Addendum - Hardware Specifications & Requirement

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

Server Room

Requirement
UPS space should be available for the facility in server room. Space for dedicated UPS of sufficient capacity would be placed. P
Server room to accommodate 4 Racks with approx. 260 sqft area and Hub room (if any) to support one rack with 50sq ft area.
Sufficient Standalone AC/PAC in server room is required to function24*7*365
Dedicated earthling to be provided by electrical team for server room.
Provision for Cat 6e cables for both Data and voice future expansion and capacity planning.
Floor raceways to be considered by electrical team for data cables.
Separate path for Data and electrical cables to be planned and installed.
Provision in rooftop to lay tower or pole for leases line + in building permission for cable routing from outside building to serve
1 Data +1 Voice port +1 additional Redundant Point on each normal user desk. Incase of CCMS usage +1 port.
2 Data +2 voice ports in all cabins.
Multiple data and voice points in meeting/training room(s). Backend Jack Panels.
Voice Resource Backbone with riser cables, Krone and Jack Panels in Server room.
All jack panels in closed racks.
Closed Rack(s) with 1000mmwidth for structured cabling (Field side and Voice resource side)with additional 8U free space for
5x5 Amp power sockets in each rack(s) 12 -14 power sockets per PDU each side
Cat 6e cabling solution ( Molex/Dlink) including IO’s, wire manager, faceplate, gang box, conducting/raceway etc.
Penta scanning of complete cabling &report need to be shared with Company.
Space on walls for EPABX and Voice Krones in Server Room.
800*1000 racks for servers and network equipment’s with perforated front and back doors to provide air circulation.
Power should be available from different source if possible.
Fire resistance partition walls. The proposed partition should have non permissible air tight, thermally insulated under floor. F
Fire resistant door for datacenter
Fire resistant acoustic ceiling for datacenter
Elevated flooring should be available in server room for power and network cable laying & maintenance.
All major telecom service provider feasible for MPLS/ILL/P2P/PRI with necessary approval to pull cable till the server room

Necessary firefighting system, smoke detectors, fire alarm system


Fresh cabling should be done at the location.
Cabling diagram showing the route should be available for future use.
Cable testing certificate should be available for future reference
Extra cables should be laid till all junction points for redundancy
How many racks required – 2 racks at minimum
PAC / AC’s should be sufficient to maintain 22*C 24*7*365. Alternate A/C should function and redundant A/C’s should be avai
Fully Loaded patch panels as per requirement in annexure.
Redundant Network Points for IP cameras (Qty will be decided after office dimension availabilityl) to cover premises surveillan
Redundant Network Points for WIFI Access points to cover internet access
Power / Space & redundant network point feasibility to cater 2 network printers on the floor
Additional power point / space & network point feasibility for departmental printer use.
Rodent Repellant System
BIOMETRIC Access Control System feasible
Required raceway like conjute for pulling MPLS cable to server room
Trapdoors required for maintainance of wifi and camera.
UPS power supply requirement @ all workstations and server room
Minimum 4 power sockets are required
1000 1000 1000 1000 1000 1000

1500 1000 1500

1000 1000 1000 1000 1000 1000


6000
4000
2000
MM FT
A 4000 13.12
B 6000 19.68
C ( Area ) 258.2016

Additional
Rack
Free space
Hardware requirement
Sr. NO.

3
4
Network Switching Cisco
Items Unit
L2 Switch: Access Switch with 48 POE RJ-45 auto-sensing 10/100 /1000 ports and 4 no. x
10G SPF Uplink port, Stacking Port with cable, Dual Power Supply with cable, Inclusive of
required software and licences, Standard hadrware for mounting accessaries. 3yrs 8x5 NBD Each
Warranty (All the warranty contract should between OEM & BOB Finance)
L3 Switch: Core Switch with 24 RJ-45 auto-sensing 10/100/1000 ports and 8 no. x 10G SFP
Uplink port, Stack Module with Stacking Cable, Dual Power Supply with cable, Inclusive of
required software and licences, Standard hadrware for mounting accessaries. 3yrs 8x5 NBD Each
Warranty (All the warranty contract should between OEM & BOB Finance)

10 Gigabit MM --LC SFP Enterprise Class Module with 10G MM LC-LC 5 Mtr fiber patch cord Each
CAT-6 7 Feet Patch Cord
Cisco
Qty.
(i)

6
500
Per Unit Panel
Type Qty Per User Switch Port
Ports

Normal Users 45 4 2
Managers Cabin 3 4 3
WIFI AP 5 2 1
Camera 8 2 1
BIOMetric 6 2 1
Network Printer 2 2 1
Department Specific Printer 2 1
Interrack Cabling 1 24 1
Meeting Room ( 1Qty ) 10 1 1
Additional 5 10 1

abeling should be done using Cat 6e cabling solution ( Molex/Dlink)


Switch P
Total Patvch Panel Ports Required
Required

180 90
12 9
10 5
16 8
12 6
4 2
0 0
24 1
10 10
50 5
318 136
Remarks

Mandatory if analogue phone is deployed or can be 3 port @ each


desk incase of IP Telephony

Qty is subject to office dimension


Qty is subject to office dimension
Optional if access device to be deployed

Additional port Printer *1 on each desk

You might also like