Lecture 3 - WMS
Lecture 3 - WMS
CPA703
2. Waste Management
▪ Issues of Waste Management
▪ Waste Management Hierarchy
▪ Waste Minimization Strategies
▪ Challenges
3. Government Initiatives
4. Lean Construction
▪ History of Lean
▪ Principles and Key Concepts
▪ Obstacles in implementing Lean
Page 2
.:Introduction to Construction Industry:.
Page 3
What is Construction Industry?
Embraces a wide range of integrated organizations that construct, alter and repair
of building and civil engineering structures
Page 4
Scenarios of Construction Industry
LINEAR ECONOMY
Page 5
26,000 tonnes of construction Issues of illegal dumping Environmental impacts –
wastes were generated daily resource depletion, global
warming, high pollution levels
“As today’s consumer society has expanded, so has the consumption of resources and the waste it
produces. Domestic waste, industrial waste… the population of the EU throws away 2.7 billion
tonnes of it every year, of which 98 million tonnes are hazardous. The greatest waste stream
comes from construction and demolition waste”
(European Commission, 2014)
Page 6
Construction Vs Environment
Page 7
.:Waste Management:.
Page 8
What is Waste?
Construction and demolition waste can be defined as…..
“….the wastes generated from construction processes in which needed to be transported elsewhere from the
construction site or used on the site itself other than the intended specific purpose of the project”.
A lack of an industry norm or performance standard for managing waste causing uncertainty and confusion among
operatives about waste management relative importance.
(Teo & Loosemore, 2001)
An effective material control strategy should be implemented to control wastage during the life cycle of the construction
process.
(C.-S. Poon et al., 2004)
A proper method/strategy is an urgent demand to improve construction management to realize the mission of
sustainable development.
(Yang et al., 2007)
A lack of consideration given to waste reduction during planning and design stage, well-established waste
minimization strategic model and adoption of it will help much on it.
(Ping et al., 2009)
A lack of experience, inadequate planning and scheduling may cause construction waste’s poor management and
handling.
(Nagapan et al., 2012)
Page 9
Source: Pheng & Tan (1997)
Arif et al. (2012) India • Revised and enforced waste management related laws • Procurement
• Confusion among multiple contractors on the construction site to manage the wastes • Construction
• Proper storage location for materials • Design & Planning
Begum et al. (2007) Malaysia • Contractor’s Willingness to Pay (WTP) for an improved CWM • Procurement/Construction
Barlaz et al. (2003) United States • Pay-As-You-Throw (PAYT) scheme requires the construction actors to pay for the • Procurement/Construction
amount of waste that they are going to produce
Tam and Tam (2008) Hong Kong • A Stepwise Incentive System (SIS) is an award given to those who are producing lower • Design & Planning
waste levels
Yu et al. (2013) Hong Kong • Construction Waste Disposal Charging Scheme (CWDCS) is introduced to encourage • Design & Planning
the construction actors to consider the 3R principles before disposal. • Post-Construction
Gangolells et al. (2014) Spain • On-site sorting technique • Procurement
• Suitable plants such as mobile crusher available on site • Construction/Demolition
• Standardization • Design & Planning
• Teamwork among the stakeholders • Design & Planning
• Reusable elements by considering the future dismantling of components • Design & Planning
Huang et al. (2013) China • Material management should be prioritized to prolong the conservation of raw materials • Design & Planning
and mitigate CO2 emissions.
Low et al. (2014) Singapore • Eco-labelling schemes will attain the idea of sustainable development. • Design & Planning
Ordoñez and Rahe Sweden • Improvement in collaborating and communicating among the stakeholders especially the • Design & Planning
(2013) designers. • Procurement
• Construction
Lachimpadi et al. (2012) Malaysia • The effectiveness of improvising the construction methods; e.g. Industrialized Building • Design & Planning
System (IBS), to minimize waste.
Page 11
Regulations Enhancement Awareness and Mindset Lack of Information
Page 12
.:Government Initiatives:.
Page 13
❑ The introduction of sustainability assessment tools
would promote more environmentally-friendly
construction processes.
❑ Many countries such as the US, UK, Australia,
Singapore and Malaysia have created their own
assessment tools to encourage a more sustainable
construction outcomes.
Page 15
Malaysia has came up with national agenda:-
Page 16
.:Lean Construction:.
Page 17
History of Lean
Page 18
Lean production comprises a variety of production systems that share certain principles,
including:-
▪ waste minimisation;
▪ responsiveness to change;
▪ just-in-time;
Page 19
Lean Construction
Lean concept was integrated in the construction industry in 1992.
“.... the goal of better meeting customer needs while using less of everything” (Howell, 1999)
“.... the practical application of lean manufacturing principles, or lean thinking, to the building environment”
(Lukowski, 2010)
“.... the management and improvement of the construction process to profitability deliver what the customer
needs by eliminating waste in the construction flow by using the right principle, resources and measure to
deliver things right first time” (Yahya and Mohamad, 2011)
Improvement:
Identifying value from the client’s point of view. Revisiting construction
processes seeking to add more value to the client, by reducing waste and
enhancing additional willed features.
Page 23
Example:
Process mapping applications
Improvement:
Value stream mapping of materials and information.
Designing a future value stream mapping, proposing necessary improvements
and identifying adequate tools.
Page 24
Example:
Specific tools applications: visual controls and poka-yoke.
Last planner used to stabilize working flow.
Identifying and minimizing process wastes by using work structuring.
Improvement:
Creating a continuous flow atmosphere, by revisiting work division patterns of
teams and workers.
Adopting standardized work by defining sequence, rhythm and inventory.
Page 25
Example:
Just-in-time applications among trades or for the supply of specific materials.
Improvement:
Conceiving a broad direct communications system for pulling services,
components and materials just when necessary.
Page 26
Example:
Use of quality systems, focusing mainly on process characteristics affecting
product performance.
Improvement:
Designing processes to immediate detection of problems.
Establishing systematic procedures of continuous learning and improvements on
the functional hierarchy base, whenever variations on standardized work
processes are identified.
Page 27
The integration of these key concepts will reduce the accidents and increase the rate of
safety in workplaces. Hence, it will increase the productivity, profit and job satisfaction
of the client due to the commitment of all workers.
Page 28
Page 29
The obstacles are:-
▪ Comfort zone
Page 31
Page 32