0% found this document useful (0 votes)
461 views26 pages

Control Plan

This document provides a control plan for parts with part numbers 23578693/P03 and 23578820/P03. The control plan details the key processes, characteristics to control, inspection methods, frequencies and reaction plans for non-conforming parts.

Uploaded by

ashish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
461 views26 pages

Control Plan

This document provides a control plan for parts with part numbers 23578693/P03 and 23578820/P03. The control plan details the key processes, characteristics to control, inspection methods, frequencies and reaction plans for non-conforming parts.

Uploaded by

ashish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

CONTROL PLAN

Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Contact Number : +918109092470
Control Plan Number : BEL/CP/23578693 / P03 & 23578820 / P03 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel, SB Chaurasia,
Part No./ Latest change Level 23578693 / P03 & 23578820 / P03 Customer Engineering Approval Date (If Required) :
Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,C-SHAPE LH / RH Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine, Special Reaction Plan
Process Name/ Operation Sample
Process Device, Jig, characteristi Evaluation including corrective
description Product/ Process Specification
No. Tools for Mfg. No. Product Process cs Measurement action
Tolerances Error Proofing/
Techniques Size Freq. Detection
Prevention

Check every batch by 3rd


part (if buy by trader) Inward Inspection
1 RAW MATERIAL -------- E34 T.C. VERIFICATION As per RQC sampling plan RQC Section:03
Check by once in a year (if Record
buy by Mill)

2 SHEET THICKNESS -------- 2±0.2 MICRO METER " " Nill " 1. Inform to Supervisor
2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet
3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill " to supplier. (or)
4. Scrap

4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill "

FREE FROM RUST, DAMAGE &


5 APPEARANCE -------- VISUAL " " Nill "
BURRS

Inprocess Insp.
1 LENGTH -------- 1250 ±5 M.Tape First & last 2nos. Every one hour Nil
Reprot

2 WIDTH -------- 64 ±1 VC First & last 2nos. Every one hour Stopper in M/c "
1. Inform to Supervisor
Shearing 2. Material sorting
20 Shearing 3 THICKNESS -------- 2 ±0.2 MICRO METER First & last 2nos. Every one hour Nil "
Machine 3. Rework if excess size.
4. Reject if undersize
FREE FROM RUST, DAMAGE &
4 APPEARANCE -------- VISUAL First & last 2nos. Every one hour Nil "
BURRS
BLADE
5 CUTTING -------- SHARP VISUAL First & last 2nos. Every one hour Nil "
EDGE
L 66 ±0.5 VC Inprocess Insp.
1 LENGTH x WIDTH -------- First & last 2nos. Every one hour Stopper pin for strip
W 56.7 ±0.5 & 57.72 ±0.5 MICRO METER Reprot

Tool no. -
2 BLANK PROFILE -------- AS PER MASTER SAMPLE Visual First & last 2nos. Every one hour Nil "
80711-017 1. Inform to Supervisor
30 Blanking 2. Material sorting 3.
Tonnage - Rework 4. Scrap
3 APPEARANCE -------- FREE FROM DAMAGE & BURRS Visual 100%-for O Per Lot Nil "
175T

4 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23578693-OS1 Nil "


Characteristic Methods
Control Method
Part/ Machine, Special Reaction Plan
Process Name/ Operation Sample
Process Device, Jig, characteristi Evaluation including corrective
description Product/ Process Specification
No. Tools for Mfg. No. Product Process cs Measurement action
Tolerances Error Proofing/
Techniques Size Freq. Detection
Prevention

1st flange height - 29.5 ±1 VC/Height Gauge Inprocess Insp.


1 FLANGE HEIGHT -------- First & last 2nos. Every one hour Nil
2nd flange height - 24.5 ±1 [80711-20] Reprot

2 WIDTH -------- 20 ±0.5 VC First & last 2nos. Every one hour Nil "

Tool no. -
3 DISTANCE -------- 53 ±1 VC First & last 2nos. Every one hour Nil " 1. Inform to Supervisor
80711-019
2. Material sorting
40 Forming LH+RH
3. Rework
Tonnage -
4 RADIUS -------- 2XR4 RG First & last 2nos. Every one hour Nil 4. Reject
175T

5 APPEARANCE -------- FREE FROM DAMAGE & BURRS Visual 100%-for O Per Lot Nil "

6 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23578693-OS2 Nil "

Ø12 +0.4/0.0 Inprocess Insp.


1 HOLE DIAMETER -------- VC / CF [80711-20] First & last 2nos. Every one hour Nil
Ø9 +0.4/0.0 Reprot

2 HOLE POSITION -------- 2x 15 ±1 VC / CF [80711-20] First & last 2nos. Every one hour Nil

Tool no. -
3 HOLE POSITION -------- 14.5 +0.0/-0.5 VC / CF [80711-20] First & last 2nos. Every one hour Nil " 1. Inform to Supervisor
80711-018
2. Material sorting
50 Piercing & parting 2 Station
3. Rework
Tonnage -
4 DIM -------- 9.5 +0.0/-0.5 VC / CF [80711-20] First & last 2nos. Every one hour Nil 4. Reject
175T

5 APPEARANCE -------- FREE FROM DAMAGE & BURRS Visual 100%-for O Per Lot Nil "

6 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23578693-OS3 Nil "

Sr no Rev. No. Revision Date Revision Summary

1 1 17.10.2019 Add Dimension : Radius 2xR4, Dim 9.5+0.0/-0.5

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya

LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
CALIPER;F.M-FLAT MICROMETER;PM-POINT MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:

Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Control Plan Number : BEL/CP/23527824 /P03 Contact Number : +918109092470
07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya
23527826 / P03
Part No./ Latest change Level : 23527824 / P03 Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel, SB Chaurasia,
Customer Engineering Approval Date (If Required) :
23527826 / P03 Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,BUMPER INTERFACE Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Machine, Control Method
Part/ Process Name/ Special Reaction Plan including corrective
Device, Jig, Sample
Process No. Operation description characteristics Product/ Process Evaluation Measurement action
Tools for Mfg. No. Product Process
Specification Tolerances Techniques Error Proofing/
Size Freq. Detection
Prevention
Check every batch by 3rd part (if
As per RQC sampling plan RQC buy by trader)
1 RAW MATERIAL -------- BSK46 T.C. VERIFICATION Inward Inspection Record
Section:03 Check by once in a year (if buy by
Mill)
1. Inform to Supervisor
2 SHEET THICKNESS -------- 3 ±0.3 MICRO METER " " Nill "
RM reciept and 2. Containtment of RM.
10 incoming inspection of --- 3. Reject and send back to supplier.
sheet 3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill " (or)
4. Scrap
4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill "

FREE FROM RUST, DAMAGE &


5 APPEARANCE -------- VISUAL " " Nill "
BURRS

1 LENGTH -------- 1250 ±5 M.Tape First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 WIDTH cs 122 ±1 VC First & last 2nos. Every one hour Stopper in M/c "
1. Inform to Supervisor
Shearing 2. Material sorting
20 Shearing 3 THICKNESS -------- 3 ±0.3 MICRO METER First & last 2nos. Every one hour Nil "
Machine 3. Rework if excess size.
4. Reject if undersize
FREE FROM DAMAGE &
4 APPEARANCE -------- VISUAL First & last 2nos. Every one hour Nil "
BURRS

BLADE CUTTING
5 -------- SHARP VISUAL First & last 2nos. Every one hour Nil "
EDGE

1 LENGTH -------- 221±1 VC First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 WIDTH -------- 107±1 VC First & last 2nos. Every one hour Stopper in M/c

3 Distance -------- 57±1 VC First & last 2nos. Every one hour Nil

4 Dim -------- 93.17±1 VC First & last 2nos. Every one hour Nil

Tool no. - 5 Dim -------- 2X 30.01 VC First & last 2nos. Every one hour Nil 1. Inform to Supervisor
80711-008 2. Material sorting
30 Blanking
3. Rework
Tonnage- 175T 6 Distance -------- 98.56±1 VC First & last 2nos. Every one hour Stopper in M/c 4. Scrap

7 Radius -------- 2xR14.5 R.G First & last 2nos. Every one hour Stopper in M/c "

8 Radius -------- 2xR5 R.G First & last 2nos. Every one hour Nil

FREE FROM RUST, DAMAGE &


9 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
BURRS

10 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527824-OS1 Guide plate as per blank profile Inprocess Insp. Reprot
Characteristic Methods
Machine, Control Method
Part/ Process Name/ Special Reaction Plan including corrective
Device, Jig, Sample
Process No. Operation description characteristics Product/ Process Evaluation Measurement action
Tools for Mfg. No. Product Process
Specification Tolerances Techniques Error Proofing/
Size Freq. Detection
Prevention

1 Slot Size -------- 2X (31.2x17.2)+0.5/-0 VC First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 Distance -------- 38.03±1 VC First & last 2nos. Every one hour Nil

Tool no. - 3 Slot C.D. -------- 99 ±0.5 VC First & last 2nos. Every one hour Stopper in M/c " 1. Inform to Supervisor
Slot piercing & 80711-009 2. Material sorting
40
parting and notching 3. Rework
Tonnage- 175T 4 DIMENTION -------- 10±1 4. Reject

FREE FROM DAMAGE &


5 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
BURRS

6 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527824-OS2 Nil "

1 Flange height -------- 29.5±1 HG / CF (80711-11) First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 Distance -------- 30.5±1 HG / CF (80711-11) First & last 2nos. Every one hour Nil "

3 Width -------- 133+1.5/-0.0 HG / CF (80711-11) First & last 2nos. Every one hour Nil "

4 Width sc 175+0.0/-0.5 HG / CF (80711-11) First & last 2nos. Every one hour Stopper in M/c "
Tool No :
1. Inform to Supervisor
80711-010
2. Material sorting
50 Forming LH + RH 5 RADIUS -------- R3 RG First & last 2nos. Every one hour Nil "
3. Rework
4. Reject
Tonnage : 175T
6 DIM -------- 25.84±0.1 HG / CF (80711-11) First & last 2nos. Every one hour Nil "

7 DIM -------- 45±1 HG / CF (80711-11) First & last 2nos. Every one hour Nil "

FREE FROM SCORING


8 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
DAMAGE & BURRS

9 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527824-OS3

Sr no Rev. No. Revision Date `

1 2 17.10.19 Add Dimention : Dim 10±1,Radius 2xR5,Dim45±1 & 25.84±0.1

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya


LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT MICROMETER;PM-POINT
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:

Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Contact Number : +918109092470
Control Plan Number : BEL/CP/23527827 / P03 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel, SB
Part No./ Latest change Level :23527827 / P03 Customer Engineering Approval Date (If Required) :
Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,MFB INTERFACE, LH/RH Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine, Special Sample
Process Name/ Operation Product/ Process Evaluation Reaction Plan including
Process Device, Jig, characteristic
description No. Product Process Specification Measurement corrective action
No. Tools for Mfg. s Error Proofing/
Tolerances Techniques Size Freq. Detection
Prevention

Check every batch by 3rd part (if


buy by trader)
1 RAW MATERIAL -------- BSK46 T.C. VERIFICATION As per RQC sampling plan RQC Section:03 Inward Inspection Record
Check by once in a year (if buy
by Mill)

2 SHEET THICKNESS -------- 5 ±0.4 MICRO METER " " Nill "
1. Inform to Supervisor
2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet 3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill "
to supplier. (or)
4. Scrap
4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill "

FREE FROM RUST,


5 APPEARANCE -------- VISUAL " " Nill "
DAMAGE & BURRS

1 LENGTH -------- 1250 ±5 M.Tape First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 WIDTH -------- 64 ±1 VC First & last 2nos. Every one hour Stopper in M/c Inprocess Insp. Reprot
1. Inform to Supervisor
Shearing 2. Material sorting
20 Shearing 3 THICKNESS -------- 5 ±0.4 MICRO METER First & last 2nos. Every one hour Nil Inprocess Insp. Reprot
Machine 3. Rework if excess size.
4. Reject if undersize
FREE FROM RUST,
4 APPEARANCE -------- VISUAL First & last 2nos. Every one hour Nil Inprocess Insp. Reprot
DAMAGE & BURRS

5 BLADE CUTTING EDGE -------- SHARP VISUAL First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

L 227 ±1
1 LENGTH x WIDTH -------- VC First & last 2nos. Every one hour Nil Inprocess Insp. Reprot
W 64 ±1

2 SLOT SIZE -------- 2 X (37 X 23) +0.5/-0 VC First & last 2nos. Every one hour Nil "

3 DIMENSION -------- 71.38±1 VC First & last 2nos. Every one hour Nil "

Tool no. - 80711- 4 DIMENSION -------- 2x32 ±0.5 VC First & last 2nos. Every one hour Nil " 1. Inform to Supervisor
012 2. Material sorting
30 Slot piercing & parting
3. Rework
Tonnage- 175T 5 DIMENSION -------- 56.78 ±1 VC First & last 2nos. Every one hour Nil 4. Reject

6 SLOT C.D. -------- 99 ±0.5 VC First & last 2nos. Every one hour Nil "

FREE FROM DAMAGE


7 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
& BURRS

8 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527827-OS1 Guide plate as per blank profile Inprocess Insp. Reprot
Characteristic Methods
Control Method
Part/ Machine, Special Sample
Process Name/ Operation Product/ Process Evaluation Reaction Plan including
Process Device, Jig, characteristic
description No. Product Process Specification Measurement corrective action
No. Tools for Mfg. s Error Proofing/
Tolerances Techniques Size Freq. Detection
Prevention

1 FLANGE HEIGHT -------- 30 ±1 (TYP) VC/Height Gauge/CF First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 INNER WIDTH -------- 175 +1/-0 VC / CF (80711-14) First & last 2nos. Every one hour Nil "

3 DIMENSION -------- 50.51 ±0.5 VC / CF (80711-14) First & last 2nos. Every one hour Nil "

Tool No. -80711- 4 FLATNESS -------- 0.5 FILLER GAUGE First & last 2nos. Every one hour Nil " 1. Inform to Supervisor
013 2. Material sorting
40 Forming
3. Rework
Tonnage- 175T 5 DIMENSION -------- 35.5±1 VC /HG First & last 2nos. Every one hour Nil " 4. Reject

6 RADIUS -------- 2 x R5 RG First & last 2nos. Every one hour Nil "

FREE FROM DAMAGE


7 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
& BURRS

8 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527827-OS2 Nil "

Sr no Rev. No. Revision Date Revision Summary


1 01 17.10.2019 Add forming Dimention 35.5±1

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya


LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
MICROMETER;PM-POINT MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Contact Number : +918109092470
Control Plan Number : BEL/CP/23527833 / P03 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel, SB
Part No./ Latest change Level :23527833 / P03 Customer Engineering Approval Date (If Required) :
Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,SLEEVE, CIRCULAR Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine, Special
Process Name/ Operation Sample Reaction Plan including
Process Device, Jig, characteristic Product/ Process Evaluation Measurement
description No. Product Process corrective action
No. Tools for Mfg. s Specification Tolerances Techniques Error Proofing/
Size Freq. Detection
Prevention

Check every batch by 3rd part (if


buy by trader)
1 RAW MATERIAL -------- E34 T.C. VERIFICATION As per RQC sampling plan RQC Section:03 Inward Inspection Record
Check by once in a year (if buy
by Mill)

2 SHEET THICKNESS -------- 2 ±0.2 MICRO METER " " Nill " 1. Inform to Supervisor
2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet 3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill " to supplier. (or)
4. Scrap

4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill "

FREE FROM RUST,


5 APPEARANCE -------- VISUAL " " Nill "
DAMAGE & BURRS

First & last


1 LENGTH -------- 1250 ±5 M.Tape Every one hour Nil Inprocess Insp. Reprot
2nos.

First & last


2 WIDTH cs 76 -0.2/+0 VC Every one hour Stopper in M/c "
2nos.
1. Inform to Supervisor
Shearing First & last 2. Material sorting
20 Shearing THICKNESS -------- 2 ±0.2 MICRO METER Every one hour Nil "
Machine 2nos. 3. Rework if excess size.
4. Reject if undersize
FREE FROM RUST, First & last
APPEARANCE -------- VISUAL Every one hour Nil "
DAMAGE & BURRS 2nos.

BLADE First & last


-------- SHARP VISUAL Every one hour Nil "
CUTTING EDGE 2nos.

L 70 ±0.5 First & last


1 LENGTH x WIDTH -------- VC Every one hour Stopper pin for strip Inprocess Insp. Reprot
W 37 ±0.5 2nos.

First & last


Tool no. - 2 BLANK PROFILE -------- AS PER MASTER SAMPLE Visual Every one hour Nil " 1. Inform to Supervisor
2nos.
80711-029 2. Material sorting
30 Blanking
3. Rework
FREE FROM DAMAGE &
Tonnage - 175T 3 APPEARANCE -------- Visual 100%-for O Per Lot Nil " 4. Scrap
BURRS

4 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527833-OS1 Nil "


Characteristic Methods
Control Method
Part/ Machine, Special
Process Name/ Operation Sample Reaction Plan including
Process Device, Jig, characteristic Product/ Process Evaluation Measurement
description No. Product Process corrective action
No. Tools for Mfg. s Specification Tolerances Techniques Error Proofing/
Size Freq. Detection
Prevention

First & last


1 FLANGE HEIGHT -------- 27 ±1 VC Every one hour Nil "
2nos.
Tool no. - 1. Inform to Supervisor
80711-030 FREE FROM SCORING 2. Material sorting
40 1st Forming 2 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
DAMAGE & BURRS 3. Rework
Tonnage - 175T 4. Reject
3 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527833-OS2 Nil "

25 +0.5/-0
VC /Go-Nogo gauge First & last
1 INNER DiA. -------- 15.5 +0.3/-0 Every one hour Nil "
[80711-32] 2nos.

First & last


Tool no. - 2 DIM -------- 3 ±1 VC Every one hour Nil " 1. Inform to Supervisor
2nos.
80711-031 2. Material sorting
50 2nd & 3rd Forming
3. Rework
FREE FROM SCORING
Tonnage - 175T 3 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil " 4. Reject
DAMAGE & BURRS

4 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23527833-OS3 Nil "

Sr no Rev. No. Revision Date Revision Summary

1 01 17.10.2019 Add Dimention : Dim 3 ±1

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya


LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
MICROMETER;PM-POINT MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Control Plan Number : BEL/CP/23628030 / P02 Contact Number : +918109092470
07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel,
Part No./ Latest change Level :23628030 / P02 Customer Engineering Approval Date (If Required) :
SB Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : COLLAR,FRONT BRACKET Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :
Characteristic Methods
Control Method
Part/ Machine, Special Sample
Process Name/ Operation Product/ Process Evaluation Reaction Plan including
Proces Device, Jig, characteristic
description No. Product Process Specification Measurement Error Proofing/ corrective action
s No. Tools for Mfg. s Size Freq. Detection
Tolerances Techniques Prevention
Check every batch by 3rd part (if
buy by trader)
1 RAW MATERIAL -------- BSK46 T.C. VERIFICATION As per RQC sampling plan RQC Section:03 Inward Inspection Record
Check by once in a year (if buy by
Mill)
1. Inform to Supervisor
2 SHEET THICKNESS -------- 3 ±0.3 MICRO METER " " Nill " 2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet 3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill "
to supplier. (or)
4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill " 4. Scrap

FREE FROM RUST,


5 APPEARANCE -------- VISUAL " " Nill "
DAMAGE & BURRS

25 +0.4/-0 X 15.3 First & last


1 Inner Diameter -------- VC Every one hour Nil Inprocess Insp. Reprot
+0.2/-0 2nos.
First & last 1. Inform to Supervisor
2 Outer Diameter -------- 47 +1/-0 X 37 +1/-0 VC Every one hour Nil "
2nos. 2. Material sorting
20 Laser cutting Base program
Laser program First & last 3. Rework
Program -------- Screen visual Every one hour Nil "
(Bel/MC1/025) 2nos. 4. Scrap
FREE FROM DAMAGE
3 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
& BURRS
Sr no Rev. No. Revision Date Revision Summary
1 00 07.07.2019
Prepared by Vikas Tiwari Approved by - Rohit Mandkriya
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch
Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Date (Review) & Rev
Prototype Pre-Launch Production Date (Origin) : Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni No
Contact Number : +918109092470
Control Plan Number : BEL/CP/23527844 / P04 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel,
Part No./ Latest change Level :23527844 / P04 Customer Engineering Approval Date (If Required) :
SB Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,INSTEP SECTION Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :
Characteristic Methods
Control Method
Part/ Machine, Special Sample Reaction Plan
Process Name/ Operation Product/ Process Evaluation
Proce Device, Jig, characteristi including corrective
description No. Product Process Specification Measurement Error Proofing/
ss No. Tools for Mfg. cs Size Freq. Detection action
Tolerances Techniques Prevention
Check every batch by
M. tap 3rd part (if buy by
As per RQC sampling plan
1 Tube size -------- 60X40XT3XL6000 Vernier caliper trader) Inward Inspection Record
RQC Section:03
Micro meter Check by once in a year
(if buy by Mill) 1. Inform to Supervisor
2. Containtment of RM.
RM reciept and incoming 2 Material properties -------- ERWYS310 T.C. VERIFICATION " " Nil "
10 3. Reject and send back
inspection of sheet
to supplier. (or)
3 Slot C.D. -------- 60 ±0.5 Visual " " Nil " 4. Scrap

FREE FROM
4 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
DAMAGE & BURRS

First & last Every one 1. Inform to Supervisor


1 Length -------- 910 ±2 M.Tap Nil Inprocess Insp. Reprot 2. Containtment of RM.
2nos. hour
20 Cutting 3. Reject and send back
FREE FROM to supplier. (or)
2 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
DAMAGE & BURRS 4. Scrap

First & last Every one


1 1st Angle -------- 149° ±1° B.P. Nil Inprocess Insp. Reprot
2nos. hour
1. Inform to Supervisor
2. Material sorting
30 1st & 2nd Bending 2 2nd Angle -------- 121° ±1° B.P. " " " "
3. Rework
4. Scrap
FREE FROM
3 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
DAMAGE & BURRS

First & last Every one


1 Length -1 -------- 492 ±1 M. Tap Nil Inprocess Insp. Reprot
2nos. hour
1. Inform to Supervisor
2. Material sorting
40 End taper cutting 2 Length -2 -------- 571 ±1 M. Tap " " " "
3. Rework
4. Scrap
FREE FROM
3 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
DAMAGE & BURRS

2 X (43 +0.4/-0 X First & last Every one


1 Slot size -------- Vernier caliper Nil Inprocess Insp. Reprot
33.3 +0.2/-0) 2nos. hour

2 X (25 +0.4/-0 X 1. Inform to Supervisor


2 Slot size -------- Vernier caliper " " " "
15.3 +0.2/-0) 2. Material sorting
50 Slot cutting
3. Rework
3 Slot C.D. -------- 60 ±0.5 Vernier caliper " " " " 4. Scrap

FREE FROM
4 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
DAMAGE & BURRS
Sr no Rev. No. Revision Date Revision Summary
1 00 07.07.2019
Prepared by Vikas Tiwari Approved by - Rohit Mandkriya
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch
Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Control Plan Number : BEL/CP/23576664 / P04 Contact Number : +918109092470 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS


Part No./ Latest change Level : 23576664 / P04 Customer Engineering Approval Date (If Required) :
Chandel, SB Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : TUBE,CONNECTING Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :
Characteristic Methods
Control Method
Part/ Machine, Special Product/ Sample
Process Name/ Evaluation Reaction Plan including
Proces Device, Jig, characteristic Process
Operation description No. Product Process Measurement Error Proofing/ corrective action
s No. Tools for Mfg. s Specification Size Freq. Detection
Techniques Prevention
Tolerances
Check every batch by 3rd part (if
As per RQC sampling plan RQC buy by trader) Inward Inspection
1 RAW MATERIAL -------- YST310 T.C. VERIFICATION
Section:03 Check by once in a year (if buy by Record
Mill)
RM reciept and Hold or reject lot or send
2 TUBE SIZE -------- 38 SQ. X T3 mm VC / Micro meter " " Nill "
10 incoming inspection of --- back to supplier and
sheet 3 LENGTH -------- 5 meter MEASURING TAPE " " Nill " communicate it

FREE FROM
4 APPEARANCE -------- RUST, DAMAGE VISUAL " " Nill "
& BURRS
First & last
1 Length - 1 -------- 540.62 ±1 M. Tap Every one hour Nil Inprocess Insp. Reprot
2nos. Hold The Material for
20 Tapper end cutting 2 Length - 2 -------- 463 ±1 M. Tap " " Nill " any non conformity &
Inform to Supervisor
FREE FROM
5 APPEARANCE -------- Visual 100%-for O Per Lot Nil "
DAMAGE &
Sr no Rev. No. Revision Date Revision Summary
1 00 07.07.2019
Prepared by Vikas Tiwari Approved by - Rohit Mandkriya
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch
Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Contact Number : +918109092470
Control Plan Number : BEL/CP/23576668 / P03 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel, SB Chaurasia,
Part No./ Latest change Level : 23576668 / P03 Customer Engineering Approval Date (If Required) :
Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,CONNECTING Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine, Special
Process Name/ Operation Sample Reaction Plan including
Proces Device, Jig, characteristic Product/ Process Specification Evaluation
description No. Product Process Measurement corrective action
s No. Tools for Mfg. s Tolerances
Techniques Error Proofing/
Size Freq. Detection
Prevention
Check every batch by 3rd
part (if buy by trader) Inward Inspection
1 RAW MATERIAL -------- BSK46 T.C. VERIFICATION As per RQC sampling plan RQC Section:03
Check by once in a year (if Record
buy by Mill)
1. Inform to Supervisor
2 SHEET THICKNESS -------- 4 ±0.4 MICRO METER " " Nill " 2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet 3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill "
to supplier. (or)
4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill " 4. Scrap

FREE FROM RUST, DAMAGE &


5 APPEARANCE -------- VISUAL " " Nill "
BURRS

1 LENGTH -------- 1250 ±5 M.Tape First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 WIDTH -------- 140 +0/0.5 VC " " Stopper in M/c " 1. Inform to Supervisor
Shearing 3 THICKNESS -------- 4 ±0.4 MICRO METER " " Nil " 2. Material sorting
20 Shearing
Machine 3. Rework if excess size.
FREE FROM RUST, DAMAGE &
4 APPEARANCE -------- VISUAL " " Nil " 4. Reject if undersize
BURRS
5 BLADE CUTTING EDGE -------- SHARP VISUAL " " Nil "
L 130 ±1
VC
1 LENGTH x WIDTH -------- W 135 ±1 " " Stopper pin for strip Inprocess Insp. Reprot
MICRO METER
Tools No T 4 96.19±01
1. Inform to Supervisor
[80711-021] 2 BLANK PROFILE -------- AS PER MASTER SAMPLE Visual " " " " 2. Material sorting
30 Blanking
3. Rework
Tonnage FREE FROM RUST, DAMAGE &
3 APPEARANCE -------- Visual 100%-for O Per Lot Nil " 4. Scrap
175T BURRS

4 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23576668-OS1 Nil "


1) 44 ±1(TYP)
Guide plate as per blank
1 FLANGE HEIGHT -------- 2) 24±1 (TYP) VC/Height Gauge First & last 2nos. Every one hour Inprocess Insp. Reprot
profile
2 INNER WIDTH -------- 60 +1/-0 VC " " " "

3 DISTANCE -------- 121.85 ±1 HG " " " "


Tools No
4 DISTANCE -------- 25.73 ±1 VC " " " " 1. Inform to Supervisor
[80711-022]
2. Material sorting
40 Forming LH+RH
5 DIM -------- 51.8 ±1 VC " " " " 3. Rework
Tonnage
4. Reject
175T 6 RADIUS R50 & 2XR6 RG " " " "
FREE FROM SCORING DAMAGE
7 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
& BURRS

8 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23576668-OS2 Nil "


Characteristic Methods
Control Method
Part/ Machine, Special
Process Name/ Operation Sample Reaction Plan including
Proces Device, Jig, characteristic Product/ Process Specification Evaluation
description No. Product Process Measurement corrective action
s No. Tools for Mfg. s Tolerances
Techniques Error Proofing/
Size Freq. Detection
Prevention

1 HOLE DIAMETER -------- Ø8 +0.4/-0 VC/CF [80711-23] First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 HOLE POSITION -------- 36.72±0.5 VC/CF [80711-23] " " " "
Tools No 1. Inform to Supervisor
[80711] HOLE POSITION -------- 30 ±0.5 VC/CF [80711-23] " " " " 2. Material sorting
50 Piercing & parting 2 Station
3. Rework
Tonnage 175T 3 APPEARANCE -------- FREE FROM DAMAGE & BURRS Visual 100%-for O Per Lot Nil " 4. Reject

4 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23576668-OS3 Nil "

Sr no Rev. No. Revision Date Revision Summary

1 01 17.10.2019 Add Dimention : Dim 51.8 ±1 ,Radius R50 & 2XR6, Hole position 36.72 ±0.5

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya


LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
MICROMETER;PM-POINT MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Control Plan Number : BEL/CP/23578705 / P03 Contact Number : +918109092470 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS Chandel, SB
Part No./ Latest change Level : 23578705 / P03 Customer Engineering Approval Date (If Required) :
Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,TOWER ASSY LH/RH Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine, Special
Process Name/ Operation Sample Reaction Plan including
Proces Device, Jig, characteristic Product/ Process Evaluation
description No. Product Process Specification Measurement corrective action
s No. Tools for Mfg. s Error Proofing/
Tolerances Techniques Size Freq. Detection
Prevention

Check every batch by 3rd part (if


As per RQC sampling plan RQC buy by trader)
1 RAW MATERIAL -------- BSK46 T.C. VERIFICATION Inward Inspection Record
Section:03 Check by once in a year (if buy
by Mill)

2 SHEET THICKNESS -------- 3 ±0.3 MICRO METER " " Nill " 1. Inform to Supervisor
2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet
3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill " to supplier. (or)
4. Scrap

4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill "

FREE FROM RUST,


5 APPEARANCE -------- VISUAL " " Nill "
DAMAGE & BURRS

1 LENGTH -------- 1250 ±2 M.Tape First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 WIDTH -------- 250 ±1 VC First & last 2nos. Every one hour Stopper in M/c "
1. Inform to Supervisor
Shearing 2. Material sorting
20 Shearing 3 THICKNESS -------- 3 ±0.3 MICRO METER First & last 2nos. Every one hour Nil "
Machine 3. Rework if excess size.
4. Reject if undersize
FREE FROM RUST,
4 APPEARANCE -------- VISUAL First & last 2nos. Every one hour Nil "
DAMAGE & BURRS

BLADE
5 -------- SHARP VISUAL First & last 2nos. Every one hour Nil "
CUTTING EDGE

1 LENGTH -------- 217.7 ±1 VC First & last 2nos. Every one hour Nil "

2 WIDTH -------- 250 ±1 VC First & last 2nos. Every one hour Stopper in M/c "

3 Dimension -1 -------- 4 X 47.5 ±1 VC First & last 2nos. Every one hour Nil "

4 Dimension -2 -------- 2 X 62 ±0.5 VC First & last 2nos. Every one hour Nil "

5 Dimension -3 -------- 2 X 79.5 ±1 VC First & last 2nos. Every one hour Nil "
1. Inform to Supervisor
2. Material sorting
Tool no. - 6 Hole Size ------- 10 ±0.5 VC First & last 2nos. Every one hour Nil "
3. Rework
80711-026
30 Piercing & parting 4. Scrap
Tonnage - 175T 7 Hole Size ------- 7.1 ±0.5 VC First & last 2nos. Every one hour Nil "
1. Inform to Supervisor
Characteristic Methods 2. Material sorting
Tool no. - Control Method
Part/ Machine, Special 3. Rework
Process Name/ Operation 80711-026 Sample Reaction Plan including
Proces
30 Piercing & parting Device, Jig, characteristic Product/ Process Evaluation 4. Scrap
description No. Product Process Specification Measurement corrective action
s No. Tools for Mfg. s Error Proofing/
Tonnage - 175T Tolerances Techniques Size Freq. Detection
Prevention

8 Hole Position ------- 2 X 25.69 ±1 VC First & last 2nos. Every one hour Nil "

9 Hole Position ------- 84.81 ±0.5 VC First & last 2nos. Every one hour Nil "

10 End to hole center ------- 2 X 61.35 ±0.5 HG First & last 2nos. Every one hour Nil "

FREE FROM DAMAGE &


11 APPEARANCE ------- Visual 100%-for O Per Lot Nil "
BURRS

12 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23578705-OS1 Guide plate as per blank profile Inprocess Insp. Reprot

1 Flange height -------- 90 ±1 HG / CF (80711-28) First & last 2nos. Every one hour Nil Inprocess Insp. Reprot

2 Width -------- 51 ±0.5 VC / CF (80711-28) First & last 2nos. Every one hour Nil "

3 Face to hole center -------- 25.5 ±0.7 VC / CF (80711-28) First & last 2nos. Every one hour Nil "
Tool no. - 1. Inform to Supervisor
80711-027 2. Material sorting
50 Forming 4 Radius -------- 2 X R7 RG First & last 2nos. Every one hour Nil "
3. Rework
Tonnage - 175T 4. Scrap
5 Angle -------- 2 x 90 ̊ ±0.5 ̊ BP First & last 2nos. Every one hour Nil "

FREE FROM SCORING


6 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
DAMAGE & BURRS

7 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23578705-OS2 Nil "

Sr no Rev. No. Revision Date Revision Summary

1 00 07.07.2019 Add dimension - 2X61.35 ±0.5, 25.5 ±0.7 & 2XR7

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya

LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
MICROMETER;PM-POINT MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:

Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
CONTROL PLAN
Prototype Pre-Launch Production Date (Origin) : Date (Review) & Rev No Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Control Plan Number : BEL/CP/23628039 / P02 Contact Number : +918109092470 07.07.2019 17.10.2019 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit, DS


Part No./ Latest change Level : 23628039 / P02 Customer Engineering Approval Date (If Required) :
Chandel, SB Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : BRACKET,FRONT BRACKET Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine,
Process Name/ Operation Special Sample Reaction Plan including
Process Device, Jig, Product/ Process Evaluation
description No. Product Process characteristics Specification Measurement corrective action
No. Tools for Mfg. Error Proofing/
Tolerances Techniques Size Freq. Detection
Prevention
Check every batch by 3rd part (if
buy by trader)
1 RAW MATERIAL -------- BSK46 T.C. VERIFICATION As per RQC sampling plan RQC Section:03 Inward Inspection Record
Check by once in a year (if buy by
Mill)

2 SHEET THICKNESS -------- 3 ±0.3 MICRO METER " " Nill "
1. Inform to Supervisor
2. Containtment of RM.
RM reciept and incoming
10 --- 3. Reject and send back
inspection of sheet 3 LENGTH -------- 2500 ±10 MEASURING TAPE " " Nill "
to supplier. (or)
4. Scrap
4 WIDTH -------- 1250 ±10 MEASURING TAPE " " Nill "

FREE FROM RUST,


5 APPEARANCE -------- VISUAL " " Nill "
DAMAGE & BURRS

First & last


1 LENGTH -------- 1250 ±2 M.Tape Every one hour Nil Inprocess Insp. Reprot
2nos.

First & last


2 WIDTH SC 127 ±1 VC Every one hour Stopper in M/c "
2nos.
1. Inform to Supervisor
Shearing First & last 2. Material sorting
20 Shearing 3 THICKNESS -------- 3 ±0.3 MICRO METER Every one hour Nil "
Machine 2nos. 3. Rework if excess size.
4. Reject if undersize
FREE FROM RUST, First & last
4 APPEARANCE -------- VISUAL Every one hour Nil "
DAMAGE & BURRS 2nos.

BLADE First & last


5 -------- SHARP VISUAL Every one hour Nil "
CUTTING EDGE 2nos.

First & last


1 LENGTH -------- 225.42 ±1 VC Every one hour Nil Inprocess Insp. Reprot
2nos.

First & last


2 WIDTH -------- 29±0.5 VC Every one hour Nil "
2nos.

First & last


Tool no. - 3 WIDTH -------- 44 ±0.5 VC Every one hour Stopper in M/c " 1. Inform to Supervisor
2nos.
80711-33 2. Material sorting
30 Blanking
3. Rework if excess size.
First & last
Tonnage - 175T RADIUS -------- 8 X R10 RG Every one hour Niill " 4. Reject if undersize
2nos.

FREE FROM
4 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
DAMAGE & BURRS

5 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23628039-OS1 Guide plate as per blank profile Inprocess Insp. Reprot

First & last


1 Flange height -------- 2 X 84.5 ±1 HG Every one hour Nil Inprocess Insp. Reprot
2nos.

First & last


2 WIDTH sc 62 +1/-0 VC Every one hour Stopper in M/c "
2nos.

First & last


Tool no. - 3 RADIUS -------- 2XR5 RG Every one hour Nill " 1. Inform to Supervisor
2nos.
80711-35 2. Material sorting
40 Forming
3. Rework
First & last
Tonnage - 175T 4 ANGLE -------- 2 x 90 ̊+1/-0 ̊ BP Every one hour Nill " 4. Reject
2nos.
Characteristic Methods
ToolMachine,
no. - Control Method 1. Inform to Supervisor
Part/
Process Name/ Operation 80711-35 Special Sample 2.Reaction
MaterialPlan including
sorting
Process
40 Forming description Device, Jig, Product/ Process Evaluation
No. Product Process characteristics Specification Measurement corrective action
3. Rework
No. Tools for Mfg. Error Proofing/
Tonnage - 175T Tolerances Techniques Size Freq. Detection 4. Reject
Prevention
FREE FROM
5 APPEARANCE -------- SCORING DAMAGE VISUAL 100%-for O Per Lot Nil "
& BURRS

6 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23628039-OS2 Nil "

First & last


1 Hole Diameter -------- 10 ±0.5 VC / CF (80711-36) Every one hour Nil Inprocess Insp. Reprot
2nos.

First & last


2 Hole Position -------- 34.0+1/-0.5 VC / CF (80711-36) Every one hour Nil "
2nos.
Tool no. - 1. Inform to Supervisor
80711-34 First & last 2. Material sorting
50 Piercing 3 Hole Position -------- 14.5 ±0.5 VC / CF (80711-36) Every one hour Nil "
2nos. 3. Rework
Tonnage - 175T 4. Reject
FREE FROM
4 APPEARANCE -------- VISUAL 100%-for O Per Lot Nil "
DAMAGE & BURRS

5 SHUT HEIGHT ------- AS PER PRESS SHOP OS 23628039-OS3 Nil Inprocess Insp. Reprot

Sr no Rev. No. Revision Date Revision Summary

1 00 17.10.2019 Add Dimention : Dim 34 ±1/-0.5

Prepared by Vikas Tiwari Approved by - Rohit Mandkriya


LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS
MICROMETER;PM-POINT MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch

Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part
Process Manual Belmaks Metal (India) Ltd. Unit 1 & 2 Section : 17

Process Code: NPD Control Plan Revision : 01

Prototype Pre-launch Production Suraj Soni, Selvan T.G., Devendra Patil, Rohit Mandkriya, DS Control Plan No. : CP/Volvo / 23576633-
Core Team Rev. No. : 01
Chandel, SB Chaurasia, Shailendra Dubey and Vikas Tiwari 90_P05/00

Part Name FRONT SUPPORT INSTEP ASSY RH-MED Plant Approval Date : Original Date : 30.06.2016 Rev. Date : 14.12.2016

23576633_P05
Part No. Other Approval Date : Customer Engineering Approval / Date (if Req'd):
23576690_P05

Drawing No. 78537849_05 Key Contact Name : Praffulla Shringi Customer Quality / Approval / Date (if Req'd):

MODEL /
P9218 Key Contact No. : 8827392481 Other Approval/Date (if Req'd) :
PROJECT

Customer : VOLVO

Part No. & Ver. : 82653796_P07, 82653800_P07 Part Name : BRACKET, CONNECTING
Drawing No. & Rev. : --- Part Status : Child Part
Characteristics Methods
Specia
Part/ Process Name/ Machine,Device Sample
l Responsibilit
Process Operation , Jig., Tools for Product /process Evaluation Reaction Plan
Char. y
Number Description Mfg. No Product Process Specification / Measurement Control Method
Class Size Freq.
Tolerance Technique

Check every batch by


3rd part (if buy by
1 Raw material BSK 46 T.C.Verification Once Every Lot trader)
Check by once in a year 1. Inform to
(if buy by Mill) Supervisor
2. Containtment
INCOMING OF of RM.
10 RQC inspector
RAW MATERIAL 2 Sheet thickness 3±0.3 Micro meter As RQC sampling plan Incoming ins report 3. Reject and
send back to
supplier. (or)
3 Length 2500±5 M.Tape " " "
4. Scrap

4 Width 1250±2 M.Tape " " "

Free from
5 Appearance Visual 100% Continuous "
damage,burrs
As per Inprocess Inprocess Inspection 1. Inform to
1 Length 1250±1.0 M.Tape
sampling plan report Supervisor
2. Material
2 Width 110±0.5 VC " " "
sorting Inprocess
Shearing 3. Rework if Inspector
20 SHEARING 3 Thickness 3±0.3 Micro meter " " "
machine excess size.
Free from 4. Reject if
4 Appearance Visual 100% Continuous " undersize
damage,burrs
Blade
5 Sharp Visual 1 Start of shift -- -- Shift incharge
cutting edge
As per Inprocess Inprocess Inspection
1 Length 109±0.5 VC
sampling plan report

2 Width-1 49±0.5 VC " " "


1. Inform to
3 Width -2 42.5±0.5 VC " " " Supervisor
2. Material
sorting Inprocess
4 Hole Dia 2-Ø9+0.5 VC " " "
3. Rework if Inspector
BLANKING & excess size.
30 400TEC 5 Hole CD 44±0.5 VC " " " 4. Reject if
PIERCING
undersize
Hole Position
6 30±0.5 VC " " "
from edge

7 End to Hole CD 12±0.5 VC " " "

Free from
8 Appearance 100% Continuous " " Shift incharge
damage,burrs
Ref Die Height Data Steel Rule / Inform HOD QA Shift incharge,
9 Shut Height Setting / Shift OS
sheet Measuring tape / Reject Operators
As per Inprocess Inprocess Inspection
1 Width 75 +1.0 VC
sampling plan report 1. Inform to
Hole Position Supervisor
2 15.17±0.5 VC " " "
from edge 2. Material
sorting Inprocess
3 Flange height 20±1 VC " " "
3. Rework if Inspector
40 FORMING 400TEC
excess size.
4 Flange height 19.6±1 VC " " " 4. Reject if
undersize
5 Appearance Free from tool mark Visual 100% Continuous "

Ref Die Height Data Steel Rule / Inform HOD QA Shift incharge,
6 Shut Height Setting / Shift OS
sheet Measuring tape / Reject Operators

Part No. & Ver. : 82642118_P09, 82644202_P08 Part Name : BRACKET,STEP SUPP LH

Drawing No. & Rev. : --- Part Status : Child Part


Check every batch by
3rd part (if buy by
Inform HOD QA
1 Raw material BSK 46 T.C.Verification Once Every Lot trader)
/ Reject
Check by once in a year
(if buy by Mill)
2 Sheet thickness 3±0.3 Micro meter As RQC sampling plan Incoming insp. report 1. Inform to
INCOMING OF
10 Supervisor RQC inspector
RAW MATERIAL
2. Material
3 Length 2500±5.0 M.Tape " " "
sorting
3. Rework if
4 Width 1250±2.0 M.Tape " " " excess size.
Free from 4. Reject if
5 Appearance Visual 100% Continuous " undersize
damage,burrs
As per Inprocess Inprocess Inspection 1. Inform to
1 Length 430 ±0.5 HG
sampling plan report Supervisor
2. Material
2 Width 270 ±0.5 VC " " "
sorting Inprocess
Shearing 3. Rework if Inspector
20 SHEARING 3 Thickness 3±0.3 Micro meter " " "
machine excess size.
Free from 4. Reject if
4 Appearance Visual 100% Continuous " undersize
damage,burrs
Blade
5 Sharp Visual 1 Start of shift -- -- Shift incharge
cutting edge
As per Inprocess Inprocess Inspection Inform HOD QA Inprocess
1 Dimensions As per sample part Visual
sampling plan report / Reject Inspector
Free from
30 PIERCING PS 175T 2 Appearance 100% Continuous " " Shift incharge
damage,burrs
Ref Die Height Data Steel Rule / Inform HOD QA Shift incharge,
3 Shut Height Setting / Shift OS
sheet Measuring tape / Reject Operators
As per Inprocess Inprocess Inspection Inform HOD QA Inprocess
1 Dimension As per sample part Visual
sampling plan report / Reject Inspector
40 BLANK CUTTING PS 200TY
Free from
2 Appearance 100% Continuous " " Shift incharge
damage,burrs
As per Inprocess Inprocess Inspection Inform HOD QA
1 Flange height 5±0.5 VC
sampling plan report / Reject Inprocess
50 1st FLANGE PS 400TF
Free from tool Inspector
2 Free from tool mark Visual 100% Continuous " "
mark
As per Inprocess Inprocess Inspection Inform HOD QA
1 Flange height 30 ±1 VC
sampling plan report / Reject
As per Inprocess Inprocess Inspection Inform HOD QA Inprocess
60 2nd FLANGE PS 400TF 2 Flange height 8±0.5 VC
sampling plan report / Reject Inspector
Free from tool
3 Free from tool mark Visual 100% Continuous " "
mark
As per Inprocess Inprocess Inspection Inform HOD QA
1 Slot size (15x30) ±0.5 VC
sampling plan report / Reject

2 Hole Dia. 2-Ø9±0.5 VC " " " "


Inprocess
70 PIERCING PS 300T
Inspector
3 Hole C.D. 236±0.5 VC " " " "

4 End to Hole 2-(14.5±0.5) HG " " " "

As per Inprocess Inprocess Inspection Inform HOD QA


1 Flange height 10.5 ±1 VC
sampling plan report / Reject Inprocess
80 3rd FLANGE PS 300T
Free from tool Inspector
2 Free from tool mark Visual 100% Continuous " "
mark
As per Inprocess Inprocess Inspection Inform HOD QA
1 Slot size (6x56)±0.5 VC
sampling plan report / Reject
Inprocess
90 PIERCING PS 300T 2 Slot size (6x26)±0.5 VC " " " "
Inspector

3 Slot Position 16 ±1 HG " " " "

Part No. & Ver. : 23576658_P03, 23527825_P03 Part Name : BRACKET,TRIM PANEL SUPPOR

Drawing No. & Rev. : ---- Part Status : Child Part


Check every batch by
3rd part (if buy by
Inform HOD QA
1 Raw material BSK 46 T.C.Verification Once Every Lot trader)
/ Reject
Check by once in a year
(if buy by Mill)

INCOMING OF 2 Sheet thickness 3±0.3 Micro meter As RQC sampling plan Incoming ins report "
10 RQC inspector
RAW MATERIAL
3 Length 2500±5.0 M.Tape " " " "

4 Width 1250±2.0 M.Tape " " " "

Free from
5 Appearance Visual 100% Continuous " "
damage,burrs
As per Inprocess Inprocess Inspection Inform HOD QA
1 Length 1250±2.0 M.Tape
sampling plan report / Reject
Inprocess
2 Width 598±0.5 M.Tape " " " "
Shearing Inspector
20 SHEARING
machine Free from
3 Appearance Visual 100% Continuous " "
damage,burrs
Blade
4 Sharp Visual 1 Start of shift -- --
cutting edge
As per Inprocess Inprocess Inspection Inform HOD QA
1 Dim. 52 ±0.5 VC
sampling plan report / Reject Inprocess
As per Inprocess Inprocess Inspection Inform HOD QA Inspector
2 Hole size 2- Ø8 ±0.5 VC
sampling plan report / Reject
30 BLANKING & PIE PS 200T-400T
As per profile
3 Dimension Visual " " " "
template
Free from
4 Appearance 100% Continuous " " Shift incharge
damage,burrs
As per Inprocess Inprocess Inspection Inform HOD QA
1 Dim. 52 ±0.5 VC
sampling plan report / Reject Inprocess
As per Inprocess Inprocess Inspection Inform HOD QA Inspector
2 Dim. 40 ±0.5 VC
sampling plan report / Reject
40 NOTCHING PS 200T-400T
As per profile
3 Dimension Visual " " " "
template
Free from
4 Appearance 100% Continuous " " Shift incharge
damage,burrs
As per Inprocess Inprocess Inspection Inform HOD QA
1 Flange height 63 ±1 HG
sampling plan report / Reject
As per Inprocess Inprocess Inspection Inform HOD QA
2 Hole position 30±.5 HG
sampling plan report / Reject
Inprocess
50 1st FORMING PS 600T 3 Emboss depth 6.7±.5 HG " " " "
Inspector

4 Hole position 197.5±1 HG " " " "

Free from tool


5 Free from tool mark Visual 100% Continuous " "
mark
3 x (11.5 +0.3/-0 x As per Inprocess Inprocess Inspection Inform HOD QA
1 Slot VC
15.5 +0.3/-0) sampling plan report / Reject

2 Hole dia (2 nos) 9±0.3 VC " " " "

3 CD 99.75±0.5 VC " " " "

Inprocess
60 CAM PIERCING PS 400T 4 CD 109.4±0.5 VC " " " "
Inspector

5 Hole edge dis 22±0.5 VC " " " "

6 Hole edge dis 13.9±0.5 VC " " " "

7 Hole edge dis 14±0.5 VC " " " "


As per Inprocess Inprocess Inspection Inform HOD QA
1 Flange height 15 ±0.5 HG
sampling plan report / Reject
Inprocess
70 2nd FORMING PS 400T 2 Width 58 ±0.5 HG " " " "
Inspector
Free from tool
3 Free from tool mark Visual 100% Continuous " "
mark
As per Inprocess Inprocess Inspection Inform HOD QA
1 Hole C.D. 378 ±0.5 HG
sampling plan report / Reject

2 Height 130.5 ±1 HG " " " "

3 Height 152.2 ±.5 HG " " " "


Inprocess
80 RESTRIKE PS 400T
Hole dis from Inspector
4 52.22 ±.5 HG " " " "
edge
Hole dis from
5 117.2 ±.5 HG " " " "
edge
Free from tool
6 Free from tool mark Visual 100% Continuous " "
mark

Part No. & Ver. : 82654642 & P06 Part Name : Bracket, Tube Mounting RH

Drawing No. & Rev. : --- Part Status : Child Part


Check every batch by
Inform HOD QA
1 Raw material Fe410 T.C.Verification Once Every Lot 3rd part (if buy by
/ Reject
trader)
2 Thickness 3 ±0.3 Micro meter As RQC sampling plan Incoming ins report "

BOP AND 3 Length 39 -0.5 VC " " " "


10 INCOMING RQC inspector
INSPECTION 4 Width 37 +0.5 VC " " " "

5 Height 23 +0.5 VC " " " "

Free from Free from


6 Visual 100% Continuous " "
damage,burrs damage,burrs
Manual (Buffing Burr & Scratches not Inform HOD QA
20 DEBURRING 1 Appearance Visual 100% Continuous -- Shift incharge
Wheel Grit-120) allowed / Reject

PREPARED BY : ROHIT MANDKRIYA APPROVED BY: PRAFULLA SHRINGI


AMMENDMENT RECORD
REV
SL.NO DATE PROCESS NO Reason For Revision APPROVED BY
NO
CONTROL PLAN
Date
Prototype Pre-Launch Production Date (Origin) : (Review) & Prepared By Vikas Tiwari
Key Contact/Phone :Mr. Suraj Soni
Rev No
Contact Number : +918109092470
Control Plan Number : BEL/CP/23576633-90/ P05 07.07.2019 19.05.20 & 01 Approved By Rohit mandkriya

Core Team : Suraj Soni, Selvan T.G., Devendra Patil, Rohit Mandkriya,
Part No./ Latest change Level : 23576633/ 90_P05 Customer Engineering Approval Date (If Required) :
DS Chandel, SB Chaurasia, Shailendra Dubey and Vikas Tiwari

Part Name/Description. : FRONT SUPPORT INSTEP ASSY LH/RH Supplier Plant Approval Date : Customer Quality Approval Date (If Required) :

Supplier Plant : Pithampur Supplier Code :45841 Other Approval Date (If Required) : Other Approval Date (If Required) :

Characteristic Methods
Control Method
Part/ Machine, Special Sample Reaction Plan
Process Name/ Operation Product/ Process Evaluation
Process Device, Jig, charact Error including corrective
description No. Product Process Specification Measurement
No. Tools for Mfg. eristics Size Freq. Proofing / Detection action
Tolerances Techniques
Prevention
In-process
M8X1.25 square weld Torque weld 45Nm Every one
Projection Welding 1 -------- Torque meter 1st & last 2nos. Nill inspection
nuts MIN hour
report
For LH 2 Squeez time -------- 22-26 Panel reading " " " "
3 Weld current -------- 5.4-9.4 Panel reading " " " " 1. Inform to Supervisor
1) PN 82642118 Projection &
4 Weld time -------- 8-12 Panel reading " " " " 2. Material sorting
10 2) PN 961614, M8X1.25 mig welding
5 Cooling time -------- 3-7 Panel reading " " " " 3. Rework if acceptable
machine
6 Hold time -------- 0-4 Panel reading " " " " 4. Scrap if not acceptable
For RH
7 Off time -------- 0-4 Panel reading " " " "
1) PN 82644202
8 Air pressure -------- 2-4 BAR GAUGE " " " "
2) PN 961614, M8X1.25
Free from burns
9 Appearance -------- Visual 100% for O Per lot " "
and weld defects
In-process
M8X1.25square weld Torque weld 45Nm Every one
Projection Welding 1 -------- Torque meter 1st & last 2nos. Nill inspection
nuts MIN hour
report
For LH 2 Squeez time -------- 22-26 Panel reading " " " "
3 Weld current -------- 5.4-9.4 Panel reading " " " " 1. Inform to Supervisor
1) PN 82653796 Projection &
4 Weld time -------- 8-12 Panel reading " " " " 2. Material sorting
20 2) PN 961614, M8X1.25 mig welding
5 Cooling time -------- 3-7 Panel reading " " " " 3. Rework if acceptable
machine
6 Hold time -------- 0-4 Panel reading " " " " 4. Scrap if not acceptable
For RH
7 Off time -------- 0-4 Panel reading " " " "
1) PN 82653800
8 Air pressure -------- 2-4 BAR GAUGE " " " "
2) PN 961614, M8X1.25
Free from burns
9 Appearance -------- Visual 100% for O Per lot " "
and weld defects
In-process
M6X1 square weld Torque weld 45Nm Every one
Projection Welding 1 -------- Torque meter 1st & last 2nos. Nill inspection
nuts MIN hour
report
2 Squeez time -------- 22-26 Panel reading " " " "
3 Weld current -------- 5.4-9.4 Panel reading " " " " 1. Inform to Supervisor
Projection & 4 Weld time -------- 8-12 Panel reading " " " " 2. Material sorting
30 Common for LH/RH mig welding 5 Cooling time -------- 3-7 Panel reading " " " "
3. Rework if acceptable
1) PN 23578705 machine 6 Hold time -------- 0-4 Panel reading " " " "
4. Scrap if not acceptable
2) PN 961613, M6X1 7 Off time -------- 0-4 Panel reading " " " "
Pressure
8 Air pressure -------- 2-4 BAR " " " "
gauge(Visual)
Free from burns
9 Appearance -------- Visual 100% for O Per lot " "
and weld defects
Characteristic Methods
Control Method
Part/ Machine, Special Sample Reaction Plan
Process Name/ Operation Product/ Process Evaluation
Process Device, Jig, charact Error including corrective
description No. Product Process Specification Measurement
No. Tools for Mfg. eristics Size Freq. Proofing / Detection action
Tolerances Techniques
Prevention
In-process
As per reference Every one
Sub Assy. (ST10) 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
2 Current -------- ~100 - 120 Voltage " " " " 1. Inform to Supervisor
3 Wire Dia -------- 0.8 mm Vernier Caliper " " " " 2. Material sorting
Welding fixture Pressure 3. Re-setting machine
40 4 Air pressure -------- 04-06 Bar " " " "
Common for LH/RH & machine gauge(Visual) parameter
1) OP30 5 Voltage -------- 18-22 Max Voltmeter " " " " 4. Rework if acceptable
2) PN 23628039 6 Gass Flow -------- 10-15 LPM Visual " " " " 5. Scrap if not acceptable
7 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
8 Appearance -------- Visual 100% for O Per lot " "
and weld defects
In-process
As per reference Every one
Sub Assy. (ST10) 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
2 Hole C.D. -------- 378±2 M. Tap " " " "
3 Distance (Height) -------- 217.4±1 Height gauge " " " "
4 Distance (Height) -------- 22.8±1 Height gauge " " " "
5 Dimension -------- 161±1 Height gauge " " " "
6 Surface to hole center -------- 33.5±1 Height gauge " " " "
1. Inform to Supervisor
For LH 7 Surface to hole center -------- 93.5±1 Height gauge " " " " 2. Material sorting
1) PN 23576658 Welding fixture 8 Hole position -------- 119±1 Height gauge " " " " 3. Re-setting machine
50
2) OP10, OP20 & OP40 & machine 9 Distance (width) -------- 51±0.5 Vernier Caliper " " " " parameter
10 Distance (Height) -------- 104.6±1 Vernier Caliper " " " " 4. Rework if acceptable
For RH 11 Distance (Height) -------- 14±1 Height gauge " " " " 5. Scrap if not acceptable
1) PN 23527825 12 Current -------- ~100 - 120 Voltage " " " "
2) OP10, OP20 & OP40 13 Wire Dia -------- 0.8 mm Vernier Caliper " " " "
Pressure
14 Air pressure -------- 04-06 Bar " " " "
gauge(Visual)
15 Voltage -------- 18-22 Max Voltmeter " " " "
16 Gass Flow -------- 10-15 LPM Visual " " " "
17 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
18 Appearance -------- Visual 100% for O Per lot " "
and weld defects
In-process
As per reference Every one
Sub Assy. (ST20) 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
2 Current -------- ~100 - 120 Voltage " " " " 1. Inform to Supervisor
3 Wire Dia -------- 0.8 mm Vernier Caliper " " " " 2. Material sorting
Welding fixture Pressure 3. Re-setting machine
60 4 Air pressure -------- 04-06 Bar " " " "
Common for LH / RH & machine gauge(Visual) parameter
1) PN 23576664 5 Voltage -------- 18-22 Max Voltmeter " " " " 4. Rework if acceptable
2) PN 23576668 6 Gass Flow -------- 10-15 LPM Visual " " " " 5. Scrap if not acceptable
7 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
8 Appearance -------- Visual 100% for O Per lot " "
and weld defects
Characteristic Methods
Control Method
Part/ Machine, Special Sample Reaction Plan
Process Name/ Operation Product/ Process Evaluation
Process Device, Jig, charact Error including corrective
description No. Product Process Specification Measurement
No. Tools for Mfg. eristics Size Freq. Proofing / Detection action
Tolerances Techniques
Prevention
In-process
As per reference Every one
Sub Assy. (ST20) - sleeve sub assy. 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
2 Current -------- ~100 - 120 Voltage " " " " 1. Inform to Supervisor
3 Wire Dia -------- 0.8 mm Vernier Caliper " " " " 2. Material sorting
Welding fixture Pressure 3. Re-setting machine
70 4 Air pressure -------- 04-06 Bar " " " "
Common for LH / RH & machine gauge(Visual) parameter
1) PN 23628030 5 Voltage -------- 18-22 Max Voltmeter " " " " 4. Rework if acceptable
2) PN 23527833 6 Gass Flow -------- 10-15 LPM Visual " " " " 5. Scrap if not acceptable
7 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
8 Appearance -------- Visual 100% for O Per lot " "
and weld defects
In-process
As per reference Every one
Sub Assy. (ST20) 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
2 Hole C.D. -------- 26.3±1 Vernier Caliper " " " "
3 Distance (Height) -------- 420±1 Height gauge " " " " 1. Inform to Supervisor
12 Current -------- ~100 - 120 Voltage " " " " 2. Material sorting
Welding fixture 13 Wire Dia -------- 0.8 mm Vernier Caliper " " " " 3. Re-setting machine
80
Common for LH / RH & machine Pressure parameter
14 Air pressure -------- 04-06 Bar " " " "
1) PN 23527844 gauge(Visual) 4. Rework if acceptable
2) OP60 & OP70 15 Voltage -------- 18-22 Max Voltmeter " " " " 5. Scrap if not acceptable
16 Gass Flow -------- 10-15 LPM Visual " " " "
17 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
18 Appearance -------- Visual 100% for O Per lot " "
and weld defects
In-process
As per reference Every one
Sub Assy. (ST30) 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
2 Distance (width) -------- 45±1 Vernier Caliper " " " "
3 Distance (Height) -------- 37±1 Height gauge " " " "
4 Distance (Height) -------- 15+0/-1 Height gauge " " " "
5 Hole position -------- 45±1 Height gauge " " " " 1. Inform to Supervisor
Common for LH/RH 6 Hole position -------- 29.5±1 Height gauge " " " " 2. Material sorting
1) PN 23527827-LH/RH Trim edge to slot
Welding fixture 7 -------- 47.5±1 Height gauge " " " " 3. Re-setting machine
90 center
2) PN 23527824-LH & machine parameter
8 Current -------- ~100 - 120 Voltage " " " "
3) PN 82654642-LH/RH 4. Rework if acceptable
9 Wire Dia -------- 0.8 mm Vernier Caliper " " " "
4) PN 23628039-LH/RH 5. Scrap if not acceptable
Pressure
5) PN 23527826-LH 10 Air pressure -------- 04-06 Bar " " " "
gauge(Visual)
11 Voltage -------- 18-22 Max Voltmeter " " " "
12 Gass Flow -------- 10-15 LPM Visual " " " "
13 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
14 Appearance -------- Visual 100% for O Per lot " "
and weld defects
Characteristic Methods
Control Method
Part/ Machine, Special Sample Reaction Plan
Process Name/ Operation Product/ Process Evaluation
Process Device, Jig, charact Error including corrective
description No. Product Process Specification Measurement
No. Tools for Mfg. eristics Size Freq. Proofing / Detection action
Tolerances Techniques
Prevention
In-process
As per reference Every one
Sub Assy. (ST40) 1 Weld length -------- Visual 1st & last 2nos. Nill inspection
smaple hour
report
X - direction at bucket
2 -------- 0 ±7 Foot scale " " " "
side
Y - direction at bucket
3 -------- 0 ±7 Foot scale " " " " 1. Inform to Supervisor
side
Z - direction at bucket 2. Material sorting
For LH Welding fixture 4 -------- 0 ±10 Taper scale " " " " 3. Re-setting machine
100 side
1) OP50, OP80, OP90 & machine 8 Current -------- ~100 - 120 Voltage " " " " parameter
9 Wire Dia -------- 0.8 mm Vernier Caliper " " " " 4. Rework if acceptable
For RH Pressure 5. Scrap if not acceptable
10 Air pressure -------- 04-06 Bar " " " "
1) OP50,OP80,OP90 gauge(Visual)
11 Voltage -------- 18-22 Max Voltmeter " " " "
12 Gass Flow -------- 10-15 LPM Visual " " " "
13 Type of Gas -------- Argon Co2 Visual(Display) " " " "
Free from burns
14 Appearance -------- Visual 100% for O Per lot " "
and weld defects

Inspection before dispatch to Part should be as per Inspection check Before Layout
1 -------- IMTE 5 X Part "
phorotech / Badve checksheet sheet dispatch inspection

X - direction at bucket
2 -------- 0 ±7 Foot scale 100% for O Per lot " 1. Inform to Supervisor
side 100% datum
Y - direction at bucket 2. Material sorting
110 Manual 3 -------- 0 ±7 Foot scale " " " gauge
side 3. Rework or duberring
qualification
Z - direction at bucket 4. Reject
4 -------- 0 ±10 Taper scale " " "
side
Free from carbon
5 Shot-blasting -------- SOP All quantity " " 100% Visual
and impurity
6 RPO -------- Free from rust Visual All quantity " " "
Colour should be
TR21533606
Volvo approved
120 Surface treatment
source
1 (POWDER TOP COAT Refer Tier - 2 PPAP documents
OVER ED PAINTING-
BLACK COLOR)

1 Box size
130 Packing & dispatch to Volvo Fork lift As per Volvo packing standard
2 No. of part per box

Sr no Rev. No. Revision Date Revision Summary

1 1 19.05.2020 Part version number changed from P03 to P05


Prepared by Vikas Tiwari Approved by - Rohit Mandkriya
LEGEND FOR INSPECTED BY :E-ENGINNER; O - OPERTOR;I - INSPECTOR;L-LINER LEADER; TPG-
LEGEND FOR CLASS :CC - CRITICAL ; SC - SIGNIFICANT ; A - A CLASS ;P-PLP; B- B CLASS THREAD PLUG GAUGE;VC-VERNIER CALIPER;F.M-FLAT MICROMETER;PM-POINT
MICROMETER;M.T;MEASURING TAPE;DVC; DIGITAL VERNIER CALIPER:
Note - After power failure,Machine break down & fixture break down check suspeced part as well as first part of Production batch
Note=* indicate that Nut torque Check by putting bolt/stud in nut & applying mallet on bolt/nut-in that case nut should not detach from part