FG Snags
FG Snags
2 1 1 Yes Yes
1 1 Yes
3 1 Yes Yes
1 1 Yes Yes
1 1 Pending
2 1 1 Yes Pending
1 1 1 n.a.
1 1 1 Yes Pending
2 1 Yes Yes
2 1 1 Yes Pending
3 1 1 Yes Pending
1 1 1 Yes
1 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes
2 1 Yes Yes
2 1 Yes Pending
1 1 1 Yes Yes
1 1 Yes Yes
1 1 Yes Yes
2 1 1 Yes
2 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Pending
1 1 1 Yes
1 1 Yes
1 1 1 Yes Yes
1 1 1 Pending
1 1 Yes
1 1 1 Yes Yes
1 1 Pending
1 1 Yes
1 1 1 Yes Yes
1 1 1 Pending
2 1 1 Yes
2 1 Yes Pending
3 1 Yes
1 1 1 Yes Pending
2 1 Pending
1 1 1 Yes Yes
1 1 1 Yes
2 1 1 Yes Yes
1 1 Yes Yes
1 1 Yes Yes
2 1 1 Yes
1 1 1 Yes Yes
3 1
2 1 Yes
2 1 1
2 1 1 Yes Yes
1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Pending
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 Yes Yes
1 1 1 Yes Yes
1 2 1 Yes Yes
1 1 1 Yes
1 1 1 Yes
3 1 1 n.a.
2 1 1 Yes Yes
1 1 Pending
1 1 1 Yes Yes
1 1 1 Yes
1 1 Yes Pending
1 1 1 Yes Yes
3 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
2 1 1 Yes
1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes
2 1 1 Yes Yes
1 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 Yes Yes
1 1 1 Yes Yes
1 2 1 Yes Pending
1 1 1 Yes Yes
1 1 1 Yes Yes
1 2 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
2 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 1 Yes Yes
1 1 Yes Pending
1 1 1 Yes Yes
1 1 2 Yes Yes
2 1 1 n.a.
1 1 1 Yes Yes
1 1 1 Yes Pending
2 1 1 Yes Yes
1 1 1 Yes Yes
2 1 1 Yes Yes
3 1 1 Yes Yes
1 1 1 Yes Yes
BFL Remark
Hold by BFL
Timer Pending
Timer Pending
Timer Pending, Main Door OWV Branding, Flange Pending & Fitting Not Done Properly
Main Glass Door Branding, Timer Pending
OWV Branding Pending
GSB Installation Penidng, Timer Pending
Timer Pending
Timer Pending, Outside Glass Branding Pending, Board Fitting not Done Properly
Timer Pending, Main Door Branding Pending
Timer Pending, Lollypop, Arch Gate, OWV Branding Pending
Timer Pending, Flange Pending, OWV Branding Pending
Timer Pending, Flange, Arch Gate, OWV Branding
Lollypop, Arch Gate, Glass Branding, Timer Pending
Lollypop, Timer Pending
Lollypop not Installed properly, Arch Gate Pending, Timer Is pending
Main Glass Door Branding Pending
Glass Branding Pending
Timer Pending
Front Side Glass Branding, Timer Pending
Timer Pending
Timer Pending & OWV Pending
GSB, Lollipop & Flange not working in night, All board on timer Arch gate not fixed proper
GSB wire not fixed, Timer not installed, Arch gate not fixed, branding removed automatice
Lollipop board not installed & GSB & Flange board light not working.
Timer pending
GSB not on timer
GSB light not working, lolly pop loose install , glass branding pending
OWV Pending
Timer pending / Lolipop board not installed properly / all wire not fixed properly
Lolipop board not installed properly
GSB, Lollipop & Flange board light not wotking due to not on timer
Timer pending / GSB light not working
GSB, Lollipop & Flange light connection pending, Arch gate not installed proper
GSB & Lollipop light connection pending
Lollipop light not working, Glass Branding not change, 1 GSB instalation pending
Timer pending
Light not wokring , arch gate and looy pop not fixed proper
Wire loose wire not ok, Connection is on UPS, Timer not set, Arch gate not as per size, GSB, Lollipop & Flange light not working
OWV Pending
Lollipop Broken
GSB size to be enhanced
GSB light not working
GSB light not working
Branding not done as per requirement and light not working
Electrical Supply
Electrical Supply
Photos Pending
Branch Changed
Photos Pending
Photos Pending
Required
poor quality of material