Internal Load Test was conducted on the 8th January 2020 to ensure both the cranes are in safe
condition to be operated.
A List of Weight Used for Each Load Test Are as mentioned below
We, Liftech Engineering confirmed that as according to the Load Test done that, no brake slip occurred
during the load test and the Overhead Crane which we have completed the Load Test are completely
safe to be used.
Confirmed By,
LIFTECH ENGINEERING (KL) SDN. BHD.
…………………………………
Treston Ng
Email: [email protected]