Study of Power Systems On Etap
1.)What is FPSO?
Electro-mechanical Transient
Angular stability to find out the Critical clearing time(Max. fault clearing time)
Voltage stability
Electro-magnetic transient
Insulation co-ordination studies:-
To check the dielectric strength of the equipment’s.
if the over voltage like the Temporary over voltage, slow front overvoltage, fast front
over voltage & very fast front over voltage which may arises.
This overvoltage is within the limit or not
Recommendation:- surge arrestor has to be installed
In the Insulation co-ordination study,
if the system voltage is below 245kV then the switching study is important
if the system voltage is more than 245kV then the switching studies & lightning studies is more
important
k.)Transformer Energization study:-
why we need the Transformer energization study
Transformer able to energize the 4 no's of 28MW generator
Due to step down transformer(66/13.8kV) energization voltage dip occurs on 13.8kV bus