UPS space should be available for the facility in server room. Space for dedicated UPS of sufficient capacity would be placed. P
Server room to accommodate 4 Racks with approx. 260 sqft area and Hub room (if any) to support one rack with 50sq ft area.
Sufficient Standalone AC/PAC in server room is required to function24*7*365
Dedicated earthling to be provided by electrical team for server room.
Provision for Cat 6e cables for both Data and voice future expansion and capacity planning.
Floor raceways to be considered by electrical team for data cables.
Separate path for Data and electrical cables to be planned and installed.
Provision in rooftop to lay tower or pole for leases line + in building permission for cable routing from outside building to serve
1 Data +1 Voice port +1 additional Redundant Point on each normal user desk. Incase of CCMS usage +1 port.
2 Data +2 voice ports in all cabins.
Multiple data and voice points in meeting/training room(s). Backend Jack Panels.
Voice Resource Backbone with riser cables, Krone and Jack Panels in Server room.
All jack panels in closed racks.
Closed Rack(s) with 1000mmwidth for structured cabling (Field side and Voice resource side)with additional 8U free space for
5x5 Amp power sockets in each rack(s) 12 -14 power sockets per PDU each side
Cat 6e cabling solution ( Molex/Dlink) including IO’s, wire manager, faceplate, gang box, conducting/raceway etc.
Penta scanning of complete cabling &report need to be shared with Company.
Space on walls for EPABX and Voice Krones in Server Room.
800*1000 racks for servers and network equipment’s with perforated front and back doors to provide air circulation.
Power should be available from different source if possible.
Fire resistance partition walls. The proposed partition should have non permissible air tight, thermally insulated under floor. F
Fire resistant door for datacenter
Fire resistant acoustic ceiling for datacenter
Elevated flooring should be available in server room for power and network cable laying & maintenance.
All major telecom service provider feasible for MPLS/ILL/P2P/PRI with necessary approval to pull cable till the server room
Additional
Rack
Free space
Hardware requirement
Sr. NO.
3
4
Network Switching Cisco
Items Unit
L2 Switch: Access Switch with 48 POE RJ-45 auto-sensing 10/100 /1000 ports and 4 no. x
10G SPF Uplink port, Stacking Port with cable, Dual Power Supply with cable, Inclusive of
required software and licences, Standard hadrware for mounting accessaries. 3yrs 8x5 NBD Each
Warranty (All the warranty contract should between OEM & BOB Finance)
L3 Switch: Core Switch with 24 RJ-45 auto-sensing 10/100/1000 ports and 8 no. x 10G SFP
Uplink port, Stack Module with Stacking Cable, Dual Power Supply with cable, Inclusive of
required software and licences, Standard hadrware for mounting accessaries. 3yrs 8x5 NBD Each
Warranty (All the warranty contract should between OEM & BOB Finance)
10 Gigabit MM --LC SFP Enterprise Class Module with 10G MM LC-LC 5 Mtr fiber patch cord Each
CAT-6 7 Feet Patch Cord
Cisco
Qty.
(i)
6
500
Per Unit Panel
Type Qty Per User Switch Port
Ports
Normal Users 45 4 2
Managers Cabin 3 4 3
WIFI AP 5 2 1
Camera 8 2 1
BIOMetric 6 2 1
Network Printer 2 2 1
Department Specific Printer 2 1
Interrack Cabling 1 24 1
Meeting Room ( 1Qty ) 10 1 1
Additional 5 10 1
180 90
12 9
10 5
16 8
12 6
4 2
0 0
24 1
10 10
50 5
318 136