Boiler Audit Checklist
Boiler Audit Checklist
00
Date: 14-04-22
a. Analyzer skid
3
b. All 6 floors of boiler
c. BFW inlet 6"-BFW-1001-M3NB2SBA-HC
d. Steam outlet 10"-SH-1061-M1NI2SBA-HC
Peep-holes & Metal-braided flexible Hoses: Check condition of metal-braided hoses at following locations (for any damage to the hose or
its metal-braiding, any air leakage from its threaded joint)
Check condition of peep-holes (check glass for any breakage or crack; hard-to-open peep-hole, damaged or rusted spring)
OK No OK OK No OK
Piping Supports: Check for following conditions of piping supports on steam outlet line in the boiler
structure and also on the pipe-rack located at east side of both boilers.
6
a. Misaligned supports
b. Unusually high travel of supports in hot condition