Traffic Management Plan

Uploaded by

waseemsanda94
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views10 pages

Traffic Management Plan

Uploaded by

waseemsanda94
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

<INSERT LOGO>

<Title of Works>

TRAFFIC MANAGEMENT PLAN

<Add Details of Works>

<Add TMP Number>

Page 1 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

Prepared by: <insert name>


Approved by:
Name: Name: Name:
<insert name> <insert name> <insert name>
<insert position> <insert position> <insert position>
Signature: Signature: Signature:

<insert date> <insert date> <insert date>

Table of Modifications
Revision Date Modifications to content Author

Page 2 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

Table of Contents
1 Overview ......................................................................................................................................... 5
1.1 Introduction ..........................................................................................................................................................5
1.2 Purpose of this Plan ..............................................................................................................................................5
1.3 Legislative Requirements......................................................................................................................................5
2 Project Overview ............................................................................................................................. 5
2.1 Works Overview....................................................................................................................................................5
3 Location of Works............................................................................................................................ 5
3.1 Road Occupancy Approval ....................................................................................................................................5
4 Existing Conditions .......................................................................................................................... 5
4.1 <add area/location/event> ...................................................................................................................................6
4.2 <add area/location/event> ...................................................................................................................................6
4.3 <add area/location/event> ...................................................................................................................................6
5 Project Impacts to Traffic & Transport ............................................................................................. 6
5.1 Work Hours ...........................................................................................................................................................6
5.2 Operating Conditions ............................................................................................................................................6
5.3 Impact on Traffic Flow ..........................................................................................................................................6
5.4 Impacts on Transport............................................................................................................................................7
5.5 Parking ..................................................................................................................................................................7
5.6 Emergency Services ..............................................................................................................................................7
5.7 Pedestrians ...........................................................................................................................................................7
5.8 Cyclists ..................................................................................................................................................................7
5.9 Heavy Vehicles ......................................................................................................................................................7
5.10 Resident/Business Impacts ...................................................................................................................................7
5.11 Construction Site Entry/Exit .................................................................................................................................7
6 Traffic Control Devices ..................................................................................................................... 8
6.1 Signage and Infrastructure ...................................................................................................................................8
6.2 Line Marking .........................................................................................................................................................8
6.3 Speed Zoning ........................................................................................................................................................8
6.4 Intelligent Transport System (ITS) Devices ...........................................................................................................8
6.4.1 Traffic Signal Modifications ..............................................................................................................................8
6.4.2 Temporary Traffic Signals .................................................................................................................................8
6.4.3 Variable Message Signs (VMS) .........................................................................................................................8
6.4.4 Radar Activated Speed Signs ............................................................................................................................8
6.4.5 Live Tracking Resources ....................................................................................................................................8
6.3 Incident Response / Management .......................................................................................................................8
7 Risk Assessment .............................................................................................................................. 8
8 Communications Strategy ................................................................................................................ 9
8.1 Worksite Communications ...................................................................................................................................9
8.2 Stakeholder Works Notifications ..........................................................................................................................9
8.3 Emergency Services Notification ..........................................................................................................................9
9 Contact Details ................................................................................................................................ 9
9.1 Key Contacts .........................................................................................................................................................9
9.2 Onsite Contacts.....................................................................................................................................................9
10 References ...................................................................................................................................... 9
11 Abbreviations & Definitions ............................................................................................................. 9
12 Appendices.................................................................................................................................... 10
Appendix 1 – Traffic Plans................................................................................................................................................10
Page 3 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

Appendix 2 – Detour Map................................................................................................................................................10


Appendix 3 – Road Closure Map......................................................................................................................................10
Appendix 4 – Parking Restriction Map.............................................................................................................................10
Appendix 5 – Heavy Vehicle Detour Map ........................................................................................................................10
Appendix 6 – Pedestrian Detour Map .............................................................................................................................10
Appendix 7 – Cyclists Detour Map ...................................................................................................................................10
Appendix 8 – <insert title>...............................................................................................................................................10
Appendix 9 – <insert title>...............................................................................................................................................10
Appendix 10 – <insert title>.............................................................................................................................................10

Page 4 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

1 Overview
1.1 Introduction
<insert information on the detail the TMP will address>

1.2 Purpose of this Plan


The purpose of this Traffic Management Plan (TMP) is to address the traffic management provisions that will
be implemented in order to execute this plan while minimising disruption to all stakeholders.
This plan can potentially affect, but is not limited to:
• Road users
• Businesses
• Local residents
• Pedestrians
• Cyclists
• Emergency services
• Heavy vehicles
• Public transport

1.3 Legislative Requirements


<insert specific Legislative Requirements specific to the project>

2 Project Overview
<insert overview of the Project>

2.1 Works Overview


The TMP is required for works that include:
• <add roadworks, asphalting,events,etc>

3 Location of Works
The proposed works are on:
<insert street> between <add street to/from> <add direction>
<insert street> between <add street to/from> <add direction>
<insert street> between <add street to/from> <add direction>

3.1 Road Occupancy Approval


<insert relevant information on the approval to occupy the road>

4 Existing Conditions
There <are/are not> any existing works or events in the area that will affect plans detailed in this TMP. The
following works and restrictions have been identified in the area.

Page 5 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

4.1 <add area/location/event>


Impacts identified are:
• <add details>

4.2 <add area/location/event>


Impacts identified are:
• <add details>

4.3 <add area/location/event>


Impacts identified are:
• <add details>

5 Project Impacts to Traffic & Transport


5.1 Work Hours
<insert street/s> Closure
Duration: <insert hours> hours
Timing: <insert dates/times>
Date and Times of Works Traffic Plan # (refer to Appendices for detailed plans)

5.2 Operating Conditions


Refer to Traffic Plans in Appendix <insert Appendix #>.

5.3 Impact on Traffic Flow


<insert Traffic Plan #>
The proposed closure <is/is not> expected to cause any traffic delays.
Delays are expected on:
<insert street> between <add street> <add direction>
<insert street> between <add street> <add direction>
<insert street> between <add street> <add direction>

The closure <will/will not> impact on local access. There <will/will not> be a signposted detour.

<insert Traffic Plan #>


The proposed closure <is/is not> expected to cause any traffic delays.
Delays are expected on:
<insert street> between <add street> <add direction>
<insert street> between <add street> <add direction>
<insert street> between <add street> <add direction>
Page 6 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

The closure <will/will not> impact on local access. There <will/will not> be a signposted detour.

5.4 Impacts on Transport


<insert any impact and mitigations on Transport>. The relevant Transport Authorities <have/have not>
been notified of the impacts.

5.5 Parking
Parking for construction vehicles <will/will not> be available on site.

Proposed street parking changes are:


Street Location Direction Current Signage Proposed Signage
<insert street> between <add street> <add direction> <current signage> <new signage>
<insert street> between <add street> <add direction> <current signage> <new signage>

5.6 Emergency Services


Emergency service <will/will not> be impacted by the works. Emergency vehicles <will/will not> be
allowed to continue through the site at all times during the occupation.

Access to the site will be via <insert gate,street & direction> and egress via <insert gate, street &
direction>.

Alternate route for emergency vehicles will be via <insert direction left/right> or refer to <insert Appendix
#> for Emergency Services Map.

5.7 Pedestrians
Pedestrians <will/will not> be managed through or around the worksite. A signposted pedestrian detour
route <will/will not> be in place guiding pedestrians on the preferred route. Refer to <add Traffic Plan # or
Map> for detailed plans.

The crossing located at <insert location> will be moved to <insert location>.

5.8 Cyclists
Cyclists <will/will not> be affected by the works. Cyclists will need to follow the diversion route detailed in
Appendix <insert Appendix #>.

5.9 Heavy Vehicles


Heavy vehicles <will/will not> be suitable for the signposted detour routes. <insert any special
arrangments>. Refer to Appendix <insert Appendix #> for detailed route map.

5.10 Resident/Business Impacts


<Residents and/or Businesses will/will not> be impacted by the Project. <Insert any special arrangments>.

5.11 Construction Site Entry/Exit


Entry to site will be via:
<insert street> at <add street/location> <add direction>
<insert street> at <add street/location> <add direction>
Page 7 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

Exit from site will be via:


<insert street> at <add street/location> <add direction>
<insert street> at <add street/location> <add direction>

6 Traffic Control Devices


6.1 Signage and Infrastructure
Temporary <add roadwork,closure,detour,etc> signposting will be implemented as per the detailed traffic
plans. Refer to Appendix <insert Appendix #> for the detailed plans.

6.2 Line Marking


There <will/will not> be a change to line marking as a result of the works. Any line marking removed during
the works <will/will not> be replaced.

6.3 Speed Zoning


There <will/will not> be a change to the speed limits as a result of the works.

6.4 Intelligent Transport System (ITS) Devices


6.4.1 Traffic Signal Modifications
There <will/will not> be modifications to the operation of traffic signals. Refer to Appendix <insert
Appendix #> for the detailed changes.

6.4.2 Temporary Traffic Signals


There <will/will not> be temporary traffic signals used on this project. Refer to Appendix <insert Appendix
#> for the detailed plans and locations.

6.4.3 Variable Message Signs (VMS)


Variable Message Signs <will/will not> be implemented for the works. Refer to Appendix <insert Appendix
#> for detailed messaging and locations.

6.4.4 Radar Activated Speed Signs


Radar activated speed signs <will/will not> be implemented for the works. Refer to Appendix <insert
Appendix #> for detailed plans and locations.

6.4.5 Live Tracking Resources


There <will/will not> be live tracking of resources through or around the site.

6.3 Incident Response / Management


There <will/will not> be incident response provided for the Project. The response will include:
• <insert details>
• <insert details>

7 Risk Assessment
<insert assessment/s>

Page 8 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

8 Communications Strategy
8.1 Worksite Communications
There <will/will not> be two-way radio communications throughout the worksite to assist with traffic
management of vehicles travelling into, through and/or around the worksite.

8.2 Stakeholder Works Notifications


Notifications <will/will not> be provided to all impacted stakeholders.

8.3 Emergency Services Notification


Emergency Services will be informed in a timely manner of relevant activities proposed within this TMP.
Regular updates will be provided to emergency services, including changes to road network configurations,
changes to road conditions and worksite access locations.

9 Contact Details
9.1 Key Contacts
Name Position Contact #

9.2 Onsite Contacts


Name Position Contact #

10 References
This TMP has been prepared with reference to the following documents:
• <insert document reference>

11 Abbreviations & Definitions


Abbreviation Definition

Page 9 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |
<INSERT LOGO>

12 Appendices
Appendix 1 – Traffic Plans

Traffic Plan Index


2nd to 11th
<add Dates/Times>

• <add Traffic Plan #>


• <add Traffic Plan #>
• <add Traffic Plan #>

<add Dates/Times>

• <add Traffic Plan #>


• <add Traffic Plan #>
• <add Traffic Plan #>

Appendix 2 – Detour Map

Appendix 3 – Road Closure Map

Appendix 4 – Parking Restriction Map

Appendix 5 – Heavy Vehicle Detour Map

Appendix 6 – Pedestrian Detour Map

Appendix 7 – Cyclists Detour Map

Appendix 8 – <insert title>

Appendix 9 – <insert title>

Appendix 10 – <insert title>

Page 10 of 10
<Add TMP Number> | <Add Details of Works> | [Publish Date] | Printed copies are uncontrolled |