0% found this document useful (0 votes)
34 views2 pages

Set D: Offline

Uploaded by

Sanjay Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views2 pages

Set D: Offline

Uploaded by

Sanjay Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Set D

SRM Institute of Science and Technology Mode of Exam


College of Engineering and Technology OFFLINE
School of Computing (Open Elective)
Common to Computing Technologies/Networking and Communication/Computational
Intelligence/Data science and Business systems
SRM Nagar, Kattankulathur – 603203, Chengalpattu District, Tamilnadu
Academic Year: 2023-24 (ODD)

Test: CLAT-1 Date : 17/08/2023


Course Code & Title: 18EEO308T- Electrical Power System Duration: 50 Mins
SEM: 5th & 7th Max. Marks: 25

Course Articulation Matrix:


Course
PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12 PSO1 PSO2 PSO3
Outcomes
CO1 H M
CO2 H L M M
CO3 H L M
CO4 H M M
CO5 H H M
CO6 H H M M

Part - A
(1 x 5 Marks = 05 Marks)
Instructions: Answer all questions
Q. Question Op
Mark
No tio BL CO PO
s
n
The power generated in a windmill is more in rainy season
since, damp air would mean more air mass
A. hitting the blades
1 B. depends on the height of the tower 1 2 1 1
C. depends on wind velocity
D. can be increased by planting tall trees close to the tower
Calculate the maximum energy produced by a power plant when
the power plant is operated for 24 hours and the installed
capacity is 30 kW.
2 A. 420 KWh 1 2 1 1
B. 520KWh
C. 620KWh D. 720KWh
The primary distribution voltage range is reduced a
A.33 kV to 11 kV
3 B.66 kV to 33 kV 1 1 1 1
C.132 kV to 33 kV D.132 kV to 66 kV
In secondary transmission, electric power transmitted is
transmitted at 33kV by __________ overhead systems to
Various substations.
4 A.3 phase 2 wire 1 3 1 1
B.3 phase 3 wire
C.3 phase D.3 phase 4 wire
The cost of power generation is increased by
A. Selecting proper equipment of longer life and proper capacity
5 B. Carrying out proper maintenance 1 1 1 1
C. Running large sized generators
D. Increasing the efficiency of the plant
Part – B
(2 x 4 Marks = 08 Marks)
Instructions: Answer any two questions

6 Draw the basic layout of tidal power plant. 4 1 1 1

7 Give any four Disadvantages of Diesel Power Plant. 4 1 1 1

Water for a hydro-electric station is obtained from a reservoir with a


head of 100 meters. Calculate the electrical energy generated per hour
8 4 2 1 1
per cubic meter of water if the hydraulic efficiency be 0.86 and
electrical efficiency 0.92.
Part – C
(1 x 12 Marks = 12 Marks)
Instructions: Answer any one question

Illustrate the construction and operation of solar PV based power plant


9 12 2 1 2
with a neat sketch.

With a neat sketch explain the construction and working of Nuclear


10 12 2 1 2
power plant.

You might also like