Lakshmipathi Raju CV-Pipeline

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

T.

LAKSHMIPATHI RAJU

Mechanical Engineer

D/No: 27-6-65, Srinagar,


Gajuwaka, Visakhapatnam
Pin : 530026, Andhra Pradesh
E-mail: [email protected]
Mobile: +974-74065202, +974-30894242

PROFILE SUMMERY

Seeking a Progressive and Challenging Position in the field of Construction with a high growth Oriented
Organization.

Mechanical Engineer in Pipeline/piping with 10 years of experience in diverse companies such as EPC Galfar
Al Misnad at Qatar Petroleum, Doha Petroleum Construction, Dhafir Technologies at Adnoc project.
Experience in construction in Brownfield projects predominately in the Oil and Gas, Refinery, Chemical
plant. Engaged in both technical and supervisory roles in Middle East region. Construction, Maintenance
and Planning experience. Specialist in installation of Pipeline system also Execution of Flow-line, Steam-line
piping, Diff types of Tanks, Maintenance of Oil Valves, Shutdown Maintenance. also Specialist in Quantity
surveying, Bill of Materials, Monitoring, Controlling and Closing.
Exhibited exceptional leadership skills by completing the fastest turnkey project

STRENGTHS

 Gulf Experienced Engineering professional.


 Expertise in Oil Storage Tanks and Piping fabrication & construction.
 Expertise in Site supervision & Co-ordination.
 Vendor, Sub-contractor & Client Relationships
 Team building & Leadership
 Willingness to learn new technologies

ORGANISATIONAL SCAN

1. Galfar Al Misnad Engg. & Cont.W.L.L (QATAR)


Scope: (Construction & Maintenance EPIC for Rout survey, Design,
Construction, Installation and Hook-Up of well-Flow-lines project
Current Designation: Piping Engineer
Sl.NO. Project Description Client Date Duration
1 Construction, Installation and Hook-Up of well-Flow- Qatar November Till Date
lines project Energy 2022

2. Galfar Al Misnad Engg. & Cont.W.L.L (QATAR)


( Galfar is an EPC contractor executing turnkey projects in Oil & Gas, Power, Water, Infrastructure, Utility,
Offshore and Onshore.)
Designation: Piping Engineer

Sl.NO. Project Description Client Date Duration


1 Qatar Energy, GRTA Shutdown Qatar January 2022 to 04 months
Energy April 2022
2 Turnaround Maintenance Services For Qatar Energy Seef Qatar April 2022 to 07 months
Chemical Plant Shutdown Energy November 2022
Responsibility includes:
 Preparation, issue, withdraw, transfer and cancellation of PTW safety documents.
 Supervision of all Pipeline/Piping works as per work order and ensures safety and quality standards
of client.
 Check flow direction arrows on valves, verify that they are properly identified and valves are
installed in accordance with flow direction.
 Ensure pipeline supports, anchor and guides have been installed in accordance with the pipeline
drawings and the pipe support details.
 Monitoring the QA/QC Documentation and ensure that all the activities are incorporated to their
system on daily basis and can be traced according to our requirements.
 Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and
prepare punch list for incomplete works.
 Prepare weekly reports of the total spool erection, isometric weight installed, welded diameter
inches of supports and joints and the remaining work front with the materials available.
 Inform Superintendent /Construction Manager about the issues related to work front
 Prepare process flow diagrams along with P&IDs.
 Ensure that all subordinates are trained and knowledgeable of specifications and work procedures
and that work is being performed in conformance with specified quality requirements.
 Prepare Punch list for finished work prior to hand over to the client by paying special attention to all
equipment including Quality checks.
 Familiar with all work permit i.e. hot work, cold work, confined space and gas release permit.
 Sound knowledge of all safety precaution related to work permit.
 Maintenance of all major static equipment like heat exchangers, fin fan coolers, columns, and
pressure vessels, furnace.
 Supervision, monitoring and coordinating of all shutdown activities which include maintenance,
inspection and testing.
 Familiar with Welding & NDT techniques (RT, UT, PT, MPT)
 Well conversant in isometric & engineering drawings.
 Familiar of all items required for construction of Pipeline/piping/Oil Tanks.
 Familiar with W.P.S. and welding symbols, pipe stringing and pipe staging.
 Familiar with International design codes; ASME B31.1 & B31.3, ASTM.
 Familiar of Shell replacement, Bottom plate replacement & Roof plate replacements for Different
types of Tanks.

3. Doha Petroleum Construction Co. Ltd. (DOPET), Doha, QATAR


( DOPET is an executing turnkey projects in Oil & Gas, Power, Water, Utility, Offshore and Onshore.)
Period: (26th SEP 2019 to 09th July 2020)
Designation: Fabrication Supervisor

Responsibility includes:
 Follow up the status of Spools and field run Pipes through reports from fabrication workshop and Painting
yard and Coordinating for transportation these Materials to site.
 Supervising fit up and welding of spool to spool or spool to field run pipe together and welding supports
also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
 Reviewing Method of Statement, Specifications and standards of Materials (Pipes, Fittings, and Flanges
Gaskets).
 Confirm repairs, re-testing and re-inspection in accordance with specifications.
 Supervised for Flange joint assembly and bolt torque.
 Updating database with the information of daily weekly & monthly activity reports, manpower and
materials required for the job completion.
 Implementing high standard of HSE and ensuring zero man-hour loss.
 Supervising welding vents and drains if any.
 Supervising welding pipe supports which to be erected in position at any structure.
 Interconnection of newly coming main steam lines with existing power plant.
 Coordination with engineering department to divide my piping scope into test packages.
 Routine of all pipe lines as per plant layout, Preparing BOQ, Technical Specifications for procurement as
per Standards, Clearing Technical Deviations in offers and giving Technical Recommendations.
 Safety valves, Lifting tools tackles Calibration.
 Close punch items (release test packages for hydro, service, and visual test.
 Ensuring that construction/ Facilities meet government regulations with environmental/health standard.
 Conducted weekly meeting with company and clients with our progress.
 Project cost review, change order documentation and associated cost reporting and maintenance.
4. GOPAL Engineering Works, Visakhapatnam, India.
Period: (01st SEP 2017 to 30th SEP 2019)
Designation: Site Engineer (Piping & Static Equipments)
Client: HPCL
Responsibility includes:
 Follow up the status of Spools and field run Pipes through reports from fabrication workshop and Painting
yard and Coordinating for transportation these Materials to site.
 Supervising fit up and welding of spool to spool or spool to field run pipe together and welding supports
also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
 Reviewing Method of Statement, Specifications and standards of Materials (Pipes, Fittings, and Flanges
Gaskets).
 Confirm repairs, re-testing and re-inspection in accordance with specifications.
 Supervised for Flange joint assembly and bolt torque.
 Updating database with the information of daily weekly & monthly activity reports, manpower and
materials required for the job completion.
 Implementing high standard of HSE and ensuring zero man-hour loss.
 Familiar with International design codes; ASME B31.1 & B31.3, ASTM.
 Supervising welding vents and drains if any.
 Supervising welding pipe supports which to be erected in position at any structure.
 Interconnection of newly coming main steam lines with existing power plant.
 Coordination with engineering department to divide my piping scope into test packages.
 Routine of all pipe lines as per plant layout, Preparing BOQ, Technical Specifications for procurement as
per Standards, Clearing Technical Deviations in offers and giving Technical Recommendations.
 Safety valves, Lifting tools tackles Calibration.
 Close punch items (release test packages for hydro, service, and visual test.

5. Dhafir Technologies L.L.C., Abu Dhabi, UAE


(Dhafir Technologies is an EPC contractor executing turnkey projects in Oil & Gas, Power, Water, Utility and
Aviation industry.)
Period: (26th NOV 2014 to 2nd April 2017)
Current Designation: Asst. SITE Engineer
Project: Cleaning & repair of 29nos Oil Storage Tanks
Client: Abu Dhabi Oil Refining Company (ADNOC)

Responsibility includes:

 Isolation of tank.
 De-sludging of oil tanks.
 Setting out the works in accordance with the drawings and specification
 Liaising with the project planning engineer regarding construction programmes
 Checking materials and work in progress for compliance with the specified requirements
 Observance of safety requirements.
 Resolving technical issues with employer’s representatives, suppliers, subcontractors.
 Liaising with company or project purchasing department to ensure that purchase orders adequately
define the specified requirements.
 Shell replacement, Bottom plate replacement & Roof plate replacements.
 Blasting & painting total internal & external as per scope of work & client requirement.
 Mobilize the materials, assets in site without failure.
 Technical Training to the workers.
 Erection of Scaffolding for Maintenance and repair of tanks.
 Foam pipe & Fire water line replacement of tanks.
 Ensure that all punch list items are resolved: client handover is satisfactory concluded and that there is
no prolongation of project.

6. Jaya Sundar Engineering Works, Visakhapatnam, India.


Period: (10th MAY 2012 to 10th Nov 2014)
Designation: Site Engineer (Piping & Static Equipments)
Project: Cleaning & repair of 10nos Oil Storage Tanks
Client: HPCL
Responsibility includes:

 Isolation of tank.
 De-sludging of oil tanks.
 Experienced in construction & commissioning activities of Low-Pressure, Intermediate & High Pressure
Piping.
 Erection, alignment & commissioning of Auxiliary, Static Equipments.
 Study of Project Drawings and create BOM.
 Responsible for carrying out the mechanical clearance, conducting hydro and pneumatic test, fulfilling
Pre-commissioning and commissioning requirements for the project.
 Implement of monthly plans at execution and contractors & Pushing contractors for timely completion of
works,
 Control quality, Progress, cost & safety of work to reducing minimal rejection rate & rework.
 Erection of Scaffolding for Maintenance and repair of tanks.
 Ensure that all punch list items are resolved: client handover is satisfactory concluded and that there is
no prolongation of project.

SAFETY CERTIFICATION

Fire safety, H2S, Confined Space.


Approved PTW by Qatar Petroleum/Qatar Gas/Qatar Energy.
Approved PTW by Adnoc.

ACADEMICS

 B. Tech (Mechanical) from Sri Chundi Ranganayakulu Engineering College, (Affiliated to


J.N.T.U.Kakinada)
Year of passing – 2012

IT SKILLS

Operating System : Windows


Software : MS-Office (MS-Word, MS-Excel, etc.).
CAD/ : AutoCAD 2008

PERSONAL INFORMATION

Nationality : Indian
Passport No : L2849593 (Expired)
Passport No : Y5017597 (ECNR)
Date of Expiry : 05/06/2033
Place of issue : Doha-Qatar
Sex : Male
Marital status : Unmarried
Languages Known : English, Telugu & Hindi
Skype Username : kumarshyam356
Imo Number : +91-9642220599

DECLARATION

I hereby declare that the above information furnished by me are true and correct to the best of my
knowledge and belief.

T. Lakshmipathi Raju

You might also like