Organisational
structure of P.W.D
Administrative Organisational
Setup Work setup
● (5) He prepares the budget estimates annually relating to the work under his control.
● (6) To keep close watch over the progress of work and expenditure against it.
(3) Ensures all tools plants and machinery are properly maintained.
The assistant engineer is responsible for executive engineers for the execution of work in the subdivision.
(4) To ensure correct accounts, returns submitted punctually to the divisional officer
(5) Submit monthly reports to the progress of work to the divisional officer.
The assistant engineer is responsible for executive engineers for the execution of work in the subdivision.
(4) To ensure correct accounts, returns submitted punctually to the divisional officer
(5) Submit monthly reports to the progress of work to the divisional officer.
(4) Preparation of bills running and final bills for work in his charge.
(7) Carry out a half-yearly check of all stores in his charge and submit a report to SDO.
(8) Report to higher authorities for irregularities in the contract. specification, shortage of supply of
departmental materials, or any difficulty during execution.
Page 14 12 July 2020
Vivekanand Education Society's Polytechnic
PWD Procedure for Initiating the Work
1. For any work, it is necessary to prepare a proposal for the proposed project justifying the project its
necessity, etc for the favour of consideration.
2. The department then studies proposals considering all respect and when it is found the project is
really important and can be feasible then gives administrative approval.
3. After getting the administrative approval engineering department prepares a detailed drawing,
Design, and estimates and submits it for technical sanction.
4. A competent authority study drawing design and estimate and then within rules and regulation
sanction the same called technical sanction.
5. Once the project is technically sanctioned budget provision is made as per government plan and then
work is taken for execution.
• For any work, it is necessary to prepare a proposal for the proposed project justifying the project its
necessity, etc for the favour of consideration.
• For any work, project it is necessary to take formal acceptance with respect to cost, and work called
as administrative approval
• For administrative approval, the department sends a proposal to the government for taking up the
work.
• After considering all aspect like feasibility of project financial aspect government accept proposal
called as administrative approval
• After getting administrative approval detailed drawing, design, estimate, etc are prepared and
submitted for technical sanction
• The technical sanction means the sanction of the detailed estimate, design, rates, and cost of work
• It is sanctioned by competent authority the week is taken for execution only after the technical
sanction.
• the estimated amount exceeds 10% of administratively approved amount technical sanction is
granted only after obtaining revised administrative approval for work technical sanction once given
remains valid for 5 years.
• The government gives the power of sanction to various government officials as follows:
• After getting administrative approval and technical sanction a report is prepared to mention raw
material.
• organization setup and total cost required for the execution of a project
• Considering proposal budget provisions are made in a five-year plan and yearly budgetary provisions
are made and sanction is given Budget is prepared by the finance department.
• It is necessary to arrange required finance for various activities to carry out the progress of work in
sequence and smoothly