver.
All Involved personnel must fully understand the general and specific operating procedures. Any
issues arising during work periods must be brought to the immediate attention of the Team
Leader, Supervisor and Maintenance/Site Manager.
Procedure / guidelines outlined by this document are applicable to all who take part in the process
and must be fully adhered to.
Any deviation from the procedures / guidelines must necessarily have prior explicit approval of
the Maintenance/Site Manager.
2. Terminology
3. References:
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
5. HSE
5.1. Safety
5.1.1.Approved JSA must be available and posted on site before start the job. In case of special or
unique hazard involved, necessary approved JSA shall be made by Operations, Safety and
Maintenance Team.
5.1.2.Take a valid work permit before starting the job and display at job site.
5.1.3.Barricade work area and only concerned working crew shall be allowed inside the area.
5.1.4.Use only Tested and certified Lifting /Rigging tackles i.e chain block, lever block, slings,
belts, eye bolts, D-shackles etc. as SHEM-08.06.
5.2. Health
5.2.1.Use only appropriate Maintenance Tools for disassembly and assembly as per SHEMS
08.07. Special tools as stated by OEM shall be used whenever applicable.
5.2.2.Use PPE’s compatible with the fluid handled, as per SHEMS 08.08.
5.2.3.Use appropriate PPE & scaffolding while working at height as per the SHEMS 08.09.
5.2.4.Handle lubricants and aerosol sprays carefully as these are flammable materials.
5.2.5.Prohibit use of open flames while dismantling equipment parts at site.
5.2.6.Ensure condition of hydraulic oil hose or tubing, fittings and hydraulic piston in good
conditions in case of any hydraulic jacks are used to avoid injuries due to leak of high
pressure oil.
5.2.7.Ensure hydraulic oil hose rating is compatible for the pressure required and pressure gauge
used shall be calibrated.
5.2.8.Make sure that a standby man is presence during hot works (whenever applicable) to avoid
fire.
5.2.9.Before start of equipment dismantling, it is absolutely necessary to verify the following:
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
5.2.9.1. Equipment internals are completely purged until Exposivity is NIL (whenever
applicable).
5.2.9.2. Equipment is depressurized by opening casing drains.
5.2.9.3. Suction and discharge valve were fully closed.
5.2.9.4. Equipment has cooled down to nearly ambient temperature.
5.2.9.5. Electrical breaker/Module has been disconnected and LOTO (Lock out / Tag out)
requirements are fulfilled.
5.3. Environment
5.3.1.In case of any chemical/hazardous waste leakage to the ground or atmosphere, inform
Environment Engineer and dispose in accordance to the SAFCO Environment procedures.
5.3.2.Keep water hose ready at site in case of any exposure.
5.3.3.Keep oil spill kit ready at site in case of any spills.
5.3.4.Dispose of hazardous waste generated during the work as per SAFCO Environment
procedures.
6. Requirements
LSR: Life Saving Rules – is a set of critical EHS Rules associated to high risk activities, if
violated may lead to serious consequence. These rules shall never be broken.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
7. Other requirements
7.1.1.Supervisor assigned for the job shall have clear instructions on the scope of works, duration
and aware about the equipment problems and history.
7.1.2.Personnel involved in the job must be well trained and wearing required PPEs.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
7.1.3.Ensure that all required resources (spareparts, tools, manpower, etc.) for the job are
available.
7.1.4.Overhauling works shall be supervised by OEM Representative or SAFCO Specialist.
7.1.5.Ensure proper communications between concerned parties to ensure safety and quality of
jobs done within estimated timeline.
7.1.6.Erect a proper scaffolding whenever required during assembly/disassembly. Ensure proper
tagging on scaffolding before use.
9. General Information
9.1.1. Before proceeding with the job, review the following preparations:
9.1.1.1. Clean area around the equipment that has to be disassembled.
9.1.1.2. Ensure all equipment parts are protected from dust exposure or other foreign
material.
9.1.1.3. Mobilize all the required tools, tackles and materials on site near the equipment
at the designated area.
9.1.1.4. Ensure equipment was handed over by Operations to Maintenance after
shutdown procedure completed.
9.1.1.5. Allow equipment to cool down to nearly ambient temperature and lube oil
circulation was stopped.
Carry out Mechanical/Electrical isolations as per JSA Operation’s Supervisor (OS) Electrical
1.
requirement. Supervisor (ES) Maintenance Supervisor
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
(MS)
Scanned and attached filled Quality Assurance Checklist to SAP Mechanical Supervisor (MS)
4.
order. Maintenance Planner (MP)
Operations Supervisor (OS) Electrical
Ensure that all Mechanical and Electrical Isolations have been
5. Supervisor (ES) Maintenance Supervisor
normalized.
(MS)
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
1
Visit working area and identify the location for tools, consumables, and
1. parts after removal. Plan for dismantling works requirement i.e.
scaffolding erection, cranes etc.
Prepare special tools required as per OEM special tools list and ensure
3.
all the tools are in good condition and usable.
Prepare all standard tools and consumables required for the job and shift
4. to the identified location nearby working area. Plastic boxes and bags
are recommended for temporary storage of removed parts.
Prepare lifting tools as required and ensure all lifting tools certificate are
not expired.
Cautions:
5. Only use appropriate lifting tools capacity during lifting.
Use soft padding under the sling/wire rope to protect the MS
machine surface.
Refer OEM lifting procedure (shall any) for proper lifting.
Shall hydraulic tools are required, ensure hydraulic tools i.e hydraulic
hose or tubing, fitting and hydraulic cylinder are in good condition.
7.
Pressure gauge must be calibrated and appropriate for the pressure
required.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
ACTIVITY DISASSEMBLY AND REASSEMBLY OF DRIVE DRUM, RETURN DRUM AND BELT
13.3
3 REPLACEMENT:
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
10. Shift the drum from its place and keep it in a safe
place.
11. Inspect drive drum thoroughly for any visible
damages.
12. Inspect pillow block for any damages, carry out
thorough cleaning.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
Replace if needed.
18. Installation of both drive drum and return drum shall
be in reverse order of the disassembly procedure.
Remarks:
2. BELT INSTALLATION:
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
than 1%.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
1. Empty the belt and run at least 3-4 complete runs and MS
observe the belt for sway.
2. Confirm whether total belt is shifting on one side or
only in particular area or spans then proceed for the
adjustment.
3. In this method select a span of guide rollers and
return rollers little more than the area where belt shift
is observed.
4. Loosen the bracket holding bolts of the guide roller
and return roller one by one and adjust the angle of
the brackets depending on the direction of belt shift
required.
5. Repeat the same activity for all the rollers in the
observed span.
6. After every small correction observe the belt sway
for 1-2 complete runs and then proceed for the next
correction.
7. Repeat same correction activity until the belt is
running in the center and perpendicular to the rollers
and pulleys.
8. Observe 2-3 complete runs of the belt after correction
and ensure that the belt in running in center and clear
for loading of the belt.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
1. Empty the belt and run at least 3-4 complete runs and MS
observe the belt for sway.
2. Confirm whether total belt is shifting on one side or
only in particular area or spans then proceed for the
adjustment.
3. In this method observe that the distance of the belt
whether is equal on both sides of the tail end pulley or
not and then decide to adjust.
4. Loosen the adjusting screws on either side of the tail
end pulley bearing Plummer block one by one and
move the tail end pulley Plummer block depending on
the direction of belt shift required.
5. After every small correction observe the belt sway for
1-2 complete runs and then proceed for the next
correction.
6. Repeat same correction activity until the belt is
running in the center and perpendicular to the rollers
and pulleys.
7. Lock the bearing Plummer block adjusting screw’s
lock nuts to ensure that the alignment does not
disturb.
8. Observe 2-3 complete runs of the belt after correction
and ensure that the belt in running in center and clear
for loading of the belt.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
1. Empty the belt and run at least 3-4 complete runs and
observe the belt for sway.
2. Confirm whether total belt is shifting on one side or
only in particular area or spans then proceed for the
adjustment.
3. In this method observe that the distance of the belt
whether is equal on both sides of the belt take up
MS
pulley or not and then decide to adjust.
4. Loosen and remove the adjusting pin from the hole of
guide plate and shift the pin to the next hole on either
side depending on the direction of belt shift required.
5. After shifting the pin to the next hole on either side
observe the belt sway for 1-2 complete runs and then
proceed for the next correction.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
1. Empty the belt and run at least 3-4 complete runs and
observe the belt for sway.
2. Confirm whether total belt is shifting on one side or only in
particular area or spans then proceed for the adjustment.
3. In this method observe that the distance of the belt whether
is equal on both sides of the head end pulley or not and then
decide to adjust.
4. Loosen the adjusting screws on either side of the head end
pulley bearing Plummer block one by one and move the
head end pulley Plummer block depending on the direction
of belt shift required.
5. After every small correction observe the belt sway for 1-2
complete runs and then proceed for the next correction.
6. Repeat same correction activity until the belt is running in MS
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
MS
Refer Gear Reducer Drawing attached.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
at one end.
b. Then push the pinion fully on either of the
ends and set the dial at zero.
c. Then push slowly with soft metal or mallet
the pinion from the opposite side and measure
the shaft end float clearances on the dial and
record it.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
13. Loosen the bolts connecting the bearing caps and the
gear box casing.
14. Using a soft nylon rope lift the low speed hollow shaft
along with the gear wheel.
15. Using a soft nylon rope lift the pinion shaft along with
gear wheel.
16. Then remove the intermediate shaft (input pinion).
17. Remove all shaft seals and clean its housings.
18. Carefully remove all the bearings from the shafts.
Then clean thoroughly all the removed parts and gear
box internals.
19. Inspect all the removed parts like the gear box casing,
gears, oil seals, pinions and shafts for any damages
and replace with new ones wherever found damaged.
Replace all the oil seals irrespective of the
condition of the old oil seals.
Replace all anti-friction bearings. Caution
during installation, heat bearing NOT more
than 120°C.
22. Measure and record run out of all the shafts and
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
pinions.
23. Before starting assembly confirms that the gears are
of matched sets, generally four number figures etched
on the gears.
3. Then fix back bearing end caps and tighten its bolts MS
connecting the bearing end caps and gearbox casing.
4. Fix back the gearbox casing covers to complete gear
box assembly.
5. Shift gearbox to site and install back on location.
6. Check the hollow and machine shafts to ensure that
seats and edges are not damaged.
7. Coat with a suitable lubricant to prevent frictional
corrosion of the contact surfaces.
The hollow shaft must be exactly aligned with the machine
shaft to avoid canting.
11. Align motor with gearbox, install back fluid half flange
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
ACTIVITY
13.6 OVERHAULING OF FLUID COUPLING (IF APPLICABLE),
6
DISASSEMBLY FLUID COUPLING FROM ELECTRIC MOTOR AND BEARING
13.6.1
REPLACEMENT:
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
MS
2.
Open screws and lock washer to remove fill chamber.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
Do not force the coupling during its removal to avoid any damage
to the shaft.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
MS
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
3. Fit
half coupling (item 29, Figure 4) on driven shaft (Gearbox), taking
care that the shaft end does not protrude beyond face “X”.
4. Fit the fixing screw and the washer holding the motor shaft still.
Lock the fixing screw with a torque value as per Table A1 and A2.
5. Lock and peg the driven machine, position the motor as far as the
gap “k” in Figure 4 above; the angular gap with a feeler by
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
2. Fill with oil until it overflows out of the filler hole. While
filling, gently rock the coupling on its axis to make sure
all air excess is vented out of the circuit or if possible,
remove also the cap located in correspondence on the
other rotor. Refer required quantity of oil in Table D1.
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
following:
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)
any.
11. Clean any deposition on the gear box and motor.
12. Check alignment between gearbox and motor.
13. Ensure all the protective devices are in good
condition and re-installed before started
operation.
15. Attachments
SAFCO-II
Maintenance Department - (Elect / Mech / Inst)
BELT CONVEYOR (EQUIPMENT #: 5 - L – 202)
(Subject)