Method Statement - Fittings & Valves Installation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

wte EVN Group DBO ^^ aoL-sJIJl o.

V-Mlojljg ^1
(Cjf MINISTRYOFPUBLICWORKS FICHTNER
) ^ GC

TECHNICAL SUBMITTAL

Document Ref. No. UHA-DBOO-MS-QA-06001 01 13 September 2022


Project Name Umm Al Hayman Wastewater Project Project No. SE/171
Client Ministry of Public Works
DBO Company UAH DBO Company for General Contracting for Building S. P. C.
Contract DBO EPC Contract

Subject Fittings And Valves Installation in Chambers forWWTSAssets A1 & TSETS Assets B2
Type of Submittal Method Statement Discipline Mechanical
Purpose of Issue For Approval Location DBOO Overall

DOCUMENT GENERAL SUMMARY


Method Statement for Fittings and Valves Installation in Chambers for WWTS Assets A1 & TSETS Assets B2 (Rev. 01)

We confirm that the submittal complies with the Agreement documents.

CONTRACTOR'S SIGNATURE
REQUESTED BY: REVIEWED& APPROVEDBY:

y
Erasmo Vellucci lieter Geitzenauer
Deputy Project Manager MEP Manager

Distribution
. Client I Buyer's Engineer DBO Company I Contractor D Others:
DOCUMENTREVISIONHISTORY

REV NO. DESCRIPTION OUR TRANSMITTAL THEIR TRANSMITTAL


DATE

Method Statement - Fittings And Valves Installation In Chambers


for WWTSAssets A1 S TSETSAssets B2 21 August 2022 442-01-425-TX-02946-22
Method Statement - Fittings And Valves Installation In Chambers
for WWTSAssets A1 S TSETSAssets B2 13 Sept 2022 442-01-425-TX-03245-22

BUYER'S ENGINEER REVIEW


DOCUMENT REVIEWSTATUS [J Approved Approved as Noted Not Approved
COMMENTS

REVIEWED BY:

Name Signature Date

FORM # UHS-DBOO-FO-AD-00007 Rev. 04 11. 11.2020 PAGE 1 OF 1