Hasil Uji Lab Gor Sukoharjo
Hasil Uji Lab Gor Sukoharjo
Hasil Uji Lab Gor Sukoharjo
ft x 10 (kg/cm')
qc (kg/cm2)
300 350 400 450 500
0 50 100 150 200 250
0
10
Depth (m)
11
12
13
14
15
16
17
18
19
20
21
22
-5 -4 -3 -2 -1 0 1 2 3 4 5
FR = fs/qc (%)
fs (kg/cm2)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
0,20 5,0 9,0 0,40 0,8 8,00
0,40 10,0 15,0 0,50 1,8 5,00
0,60 8,0 16,0 0,80 3,4 10,00
0,80 25,0 36,0 1,10 5,6 4,40
1,00 20,0 28,0 0,80 7,2 4,00
1,20 20,0 26,0 0,60 8,4 3,00
1,40 16,0 24,0 0,80 10,0 5,00
1,60 16,0 25,0 0,90 11,8 5,63
1,80 25,0 38,0 1,30 14,4 5,20
2,00 15,0 30,0 1,50 17,4 10,00
2,20 14,0 24,0 1,00 19,4 7,14
2,40 15,0 30,0 1,50 22,4 10,00
2,60 16,0 25,0 0,90 24,2 5,63
2,80 20,0 30,0 1,00 26,2 5,00
3,00 20,0 28,0 0,80 27,8 4,00
3,20 18,0 25,0 0,70 29,2 3,89
3,40 18,0 28,0 1,00 31,2 5,56
3,60 15,0 28,0 1,30 33,8 8,67
3,80 24,0 34,0 1,00 35,8 4,17
4,00 22,0 28,0 0,60 37,0 2,73
4,20 20,0 28,0 0,80 38,6 4,00
4,40 25,0 34,0 0,90 40,4 3,60
4,60 35,0 45,0 1,00 42,4 2,86
4,80 30,0 42,0 1,20 44,8 4,00
5,00 30,0 38,0 0,80 46,4 2,67
5,20 28,0 38,0 1,00 48,4 3,57
5,40 38,0 50,0 1,20 50,8 3,16
5,60 34,0 48,0 1,40 53,6 4,12
. 5,80 40,0 50,0 1,00 55,6 2,50
6,00 45,0 56,0 1,10 57,8 2,44
6,20 50,0 60,0 1,00 59,8 2,00
6,40 54,0 70,0 1,60 63,0 2,96
6,60 45,0 55,0 1,00 65,0 2,22
6,80 42,0 54,0 1,20 67,4 2,86
CONE PENETRATION TEST (2 TON)
Project : GOR Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-1 Tested by : Ags
Elevation : +99,70 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
7,00 44,0 56,0 1,20 69,8 2,73
7,20 34,0 45,0 1,10 72,0 3,24
7,40 35,0 46,0 1,10 74,2 3,14
7,60 44,0 55,0 1,10 76,4 2,50
7,80 40,0 50,0 1,00 78,4 2,50
8,00 40,0 52,0 1,20 80,8 3,00
8,20 36,0 45,0 0,90 82,6 2,50
8,40 38,0 50,0 1,20 85,0 3,16
8,60 55,0 64,0 0,90 86,8 1,64
8,80 40,0 50,0 1,00 88,8 2,50
9,00 50,0 60,0 1,00 90,8 2,00
9,20 52,0 64,0 1,20 93,2 2,31
9,40 54,0 68,0 1,40 96,0 2,59
9,60 60,0 75,0 1,50 99,0 2,50
9,80 45,0 56,0 1,10 101,2 2,44
10,00 54,0 66,0 1,20 103,6 2,22
10,20 66,0 78,0 1,20 106,0 1,82
10,40 60,0 68,0 0,80 107,6 1,33
10,60 28,0 35,0 0,70 109,0 2,50
10,80 36,0 45,0 0,90 110,8 2,50
11,00 44,0 60,0 1,60 114,0 3,64
11,20 48,0 60,0 1,20 116,4 2,50
11,40 55,0 68,0 1,30 119,0 2,36
11,60 36,0 45,0 0,90 120,8 2,50
11,80 48,0 56,0 0,80 122,4 1,67
12,00 55,0 65,0 1,00 124,4 1,82
12,20 24,0 34,0 1,00 126,4 4,17
12,40 25,0 38,0 1,30 129,0 5,20
12,60 36,0 48,0 1,20 131,4 3,33
12,80 48,0 60,0 1,20 133,8 2,50
13,00 48,0 58,0 1,00 135,8 2,08
13,20 78,0 90,0 1,20 138,2 1,54
13,40 66,0 76,0 1,00 140,2 1,52
13,60 84,0 94,0 1,00 142,2 1,19
CONE PENETRATION TEST (2 TON)
Project : GOR Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-1 Tested by : Ags
Elevation : +99,70 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
13,80 85,0 96,0 1,10 144,4 1,29
14,00 96,0 108,0 1,20 146,8 1,25
14,20 80,0 92,0 1,20 149,2 1,50
14,40 82,0 90,0 0,80 150,8 0,98
14,60 72,0 84,0 1,20 153,2 1,67
14,80 45,0 58,0 1,30 155,8 2,89
15,00 60,0 68,0 0,80 157,4 1,33
15,20 62,0 74,0 1,20 159,8 1,94
15,40 55,0 66,0 1,10 162,0 2,00
15,60 55,0 68,0 1,30 164,6 2,36
15,80 60,0 70,0 1,00 166,6 1,67
16,00 64,0 78,0 1,40 169,4 2,19
16,20 55,0 65,0 1,00 171,4 1,82
16,40 68,0 80,0 1,20 173,8 1,76
16,60 78,0 90,0 1,20 176,2 1,54
16,80 74,0 84,0 1,00 178,2 1,35
17,00 75,0 85,0 1,00 180,2 1,33
17,20 66,0 78,0 1,20 182,6 1,82
17,40 78,0 90,0 1,20 185,0 1,54
17,60 100,0 112,0 1,20 187,4 1,20
17,80 108,0 116,0 0,80 189,0 0,74
18,00 102,0 112,0 1,00 191,0 0,98
18,20 105,0 114,0 0,90 192,8 0,86
18,40 118,0 125,0 0,70 194,2 0,59
18,60 150,0 166,0 1,60 197,4 1,07
18,80 142,0 154,0 1,20 199,8 0,85
19,00 120,0 130,0 1,00 201,8 0,83
19,20 120,0 132,0 1,20 204,2 1,00
19,40 100,0 108,0 0,80 205,8 0,80
19,60 105,0 118,0 1,30 208,4 1,24
19,80 188,0 198,0 1,00 210,4 0,53
20,00 200,0 210,0 1,00 212,4 0,50
20,20 240,0 250,0 1,00 214,4 0,42
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-2 Tested by : Ags
Elevation : +99,35 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
ft x 10 (kg/cm')
qc (kg/cm2)
300 350 400 450 500
0 50 100 150 200 250
0
10
Depth (m)
11
12
13
14
15
16
17
18
19
20
21
22
-5 -4 -3 -2 -1 0 1 2 3 4 5
FR = fs/qc (%)
fs (kg/cm2)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
0,20 8,0 15,0 0,70 1,4 8,75
0,40 16,0 24,0 0,80 3,0 5,00
0,60 10,0 18,0 0,80 4,6 8,00
0,80 10,0 20,0 1,00 6,6 10,00
1,00 14,0 22,0 0,80 8,2 5,71
1,20 14,0 18,0 0,40 9,0 2,86
1,40 12,0 20,0 0,80 10,6 6,67
1,60 10,0 18,0 0,80 12,2 8,00
1,80 12,0 22,0 1,00 14,2 8,33
2,00 12,0 20,0 0,80 15,8 6,67
2,20 24,0 34,0 1,00 17,8 4,17
2,40 25,0 34,0 0,90 19,6 3,60
2,60 30,0 38,0 0,80 21,2 2,67
2,80 25,0 36,0 1,10 23,4 4,40
3,00 22,0 32,0 1,00 25,4 4,55
3,20 20,0 28,0 0,80 27,0 4,00
3,40 25,0 34,0 0,90 28,8 3,60
3,60 22,0 32,0 1,00 30,8 4,55
3,80 20,0 30,0 1,00 32,8 5,00
4,00 20,0 28,0 0,80 34,4 4,00
4,20 15,0 30,0 1,50 37,4 10,00
4,40 16,0 25,0 0,90 39,2 5,63
4,60 24,0 34,0 1,00 41,2 4,17
4,80 20,0 30,0 1,00 43,2 5,00
5,00 25,0 36,0 1,10 45,4 4,40
5,20 30,0 38,0 0,80 47,0 2,67
5,40 24,0 36,0 1,20 49,4 5,00
5,60 25,0 36,0 1,10 51,6 4,40
. 5,80 36,0 48,0 1,20 54,0 3,33
6,00 40,0 50,0 1,00 56,0 2,50
6,20 42,0 54,0 1,20 58,4 2,86
6,40 45,0 54,0 0,90 60,2 2,00
6,60 40,0 48,0 0,80 61,8 2,00
6,80 40,0 52,0 1,20 64,2 3,00
CONE PENETRATION TEST (2 TON)
Project : GOR Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-2 Tested by : Ags
Elevation : +99,35 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
7,00 38,0 48,0 1,00 66,2 2,63
7,20 42,0 55,0 1,30 68,8 3,10
7,40 45,0 56,0 1,10 71,0 2,44
7,60 46,0 56,0 1,00 73,0 2,17
7,80 48,0 58,0 1,00 75,0 2,08
8,00 50,0 62,0 1,20 77,4 2,40
8,20 45,0 56,0 1,10 79,6 2,44
8,40 46,0 58,0 1,20 82,0 2,61
8,60 42,0 52,0 1,00 84,0 2,38
8,80 48,0 58,0 1,00 86,0 2,08
9,00 50,0 60,0 1,00 88,0 2,00
9,20 62,0 74,0 1,20 90,4 1,94
9,40 45,0 55,0 1,00 92,4 2,22
9,60 45,0 60,0 1,50 95,4 3,33
9,80 28,0 38,0 1,00 97,4 3,57
10,00 38,0 40,0 0,20 97,8 0,53
10,20 44,0 55,0 1,10 100,0 2,50
10,40 55,0 68,0 1,30 102,6 2,36
10,60 66,0 72,0 0,60 103,8 0,91
10,80 60,0 68,0 0,80 105,4 1,33
11,00 62,0 72,0 1,00 107,4 1,61
11,20 68,0 78,0 1,00 109,4 1,47
11,40 74,0 85,0 1,10 111,6 1,49
11,60 52,0 66,0 1,40 114,4 2,69
11,80 36,0 48,0 1,20 116,8 3,33
12,00 48,0 58,0 1,00 118,8 2,08
12,20 48,0 60,0 1,20 121,2 2,50
12,40 55,0 64,0 0,90 123,0 1,64
12,60 50,0 60,0 1,00 125,0 2,00
12,80 36,0 48,0 1,20 127,4 3,33
13,00 38,0 50,0 1,20 129,8 3,16
13,20 44,0 55,0 1,10 132,0 2,50
13,40 78,0 90,0 1,20 134,4 1,54
13,60 100,0 110,0 1,00 136,4 1,00
CONE PENETRATION TEST (2 TON)
Project : GOR Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-2 Tested by : Ags
Elevation : +99,35 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
13,80 102,0 114,0 1,20 138,8 1,18
14,00 100,0 110,0 1,00 140,8 1,00
14,20 96,0 108,0 1,20 143,2 1,25
14,40 70,0 80,0 1,00 145,2 1,43
14,60 72,0 88,0 1,60 148,4 2,22
14,80 42,0 55,0 1,30 151,0 3,10
15,00 55,0 64,0 0,90 152,8 1,64
15,20 50,0 60,0 1,00 154,8 2,00
15,40 60,0 72,0 1,20 157,2 2,00
15,60 60,0 68,0 0,80 158,8 1,33
15,80 70,0 80,0 1,00 160,8 1,43
16,00 42,0 58,0 1,60 164,0 3,81
16,20 48,0 60,0 1,20 166,4 2,50
16,40 55,0 68,0 1,30 169,0 2,36
16,60 64,0 74,0 1,00 171,0 1,56
16,80 78,0 90,0 1,20 173,4 1,54
17,00 78,0 90,0 1,20 175,8 1,54
17,20 66,0 75,0 0,90 177,6 1,36
17,40 48,0 58,0 1,00 179,6 2,08
17,60 55,0 64,0 0,90 181,4 1,64
17,80 48,0 58,0 1,00 183,4 2,08
18,00 140,0 150,0 1,00 185,4 0,71
18,20 160,0 174,0 1,40 188,2 0,88
18,40 180,0 192,0 1,20 190,6 0,67
18,60 174,0 185,0 1,10 192,8 0,63
18,80 86,0 96,0 1,00 194,8 1,16
19,00 158,0 166,0 0,80 196,4 0,51
19,20 240,0 250,0 1,00 198,4 0,42
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-3 Tested by : Ags
Elevation : +99,50 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
ft x 10 (kg/cm')
qc (kg/cm2)
300 350 400 450 500
0 50 100 150 200 250
0
10
Depth (m)
11
12
13
14
15
16
17
18
19
20
21
22
-5 -4 -3 -2 -1 0 1 2 3 4 5
FR = fs/qc (%)
fs (kg/cm2)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
0,20 5,0 10,0 0,50 1,0 10,00
0,40 10,0 15,0 0,50 2,0 5,00
0,60 10,0 18,0 0,80 3,6 8,00
0,80 8,0 16,0 0,80 5,2 10,00
1,00 8,0 15,0 0,70 6,6 8,75
1,20 6,0 16,0 1,00 8,6 16,67
1,40 6,0 13,0 0,70 10,0 11,67
1,60 10,0 20,0 1,00 12,0 10,00
1,80 16,0 26,0 1,00 14,0 6,25
2,00 18,0 30,0 1,20 16,4 6,67
2,20 15,0 37,0 2,20 20,8 14,67
2,40 15,0 35,0 2,00 24,8 13,33
2,60 18,0 28,0 1,00 26,8 5,56
2,80 22,0 34,0 1,20 29,2 5,45
3,00 24,0 38,0 1,40 32,0 5,83
3,20 20,0 32,0 1,20 34,4 6,00
3,40 18,0 30,0 1,20 36,8 6,67
3,60 18,0 28,0 1,00 38,8 5,56
3,80 22,0 32,0 1,00 40,8 4,55
4,00 25,0 37,0 1,20 43,2 4,80
4,20 24,0 35,0 1,10 45,4 4,58
4,40 25,0 38,0 1,30 48,0 5,20
4,60 20,0 30,0 1,00 50,0 5,00
4,80 24,0 35,0 1,10 52,2 4,58
5,00 24,0 34,0 1,00 54,2 4,17
5,20 25,0 35,0 1,00 56,2 4,00
5,40 28,0 38,0 1,00 58,2 3,57
5,60 30,0 38,0 0,80 59,8 2,67
. 5,80 26,0 38,0 1,20 62,2 4,62
6,00 34,0 45,0 1,10 64,4 3,24
6,20 40,0 52,0 1,20 66,8 3,00
6,40 45,0 54,0 0,90 68,6 2,00
6,60 45,0 58,0 1,30 71,2 2,89
6,80 52,0 64,0 1,20 73,6 2,31
CONE PENETRATION TEST (2 TON)
Project : GOR Sukoharjo Weather : Mendung
Location : Sukaharjo - Jawa Tengah Date : 06/12/19
Test no. : S-3 Tested by : Ags
Elevation : +99,50 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
7,00 58,0 66,0 0,80 75,2 1,38
7,20 48,0 58,0 1,00 77,2 2,08
7,40 48,0 60,0 1,20 79,6 2,50
7,60 52,0 64,0 1,20 82,0 2,31
7,80 55,0 65,0 1,00 84,0 1,82
8,00 60,0 72,0 1,20 86,4 2,00
8,20 55,0 65,0 1,00 88,4 1,82
8,40 52,0 62,0 1,00 90,4 1,92
8,60 62,0 82,0 2,00 94,4 3,23
8,80 68,0 78,0 1,00 96,4 1,47
9,00 72,0 82,0 1,00 98,4 1,39
9,20 54,0 64,0 1,00 100,4 1,85
9,40 52,0 68,0 1,60 103,6 3,08
9,60 66,0 78,0 1,20 106,0 1,82
9,80 34,0 48,0 1,40 108,8 4,12
10,00 40,0 52,0 1,20 111,2 3,00
10,20 45,0 60,0 1,50 114,2 3,33
10,40 48,0 58,0 1,00 116,2 2,08
10,60 66,0 74,0 0,80 117,8 1,21
10,80 74,0 85,0 1,10 120,0 1,49
11,00 55,0 64,0 0,90 121,8 1,64
11,20 100,0 116,0 1,60 125,0 1,60
11,40 164,0 178,0 1,40 127,8 0,85
11,60 200,0 212,0 1,20 130,2 0,60
11,80 240,0 250,0 1,00 132,2 0,42
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Panas
Location : Sukoharjo Date : 27/07/2017
Test no. : S-4 Tested by : Agus
Elevation : +99,40 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
ft x 10 (kg/cm')
qc (kg/cm2)
300 350 400 450 500
0 50 100 150 200 250
0
10
Depth (m)
11
12
13
14
15
16
17
18
19
20
21
22
-5 -4 -3 -2 -1 0 1 2 3 4 5
FR = fs/qc (%)
fs (kg/cm2)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
0,20 5,0 8,0 0,30 0,6 6,00
0,40 20,0 25,0 0,50 1,6 2,50
0,60 40,0 48,0 0,80 3,2 2,00
0,80 32,0 42,0 1,00 5,2 3,13
1,00 25,0 34,0 0,90 7,0 3,60
1,20 10,0 16,0 0,60 8,2 6,00
1,40 12,0 20,0 0,80 9,8 6,67
1,60 10,0 18,0 0,80 11,4 8,00
1,80 14,0 25,0 1,10 13,6 7,86
2,00 15,0 24,0 0,90 15,4 6,00
2,20 25,0 36,0 1,10 17,6 4,40
2,40 40,0 48,0 0,80 19,2 2,00
2,60 28,0 36,0 0,80 20,8 2,86
2,80 34,0 44,0 1,00 22,8 2,94
3,00 30,0 38,0 0,80 24,4 2,67
3,20 24,0 36,0 1,20 26,8 5,00
3,40 20,0 26,0 0,60 28,0 3,00
3,60 18,0 25,0 0,70 29,4 3,89
3,80 10,0 22,0 1,20 31,8 12,00
4,00 10,0 20,0 1,00 33,8 10,00
4,20 15,0 24,0 0,90 35,6 6,00
4,40 15,0 30,0 1,50 38,6 10,00
4,60 24,0 36,0 1,20 41,0 5,00
4,80 20,0 28,0 0,80 42,6 4,00
5,00 20,0 35,0 1,50 45,6 7,50
5,20 24,0 38,0 1,40 48,4 5,83
5,40 25,0 36,0 1,10 50,6 4,40
5,60 36,0 48,0 1,20 53,0 3,33
5,80 40,0 48,0 0,80 54,6 2,00
6,00 42,0 54,0 1,20 57,0 2,86
6,20 44,0 58,0 1,40 59,8 3,18
6,40 45,0 60,0 1,50 62,8 3,33
6,60 55,0 66,0 1,10 65,0 2,00
6,80 32,0 42,0 1,00 67,0 3,13
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Panas
Location : Sukoharjo Date : 27/07/2017
Test no. : S-4 Tested by : Agus
Elevation : +99,40 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
7,00 30,0 38,0 0,80 68,6 2,67
7,20 26,0 36,0 1,00 70,6 3,85
7,40 42,0 48,0 0,60 71,8 1,43
7,60 34,0 44,0 1,00 73,8 2,94
7,80 48,0 55,0 0,70 75,2 1,46
8,00 64,0 78,0 1,40 78,0 2,19
8,20 100,0 112,0 1,20 80,4 1,20
8,40 120,0 134,0 1,40 83,2 1,17
8,60 96,0 101,0 0,50 84,2 0,52
8,80 80,0 90,0 1,00 86,2 1,25
9,00 82,0 96,0 1,40 89,0 1,71
9,20 64,0 80,0 1,60 92,2 2,50
9,40 60,0 70,0 1,00 94,2 1,67
9,60 42,0 50,0 0,80 95,8 1,90
9,80 40,0 50,0 1,00 97,8 2,50
10,00 38,0 48,0 1,00 99,8 2,63
10,20 55,0 68,0 1,30 102,4 2,36
10,40 50,0 62,0 1,20 104,8 2,40
10,60 54,0 68,0 1,40 107,6 2,59
10,80 84,0 98,0 1,40 110,4 1,67
11,00 90,0 100,0 1,00 112,4 1,11
11,20 78,0 88,0 1,00 114,4 1,28
11,40 100,0 112,0 1,20 116,8 1,20
11,60 120,0 130,0 1,00 118,8 0,83
11,80 110,0 118,0 0,80 120,4 0,73
12,00 74,0 86,0 1,20 122,8 1,62
12,20 82,0 94,0 1,20 125,2 1,46
12,40 102,0 114,0 1,20 127,6 1,18
12,60 85,0 98,0 1,30 130,2 1,53
12,80 66,0 78,0 1,20 132,6 1,82
13,00 78,0 90,0 1,20 135,0 1,54
13,20 102,0 114,0 1,20 137,4 1,18
13,40 120,0 130,0 1,00 139,4 0,83
13,60 100,0 112,0 1,20 141,8 1,20
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Panas
Location : Sukoharjo Date : 27/07/2017
Test no. : S-4 Tested by : Agus
Elevation : +99,40 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
13,80 98,0 108,0 1,00 143,8 1,02
14,00 140,0 152,0 1,20 146,2 0,86
14,20 102,0 115,0 1,30 148,8 1,27
14,40 80,0 92,0 1,20 151,2 1,50
14,60 68,0 78,0 1,00 153,2 1,47
14,80 78,0 90,0 1,20 155,6 1,54
15,00 96,0 108,0 1,20 158,0 1,25
15,20 100,0 110,0 1,00 160,0 1,00
15,40 78,0 90,0 1,20 162,4 1,54
15,60 68,0 78,0 1,00 164,4 1,47
15,80 100,0 112,0 1,20 166,8 1,20
16,00 102,0 110,0 0,80 168,4 0,78
16,20 114,0 124,0 1,00 170,4 0,88
16,40 100,0 114,0 1,40 173,2 1,40
16,60 78,0 90,0 1,20 175,6 1,54
16,80 68,0 78,0 1,00 177,6 1,47
17,00 105,0 115,0 1,00 179,6 0,95
17,20 110,0 122,0 1,20 182,0 1,09
17,40 112,0 122,0 1,00 184,0 0,89
17,60 124,0 136,0 1,20 186,4 0,97
17,80 100,0 110,0 1,00 188,4 1,00
18,00 85,0 95,0 1,00 190,4 1,18
18,20 100,0 110,0 1,00 192,4 1,00
18,40 64,0 78,0 1,40 195,2 2,19
18,60 120,0 132,0 1,20 197,6 1,00
18,80 134,0 148,0 1,40 200,4 1,04
19,00 155,0 166,0 1,10 202,6 0,71
19,20 124,0 138,0 1,40 205,4 1,13
19,40 125,0 135,0 1,00 207,4 0,80
19,60 140,0 150,0 1,00 209,4 0,71
19,80 150,0 162,0 1,20 211,8 0,80
20,00 160,0 174,0 1,40 214,6 0,88
20,20 148,0 200,0 5,20 225,0 3,51
20,40 240,0 250,0 1,00 227,0 0,42
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Panas
Location : Sukoharjo Date : 27/07/2017
Test no. : S-5 Tested by : Agus
Elevation : +45,00 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
ft x 10 (kg/cm')
qc (kg/cm2)
300 350 400 450 500
0 50 100 150 200 250
0
10
Depth (m)
11
12
13
14
15
16
17
18
19
20
21
22
-5 -4 -3 -2 -1 0 1 2 3 4 5
FR = fs/qc (%)
fs (kg/cm2)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
0,20 6,0 18,0 1,20 2,4 20,00
0,40 10,0 18,0 0,80 4,0 8,00
0,60 20,0 30,0 1,00 6,0 5,00
0,80 25,0 34,0 0,90 7,8 3,60
1,00 20,0 32,0 1,20 10,2 6,00
1,20 20,0 30,0 1,00 12,2 5,00
1,40 24,0 36,0 1,20 14,6 5,00
1,60 28,0 38,0 1,00 16,6 3,57
1,80 24,0 36,0 1,20 19,0 5,00
2,00 30,0 40,0 1,00 21,0 3,33
2,20 24,0 38,0 1,40 23,8 5,83
2,40 28,0 38,0 1,00 25,8 3,57
2,60 30,0 42,0 1,20 28,2 4,00
2,80 30,0 40,0 1,00 30,2 3,33
3,00 35,0 45,0 1,00 32,2 2,86
3,20 25,0 36,0 1,10 34,4 4,40
3,40 26,0 36,0 1,00 36,4 3,85
3,60 30,0 40,0 1,00 38,4 3,33
3,80 24,0 36,0 1,20 40,8 5,00
4,00 24,0 35,0 1,10 43,0 4,58
4,20 20,0 28,0 0,80 44,6 4,00
4,40 20,0 30,0 1,00 46,6 5,00
4,60 26,0 34,0 0,80 48,2 3,08
4,80 32,0 46,0 1,40 51,0 4,38
5,00 36,0 50,0 1,40 53,8 3,89
5,20 35,0 46,0 1,10 56,0 3,14
5,40 25,0 36,0 1,10 58,2 4,40
5,60 24,0 36,0 1,20 60,6 5,00
5,80 28,0 36,0 0,80 62,2 2,86
6,00 38,0 48,0 1,00 64,2 2,63
6,20 40,0 50,0 1,00 66,2 2,50
6,40 42,0 52,0 1,00 68,2 2,38
6,60 38,0 46,0 0,80 69,8 2,11
6,80 35,0 44,0 0,90 71,6 2,57
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Panas
Location : Sukoharjo Date : 27/07/2017
Test no. : S-5 Tested by : Agus
Elevation : +45,00 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
7,00 35,0 45,0 1,00 73,6 2,86
7,20 24,0 38,0 1,40 76,4 5,83
7,40 54,0 66,0 1,20 78,8 2,22
7,60 66,0 74,0 0,80 80,4 1,21
7,80 45,0 56,0 1,10 82,6 2,44
8,00 50,0 60,0 1,00 84,6 2,00
8,20 42,0 55,0 1,30 87,2 3,10
8,40 40,0 52,0 1,20 89,6 3,00
8,60 54,0 56,0 0,20 90,0 0,37
8,80 60,0 70,0 1,00 92,0 1,67
9,00 60,0 72,0 1,20 94,4 2,00
9,20 55,0 65,0 1,00 96,4 1,82
9,40 48,0 58,0 1,00 98,4 2,08
9,60 50,0 60,0 1,00 100,4 2,00
9,80 55,0 60,0 0,50 101,4 0,91
10,00 48,0 58,0 1,00 103,4 2,08
10,20 45,0 55,0 1,00 105,4 2,22
10,40 45,0 57,0 1,20 107,8 2,67
10,60 44,0 58,0 1,40 110,6 3,18
10,80 42,0 58,0 1,60 113,8 3,81
11,00 40,0 50,0 1,00 115,8 2,50
11,20 38,0 48,0 1,00 117,8 2,63
11,40 35,0 45,0 1,00 119,8 2,86
11,60 32,0 45,0 1,30 122,4 4,06
11,80 35,0 47,0 1,20 124,8 3,43
12,00 35,0 45,0 1,00 126,8 2,86
12,20 40,0 47,0 0,70 128,2 1,75
12,40 48,0 50,0 0,20 128,6 0,42
12,60 48,0 58,0 1,00 130,6 2,08
12,80 70,0 64,0 -0,60 129,4 -0,86
13,00 70,0 85,0 1,50 132,4 2,14
13,20 100,0 112,0 1,20 134,8 1,20
13,40 98,0 108,0 1,00 136,8 1,02
13,60 72,0 84,0 1,20 139,2 1,67
CONE PENETRATION TEST (2 TON)
Project : Kantor Terpadu Kab. Sukoharjo Weather : Panas
Location : Sukoharjo Date : 27/07/2017
Test no. : S-5 Tested by : Agus
Elevation : +45,00 m, ( Selasar Gedung Pendopo dianggap +100,00 m)
Depth qc qc + qf fs ft Fr
2 2 2
(m) kg/cm kg/cm kg/cm kg/cm %
13,80 100,0 112,0 1,2 141,6 1,20
14,00 115,0 128,0 1,3 144,2 1,13
14,20 100,0 115,0 1,5 147,2 1,50
14,40 80,0 95,0 1,5 150,2 1,88
14,60 88,0 98,0 1,0 152,2 1,14
14,80 92,0 105,0 1,3 154,8 1,41
15,00 100,0 112,0 1,2 157,2 1,20
15,20 75,0 86,0 1,1 159,4 1,47
15,40 40,0 52,0 1,2 161,8 3,00
15,60 55,0 70,0 1,5 164,8 2,73
15,80 50,0 62,0 1,2 167,2 2,40
16,00 50,0 60,0 1,0 169,2 2,00
16,20 35,0 48,0 1,3 171,8 3,71
16,40 40,0 55,0 1,5 174,8 3,75
16,60 42,0 54,0 1,2 177,2 2,86
16,80 40,0 52,0 1,2 179,6 3,00
17,00 48,0 58,0 1,0 181,6 2,08
17,20 78,0 90,0 1,2 184,0 1,54
17,40 88,0 100,0 1,2 186,4 1,36
17,60 124,0 134,0 1,0 188,4 0,81
17,80 138,0 150,0 1,2 190,8 0,87
18,00 166,0 178,0 1,2 193,2 0,72
18,20 178,0 190,0 1,2 195,6 0,67
18,40 200,0 215,0 1,5 198,6 0,75
18,60 245,0 255,0 1,0 200,6 0,41
GEOLOGICAL DRILL
LOG NO. BOR : BH-
PROYEK Kantor Terpadu Kabupaten Kedalaman 40 M Elevasi permukaan tanah
Sukoharjo
LOKASI Sukoharjo - Jawa Tengah
Koordinat Inklinasi lubang bor Vertikal
titik bor
Rerata Perolehan Inti
Tanggal selesai : 28 Juli 2017 Operator bor Jamal Geologis lapangan Anung Priyoko, ST.
Tanggal Mulai : 24 Juli 2017
(%)
Kolom Litologi
Contoh tanah
Kedalamam
Kedalaman (m)
Pelapukan Kekompakan Kekerasan Konsistensi Recovery Test
Tanggal
(m)
(%)
Kedalaman
Kepadatan
(m)
(m)
Kedalaman
Length (cm)
N-SPT
Agak kompak
Lapuk semua
Sangat keras
Sangat padat
Lapuk ringan
Sangat lepas
sangat lunak
Kaku Sangat
Segar Lepas
Lapuk tinggi
Lunak Agak
tanah/batuan
Agak lepas
kaku Keras
lunak Agak
(m)
Kompak
Sedang
Sedang
Sangat
K (cm/sec) (S pukulan/30cm)
Lunak
Lapuk
Keras
%
Padat
keras
lepas
0 50 100 0 100
N1 N2 N3 N 10 20 30 40 50
80
Coklat plastis, sedikit pasiran
Lempung 1.50
1,00
1.00
1.50 80
2,00
2,00
2 5 7 12
90 2,45
3,00
24 Juli 2017
4,00 4,00
2 4 5 9
90 4,45
5,00
90
6,00 6,00
3 5 7 12
90 6,45
7,00
Abu-abu, sangat plastis
Lempung 5.00
90
8,00 8,00
3 5 8 13
90 8,45
9,00
90
10,00 10,00
4 7 11 18
90 10,45
11,00
25 Juli 2017
12,00 12,00
4 6 9 15
12,45
90
13,00
90
Coklat, plastis
Lempung
14,00 1.50 14,00 6 7 8 15
90 14,45
15,00
80
Abu-abu kecoklatan, butiran seragam
Pasir Kasar 1.50
16,00 16,00
4 7 9 16
16.50 80 16,45
17,00
18,00 18,00
3 5 6 11
90 18,45
90
20,00 20,00
5 9 14 23
90
20,45
21,00
90
22,00 22,00
6 7 16 23
90 22,45
90
24.00
24,00 8 13 20 33
90 24,45
25.00
80
27 Juli 2017
27,00
27.20
70
Pasir halus rekat 0.80 Kuning kecoklatan, kepadatan sedang
28,00
28,45
8 9 13 22
Abu-abu, butiran sseragam, kepadatan 80 28,45
Pasir halus rekat 1.00 sedang
29,00
30,00
30,00 6 8 14 22
80
Abu-abu, butiran seragam, kepadatan 30,45
Pasir kasar 1.50
31,00
70
31.50
32,00
33,00
70
35.00
70
36.00
36,00 11 18 33 51
GEOLOGICAL DRILL
70
LOG NO. BOR : BH-
36,45
37,00
70
Pasir halus rekat 5.00 Abu-abu kehijauan, sangat padat
38,00 38.00
70 38,45 25 5/1 - >60
39,00
70
40,00 40.00
EOH
40.45 5/1 - - >60
GEOLOGICAL DRILL
LOG NO. BOR : BH-
PROYEK Kantor Terpadu Kabupaten Kedalaman 40 M Elevasi permukaan tanah
Sukoharjo
LOKASI Sukoharjo - Jawa Tengah
Koordinat Inklinasi lubang bor Vertikal
titik bor
Rerata Perolehan Inti
(%) Tanggal Mulai : 29 Juli 2017 Tanggal selesai : 2 Agustus 2017 Operator bor Jamal Geologis lapangan Anung Priyoko, ST.
Kolom Litologi
Kedalaman (m)
Recovery Test
(m)
(m)
(%)
Kedalaman
Kepadatan
Jenis Tanah/batuan Deskripsi Relatif
(m)
Kedalaman
Length (cm)
N-SPT
Agak kompak
Lapuk semua
Sangat keras
Sangat padat
Lapuk ringan
Sangat lepas
sangat lunak
Kaku Sangat
Segar Lepas
Lapuk tinggi
Lunak Agak
tanah/batuan
Agak lepas
kaku Keras
lunak Agak
(m)
Kompak
Sedang
Sedang
Sangat
K (cm/sec) (S pukulan/30cm)
Lunak
Lapuk
Keras
%
Padat
keras
lepas
0 50 100 0 100
N1 N2 N3 N 10 20 30 40 50
80
Coklat plastis, sedikit pasiran
Lempung 1.80
1,00
1.00
80
1.80
2,00
2,00
3 6 8 14
80 2,45
29 Juli 2017
3,00
4,00 4,00
2 4 6 10
80 4,45
5,00
80
6,00 6,00
4 6 8 14
80 6,45
7,00
8,00 8,00
4 6 9 15
80 8,45
9,00
80
30 Juli 2017
10,00 10,00
5 7 12 19
70 10,45
10.50
11,00
12,00 12,00
6 8 13 21
12,45
12.50 70
1.00 Coklat
Pasir halus rekat
13,00
70
14,00
Lempung 2.50 Coklat, sangat plastis 14,00 6 7 8 15
80 14,45
15,00
80
17,00
17.50 90
18,00 18,00
3 5 6 11
90 18,45
Lempung 2.50
Abu-abu kecoklatan, plastis
19,00
90
20,00 20,00
4 8 14 22
Pasir kasar 1.00 Coklat, butiran seragam 80
20,45
21,00
22,00
5 9 15 24
Coklat tua, sangat plastis 90
Lempung 1.00 22,45
23,00
Lempung 1.00 90
Coklat, sangat plastis
24.00
01 Agustus 2017
24,00
7 13 19 32
Pasir halus rekat 1.00 Hijau kecoklatan 80 24,45
25.00
70
Abu-abu, sangat plastis
Lempung 1.50
26.00 26,00 8 16 24 40
70
26.50 26,45
27,00
29,00
Coklat, padat
Pasir halus rekat 2.00
70
30,00
30,00 15 19 22 41
70
30,45
31,00
70
Coklat, padat
Pasir halus rekat 4.00
32,00 32,00
15 18 23 41
70 32,45
33,00
02 Agustus 2017
70
34.00
34,00 12 16 31 47
Pasir halus rekat 1.00 Coklat kehijauan, padat 70 34,45
35.00
70
36.00
37,00
GEOLOGICAL DRILL
LOG NO. BOR : BH-
36,00 5/1 - - >60
70
36,45
70
Pasir halus rekat 5.00 Abu-abu kehijauan, sangat padat
38,00
38.00
4/1 - - >60
60 38,45
39,00
60
40,00 40.00
EOH
40.45 5/1 - - >60
SUMMARY OF LABORATORY TEST RESULTS
Project : Pembangunan Kantor Terpadu Kabupaten Sukoharj0 Made by : Wiw
Location : Sukoharjo - Jawa Tengah Checked by : Hch
Test Dept Moistur Specific Liquid Plastic Plastici Liquidi Void Degree Finer Coef. of Classi- Strength Coefisient of Consolidation
hm e ty ty of ficcatio Parameters Test
Point Gravity Limit Limit Rati # Gradation Bulk den- Dry den- Permeability
content Index Index oe Saturation 200 n sity, 3 o 2 2
No Gs LL, (%) PL, (%) Cc Cu q (kg/cm ) cm/sec
wN, (%) PI, (%) LI, (%) (%) Unified (gr/cm3) sity, (gr/cm ) j c (kg/cm )
Sr, (%)
BH-1 1,50-2,00 40,83 2,61 62,11 33,79 28,32 0,22 1,09 97,91 82,77 MH 1,76 1,25 1,13 1,66E-08
BH-1 3,00-3,50 51,21 2,61 94,62 44,51 50,12 0,13 1,22 100,00 91,46 MH 1,78 1,18 1,45 2,43E-08
BH-1 5,50-6,00 44,19 2,59 91,19 44,58 46,61 -0,01 1,11 100,00 91,06 MH 1,77 1,23 1,81 2,47E-08
BH-1 7,50-8,00 45,63 2,64 72,31 42,56 29,75 0,10 1,49 80,74 88,38 MH 1,76 1,21 0,94 3,06E-08 0,491 0,060
BH-1 9,50-10,00 48,30 2,52 75,38 39,53 35,85 0,24 1,14 100,00 77,79 MH 1,75 1,18 1,71 3,06E-08 0,350 -
BH-1 11,50-12,00 49,36 2,58 70,57 42,52 28,05 0,24 1,18 100,00 78,00 MH 1,77 1,19 0,53 6,26E-08
BH-1 13,50-14,00 46,17 2,60 71,82 45,01 26,82 0,04 1,11 100,00 76,36 MH 1,78 1,22 0,44 6,72E-08 0,310 -
BH-2 2,00-2,50 38,91 2,61 65,11 34,92 30,20 38,91 1,06 95,81 85,14 MH 1,76 1,27 1,01 2,43E-08
BH-2 3,50-4,00 51,47 2,58 79,04 38,63 40,41 0,32 1,35 98,22 93,77 MH 1,75 1,16 1,61 2,70E-08 0,412 0,066
BH-2 5,50-6,00 43,38 2,55 88,78 67,92 20,86 -1,18 1,06 100,00 87,35 MH 1,74 1,21 0,72 2,03E-08 0,303 0,069
BH-2 7,50-8,00 41,32 2,55 62,68 35,09 27,58 0,23 1,02 100,00 90,21 MH 1,78 1,26 1,68 7,83E-08
BH-2 9,50-10,00 43,89 2,44 66,04 42,14 23,90 0,07 0,96 100,00 63,46 MH 1,79 1,24 0,66 2,43E-08
BH-2 11,50-12,00 28,63 2,74 NON PLASTIC 0,98 80,04 31,21 SM 1,78 1,38 25,94 0,04 8,36E-07
BH-2 13,50-14,00 44,80 2,45 86,86 43,18 43,68 0,04 1,00 100,00 84,70 MH 1,76 1,22 1,45 2,43E-08 0,300 -
1 Can no. 1 2
2 Mass of can M1 gram 4.68 4.70
3 Mass of wet soil + can M2 gram 81.90 85.10
4 Mass of dry soil + can M3 gram 59.50 61.80
5 Mass of moisture (M2-M3) gram 22.40 23.30
6 Mass of dry soil (M3-M1) gram 54.82 57.10
7 Water content, w [(M2-M3)/(M3-M1)]x100% 40.86 40.81
8 Average water content, w 40.83
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.56 4.80
3 Mass of wet soil + can M2 gram 88.10 79.50
4 Mass of dry soil + can M3 gram 59.70 54.30
5 Mass of moisture (M2-M3) gram 28.40 25.20
6 Mass of dry soil (M3-M1) gram 55.14 49.50
7 Water content, w [(M2-M3)/(M3-M1)]x100% 51.51 50.91
8 Average water content, w 51.21
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.51 4.55
3 Mass of wet soil + can M2 gram 73.60 79.70
4 Mass of dry soil + can M3 gram 52.40 56.70
5 Mass of moisture (M2-M3) gram 21.20 23.00
6 Mass of dry soil (M3-M1) gram 47.89 52.15
7 Water content, w [(M2-M3)/(M3-M1)]x100% 44.27 44.10
8 Average water content, w 44.19
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.79 4.81
3 Mass of wet soil + can M2 gram 60.90 71.20
4 Mass of dry soil + can M3 gram 43.40 50.30
5 Mass of moisture (M2-M3) gram 17.50 20.90
6 Mass of dry soil (M3-M1) gram 38.61 45.49
7 Water content, w [(M2-M3)/(M3-M1)]x100% 45.33 45.94
8 Average water content, w 45.63
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.84 4.74
3 Mass of wet soil + can M2 gram 76.70 67.10
4 Mass of dry soil + can M3 gram 53.40 46.70
5 Mass of moisture (M2-M3) gram 23.30 20.40
6 Mass of dry soil (M3-M1) gram 48.56 41.96
7 Water content, w [(M2-M3)/(M3-M1)]x100% 47.98 48.62
8 Average water content, w 48.30
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.80 4.81
3 Mass of wet soil + can M2 gram 67.40 68.40
4 Mass of dry soil + can M3 gram 46.70 47.40
5 Mass of moisture (M2-M3) gram 20.70 21.00
6 Mass of dry soil (M3-M1) gram 41.90 42.59
7 Water content, w [(M2-M3)/(M3-M1)]x100% 49.40 49.31
8 Average water content, w 49.36
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.80 4.85
3 Mass of wet soil + can M2 gram 81.90 75.90
4 Mass of dry soil + can M3 gram 57.50 53.50
5 Mass of moisture (M2-M3) gram 24.40 22.40
6 Mass of dry soil (M3-M1) gram 52.70 48.65
7 Water content, w [(M2-M3)/(M3-M1)]x100% 46.30 46.04
8 Average water content, w 46.17
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.70 4.67
3 Mass of wet soil + can M2 gram 73.60 69.30
4 Mass of dry soil + can M3 gram 54.30 51.20
5 Mass of moisture (M2-M3) gram 19.30 18.10
6 Mass of dry soil (M3-M1) gram 49.60 46.53
7 Water content, w [(M2-M3)/(M3-M1)]x100% 38.91 38.90
8 Average water content, w 38.91
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.73 4.53
3 Mass of wet soil + can M2 gram 68.20 72.10
4 Mass of dry soil + can M3 gram 46.30 49.50
5 Mass of moisture (M2-M3) gram 21.90 22.60
6 Mass of dry soil (M3-M1) gram 41.57 44.97
7 Water content, w [(M2-M3)/(M3-M1)]x100% 52.68 50.26
8 Average water content, w 51.47
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.72 4.68
3 Mass of wet soil + can M2 gram 78.20 70.40
4 Mass of dry soil + can M3 gram 56.10 50.40
5 Mass of moisture (M2-M3) gram 22.10 20.00
6 Mass of dry soil (M3-M1) gram 51.38 45.72
7 Water content, w [(M2-M3)/(M3-M1)]x100% 43.01 43.74
8 Average water content, w 43.38
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.58 4.74
3 Mass of wet soil + can M2 gram 76.50 72.30
4 Mass of dry soil + can M3 gram 55.00 53.00
5 Mass of moisture (M2-M3) gram 21.50 19.30
6 Mass of dry soil (M3-M1) gram 50.42 48.26
7 Water content, w [(M2-M3)/(M3-M1)]x100% 42.64 39.99
8 Average water content, w 41.32
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.61 4.86
3 Mass of wet soil + can M2 gram 71.60 67.40
4 Mass of dry soil + can M3 gram 51.30 48.20
5 Mass of moisture (M2-M3) gram 20.30 19.20
6 Mass of dry soil (M3-M1) gram 46.69 43.34
7 Water content, w [(M2-M3)/(M3-M1)]x100% 43.48 44.30
8 Average water content, w 43.89
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.79 4.89
3 Mass of wet soil + can M2 gram 62.60 85.10
4 Mass of dry soil + can M3 gram 49.20 68.00
5 Mass of moisture (M2-M3) gram 13.40 17.10
6 Mass of dry soil (M3-M1) gram 44.41 63.11
7 Water content, w [(M2-M3)/(M3-M1)]x100% 30.17 27.10
8 Average water content, w 28.63
WATER CONTENT DETERMINATION
1 Can no. 1 2
2 Mass of can M1 gram 4.75 4.59
3 Mass of wet soil + can M2 gram 71.00 84.90
4 Mass of dry soil + can M3 gram 50.30 60.30
5 Mass of moisture (M2-M3) gram 20.70 24.60
6 Mass of dry soil (M3-M1) gram 45.55 55.71
7 Water content, w [(M2-M3)/(M3-M1)]x100% 45.44 44.16
8 Average water content, w 44.80
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 30.17 30.61
3 Mass of dry soil + piknometer M2 gram 44.78 44.41
4 Mass of dry soil + water + piknometer M3 gram 88.50 89.60
5 Mass of water + piknometer M4 gram 79.73 80.88
o
6 Temperature t C 26.50
7 A = M2 - M1 14.61 13.80
8 B = M3 - M4 8.77 8.72
9 C=A-B 5.84 5.08
10 Specific Gravity, G1 = A/C 2.50 2.72
11 Average specific gravity, G1 2.61
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.61
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.19 29.11
3 Mass of dry soil + piknometer M2 gram 46.71 43.91
4 Mass of dry soil + water + piknometer M3 gram 90.60 89.70
5 Mass of water + piknometer M4 gram 79.80 80.55
o
6 Temperature t C 26.50
7 A = M2 - M1 17.52 14.80
8 B = M3 - M4 10.80 9.15
9 C=A-B 6.72 5.65
10 Specific Gravity, G1 = A/C 2.61 2.62
11 Average specific gravity, G1 2.61
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.61
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.81 29.70
3 Mass of dry soil + piknometer M2 gram 44.56 42.93
4 Mass of dry soil + water + piknometer M3 gram 89.30 88.20
5 Mass of water + piknometer M4 gram 80.33 80.13
o
6 Temperature t C 26.50
7 A = M2 - M1 14.75 13.23
8 B = M3 - M4 8.97 8.07
9 C=A-B 5.78 5.16
10 Specific Gravity, G1 = A/C 2.55 2.56
11 Average specific gravity, G1 2.56
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.56
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 28.49 30.06
3 Mass of dry soil + piknometer M2 gram 44.98 43.51
4 Mass of dry soil + water + piknometer M3 gram 89.70 88.60
5 Mass of water + piknometer M4 gram 79.44 80.26
o
6 Temperature t C 26.50
7 A = M2 - M1 16.49 13.45
8 B = M3 - M4 10.26 8.34
9 C=A-B 6.23 5.11
10 Specific Gravity, G1 = A/C 2.65 2.63
11 Average specific gravity, G1 2.64
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.64
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 30.17 30.61
3 Mass of dry soil + piknometer M2 gram 44.71 44.60
4 Mass of dry soil + water + piknometer M3 gram 88.50 89.30
5 Mass of water + piknometer M4 gram 79.73 80.88
o
6 Temperature t C 26.50
7 A = M2 - M1 14.54 13.99
8 B = M3 - M4 8.77 8.42
9 C=A-B 5.77 5.57
10 Specific Gravity, G1 = A/C 2.52 2.51
11 Average specific gravity, G1 2.52
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.52
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.19 29.11
3 Mass of dry soil + piknometer M2 gram 44.49 44.89
4 Mass of dry soil + water + piknometer M3 gram 89.20 90.20
5 Mass of water + piknometer M4 gram 79.80 80.55
o
6 Temperature t C 26.50
7 A = M2 - M1 15.30 15.78
8 B = M3 - M4 9.40 9.65
9 C=A-B 5.90 6.13
10 Specific Gravity, G1 = A/C 2.59 2.57
11 Average specific gravity, G1 2.58
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.58
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.81 29.70
3 Mass of dry soil + piknometer M2 gram 43.34 43.84
4 Mass of dry soil + water + piknometer M3 gram 88.70 88.80
5 Mass of water + piknometer M4 gram 80.33 80.13
o
6 Temperature t C 26.50
7 A = M2 - M1 13.53 14.14
8 B = M3 - M4 8.37 8.67
9 C=A-B 5.16 5.47
10 Specific Gravity, G1 = A/C 2.62 2.59
11 Average specific gravity, G1 2.60
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.60
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 30.16 30.61
3 Mass of dry soil + piknometer M2 gram 46.33 45.09
4 Mass of dry soil + water + piknometer M3 gram 89.70 89.70
5 Mass of water + piknometer M4 gram 79.70 80.79
o
6 Temperature t C 26.50
7 A = M2 - M1 16.17 14.48
8 B = M3 - M4 10.00 8.91
9 C=A-B 6.17 5.57
10 Specific Gravity, G1 = A/C 2.62 2.60
11 Average specific gravity, G1 2.61
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.61
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.19 29.10
3 Mass of dry soil + piknometer M2 gram 45.19 45.50
4 Mass of dry soil + water + piknometer M3 gram 89.60 90.60
5 Mass of water + piknometer M4 gram 79.79 80.55
o
6 Temperature t C 26.50
7 A = M2 - M1 16.00 16.40
8 B = M3 - M4 9.81 10.05
9 C=A-B 6.19 6.35
10 Specific Gravity, G1 = A/C 2.58 2.58
11 Average specific gravity, G1 2.58
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.58
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.81 29.70
3 Mass of dry soil + piknometer M2 gram 45.76 45.47
4 Mass of dry soil + water + piknometer M3 gram 90.00 89.30
5 Mass of water + piknometer M4 gram 80.31 79.72
o
6 Temperature t C 26.50
7 A = M2 - M1 15.95 15.77
8 B = M3 - M4 9.69 9.58
9 C=A-B 6.26 6.19
10 Specific Gravity, G1 = A/C 2.55 2.55
11 Average specific gravity, G1 2.55
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.55
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 28.49 30.06
3 Mass of dry soil + piknometer M2 gram 45.57 45.90
4 Mass of dry soil + water + piknometer M3 gram 89.80 89.80
5 Mass of water + piknometer M4 gram 79.39 80.21
o
6 Temperature t C 26.50
7 A = M2 - M1 17.08 15.84
8 B = M3 - M4 10.41 9.59
9 C=A-B 6.67 6.25
10 Specific Gravity, G1 = A/C 2.56 2.53
11 Average specific gravity, G1 2.55
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.55
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 30.16 30.61
3 Mass of dry soil + piknometer M2 gram 46.81 46.51
4 Mass of dry soil + water + piknometer M3 gram 89.50 90.20
5 Mass of water + piknometer M4 gram 79.70 80.79
o
6 Temperature t C 26.50
7 A = M2 - M1 16.65 15.90
8 B = M3 - M4 9.80 9.41
9 C=A-B 6.85 6.49
10 Specific Gravity, G1 = A/C 2.43 2.45
11 Average specific gravity, G1 2.44
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.44
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.81 29.70
3 Mass of dry soil + piknometer M2 gram 46.97 46.49
4 Mass of dry soil + water + piknometer M3 gram 91.20 90.40
5 Mass of water + piknometer M4 gram 80.31 79.72
o
6 Temperature t C 26.50
7 A = M2 - M1 17.16 16.79
8 B = M3 - M4 10.89 10.68
9 C=A-B 6.27 6.11
10 Specific Gravity, G1 = A/C 2.74 2.75
11 Average specific gravity, G1 2.74
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.74
water water
SPECIFIC GRAVITY
1 Piknometer no. 1 2
2 Mass of piknometer M1 gram 29.19 29.10
3 Mass of dry soil + piknometer M2 gram 46.36 46.83
4 Mass of dry soil + water + piknometer M3 gram 90.00 91.00
5 Mass of water + piknometer M4 gram 79.79 80.55
o
6 Temperature t C 26.50
7 A = M2 - M1 17.17 17.73
8 B = M3 - M4 10.21 10.45
9 C=A-B 6.96 7.28
10 Specific Gravity, G1 = A/C 2.47 2.44
11 Average specific gravity, G1 2.45
12 o 0.99662
Gwater at t C
13 o
G for 27,5 C = G = (G
o
at t C)/(G
o
at 27.5 C) 2.45
water water
ATTERBERG LIMITS
Project : GOR Sukoharjo Point no. : BH-1
Location : Sukoharjo, Jawa Tengah Made by : Totok
Depth : 1,50-2,00 m Date : 02/08/2017
70
60
50
Water content, %
40
30
20
10 100
25
No. of blows, N
110
100
90
Water content, %
80
70
60
50
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
80
70
Water content, %
60
50
40
10 100
25
No. of blows, N
80
70
Water content, %
60
50
40
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
80
70
60
Water content, %
50
40
30
20
10 100
25
No. of blows, N
80
70
60
Water content, %
50
40
30
20
10 100
25
No. of blows, N
100
90
80
Water content, %
70
60
50
10 100
25
No. of blows, N
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 17,23 %
Silt/Clay = 82,77 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 1,45 %
Sand = 7,10 %
Silt/Clay = 91,46 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 8,91 %
Silt/Clay = 91,09 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 11,62 %
Silt/Clay = 88,38 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 22,21 %
Silt/Clay = 77,79 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 22,00 %
Silt/Clay = 78,00 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 23,64 %
Silt/Clay = 76,36 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 14,86 %
Silt/Clay = 85,14 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 6,23 %
Silt/Clay = 93,77 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 1,92 %
Sand = 10,74 %
Silt/Clay = 87,35 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 9,79 %
Silt/Clay = 90,21 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 36,54 %
Silt/Clay = 63,46 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,28 %
Sand = 68,51 %
Silt/Clay = 31,21 %
- - - - -
GRAIN SIZE ANALYSIS
Description of soil
Sand
Gravel Fines
Coarse to medium Fine
No.40
No.10
3/8 in.
No.4
No.200
No.60
= Mechanical analysis
= Hydrometer analysis
100
90
80
70
Percent Finer, %
60
50
40
30
20
10
0
10
Gravel = 0,00 %
Sand = 15,30 %
Silt/Clay = 84,70 %
- - - - -
DIRECT SHEAR TEST
Project : GOR Sukoharjo Depth : 13,50-14,00 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Made by : Agus
2
Area = 31,45 cm
Ht. = 2,00 cm
Loading rate = 1.06 mm/minute
3
Volume = 62,91 cm
0,60
0,10
0,00
0 2 4 6 8 10 12
Horizontal displacement, dh mm
Specimen no. 1
Specimen no. 2
Specimen no. 3
1,5
kg/cm2
1,0
t
Shear stress,
0,5
0,0
0 0,5 1 1,5 2
Normal stress, sn kg/cm2
o
Angle of Internal Friction f = 25,94
2
Cohesion c = 0,04 kg/cm
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 1,50-2,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
1,20
1,00
Compression strength :
2
qu = 1,13 kg/cm
0,80
Stress, kg/cm2
0,60
0,40
0,20
0,00
0 2 4 6 8 10 12 14 16 18
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 3,50-4,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
1,60
1,40
2
qu = 1,45 kg/cm
1,00
Stress, kg/cm2
0,80
0,60
0,40
0,20
0,00
0 2 4 6 8
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 5,50-6,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
2,00
1,80
1,60
Compression strength :
1,40
qu = 1,81 kg/cm
2
1,20
Stress, kg/cm2
1,00
0,80
0,60
0,40
0,20
0,00
0 2 4 6 8 10
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 7,50-8,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
1,00
0,90
0,80
Compression strength :
0,70
qu = 0,94 kg/cm
2
0,60
Stress, kg/cm2
0,50
0,40
0,30
0,20
0,10
0,00
0 2 4 6 8 10
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 9,50-8,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
1,80
1,60
1,40
Compression strength :
2
qu = 1,71 kg/cm
1,20
1,00
Stress, kg/cm2
0,80
0,60
0,40
0,20
0,00
0 2 4 6 8 10
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 11,50-12,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
0,60
0,50
Compression strength :
2
qu = 0,53 kg/cm
0,40
Stress, kg/cm2
0,30
0,20
0,10
0,00
0 2 4 6 8
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 13,50-14,00 m
Location : Sukoharjo, Jawa Tengah Date : 31/07/2017
Boring No. : BH-1 Tested by : Ttk
0,50
0,45
0,40
Compression strength :
0,35
qu = 0,44 kg/cm
2
0,30
Stress, kg/cm2
0,25
0,20
0,15
0,10
0,05
0,00
0 2 4 6 8 10
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 2,00-2,50 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Tested by : Agus
1,20
1,00
Compression strength :
2
qu = 1,01 kg/cm
0,80
Stress, kg/cm2
0,60
0,40
0,20
0,00
0 2 4 6 8 10 12
Strain, %
UNCONFINED COMPRESSION TEST
Project : Pemb. Kantor Terpadu Kab. Sukoharjo Depth : 2,00-2,50 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Tested by : Agus
1,80
1,60
1,40
Compression strength :
2
qu = 1,61 kg/cm
1,20
1,00
Stress, kg/cm2
0,80
0,60
0,40
0,20
0,00
0 2 4 6 8 10
Strain, %
UNCONFINED COMPRESSION TEST
Project : GOR Sukoharjo Depth : 5,50-6,00 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Tested by : Agus
0,80
0,70
2
qu = 0,72 kg/cm
0,50
Stress, kg/cm 2
0,40
0,30
0,20
0,10
0,00
0 2 4 6 8 10 12
Strain, %
UNCONFINED COMPRESSION TEST
Project : GOR Sukoharjo Depth : 7,50-8,00 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Tested by : Agus
1,80
1,60
1,40
Compression strength :
2
qu = 1,68 kg/cm
1,20
1,00
Stress, kg/cm 2
0,80
0,60
0,40
0,20
0,00
0 2 4 6 8
Strain, %
UNCONFINED COMPRESSION TEST
Project : GOR Sukoharjo Depth : 9,50-10,00 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Tested by : Agus
0,70
0,60
Compression strength :
0,50
qu = 0,66 kg/cm
2
0,40
Stress, kg/cm 2
0,30
0,20
0,10
0,00
0 2 4 6 8
Strain, %
UNCONFINED COMPRESSION TEST
Project : GOR Sukoharjo Depth : 13,50-14,00 m
Location : Sukoharjo, Jawa Tengah Date : 04/08/2017
Boring No. : BH-2 Tested by : Agus
1,60
1,40
2
qu = 1,45 kg/cm
1,00
Stress, kg/cm 2
0,80
0,60
0,40
0,20
0,00
0 2 4 6 8 10
Strain, %
CONSOLIDATION TEST
PROPERTIES SPECIMEN
2
CLASSIFICATION MH CROSS SECTIONAL AREA A (cm ) 31,67 INIT. WATER CONTENT Wo % 53,53
SPECIFIC GRAVITY (G) 2,64 HEIGHT OF SPECIMEN Ho (cm) 2,00 INITIAL VOID RATIO eo 1,492
LIQUID LIMIT (LL%) 72,31 DRY WEIGHT Wd (gr) 67,09 DEGREE OF INITIAL SAT. So % 94,69
PLASTIC LIMIT (PL%) 42,56 SUBSTANCE HEIGHT Hs (cm) 0,802
GRADATION
PRESSURE Dial reading Change of Ht Change in Void ratio Final Ht. at 1/2 * t90 CV COMPRESSIVE COEFF. OF
OF LOAD
P DP at end of load void ratio e = e' - De end of load Average of STRAIN VOL. COMP.
DH = r - r'
Ht
2 2 r, cm cm De=(DH/Hs) H = H' -DH De% 2
mv (cm /kg)
kg/cm kg/cm d = (H+H')/4
1,4924 2,00 minute cm2 / sec.
0,00
0
1 0,25 0,25 0,0430 0,0430 0,0536 1,4388 1,9570 0,9893 0,3600 0,03842 2,1500 0,0860
2 0,50 0,25 0,0720 0,0290 0,0361 1,4027 1,9280 0,9713 0,4225 0,03156 1,4819 0,0593
3 1,00 0,5 0,1150 0,0430 0,0536 1,3491 1,8850 0,9533 1,3225 0,00971 2,2303 0,0446
4 2,00 1 0,1700 0,0550 0,0685 1,2806 1,8300 0,9288 2,2500 0,00542 2,9178 0,0292
5 4,00 2 0,2450 0,0750 0,0935 1,1871 1,7550 0,8963 1,2100 0,00938 4,0984 0,0205
6 8,00 4 0,3370 0,0920 0,1147 1,0725 1,6630 0,8545 2,2500 0,00459 5,2422 0,0131
7 2,00 0,3120 -0,0250 -0,0312 1,1036 1,6880 0,8378
8 0,25 0,2650 -0,0470 -0,0586 1,1622 1,7350 0,8558
CONSOLIDATION TEST
Project : GOR Sukoharjo
Location : Sukoharjo, Jawa Tengah
Boring No. : BH-1
Depth : 7,50-8,00 m Date : 06/12/2019
Made by : Ponimin
1,60
CH
1,40
#
#
1,20
Void ratio, e
1,00
0,80
0,60
0,40
0,20
5,00
4,00
cv x 10E-2 cm2/s
3,00
2,00
1,00
0,00
0,1 1,0 10,0 100,0
po' = 0,599
pc' = 2,417
Cr = 0,060
Cc = 0,491
eo = 1,492
CONSOLIDATION TEST
PROPERTIES SPECIMEN
2
CLASSIFICATION MH CROSS SECTIONAL AREA A (cm ) 31,67 INIT. WATER CONTENT Wo % 46,06
SPECIFIC GRAVITY (G) 2,52 HEIGHT OF SPECIMEN Ho (cm) 2,00 INITIAL VOID RATIO eo 1,141
LIQUID LIMIT (LL%) 75,38 DRY WEIGHT Wd (gr) 74,56 DEGREE OF INITIAL SAT. So % 100,00
PLASTIC LIMIT (PL%) 39,53 SUBSTANCE HEIGHT Hs (cm) 0,934
GRADATION
PRESSURE Dial reading Change of Ht Change in Void ratio Final Ht. at 1/2 * t90 CV COMPRESSIVE COEFF. OF
OF LOAD
P DP at end of load void ratio e = e' - De end of load Average of STRAIN VOL. COMP.
DH = r - r'
Ht
2 2 r, cm cm De=(DH/Hs) H = H' -DH De% 2
mv (cm /kg)
kg/cm kg/cm d = (H+H')/4
1,1408 2,00 minute cm2 / sec.
0,00
0
1 0,25 0,25 0,0460 0,0460 0,0492 1,0915 1,9540 0,9885 1,0000 0,01381 2,3000 0,0920
2 0,50 0,25 0,0660 0,0200 0,0214 1,0701 1,9340 0,9720 1,0000 0,01335 1,0235 0,0409
3 1,00 0,5 0,1140 0,0480 0,0514 1,0188 1,8860 0,9550 1,4400 0,00895 2,4819 0,0496
4 2,00 1 0,1710 0,0570 0,0610 0,9577 1,8290 0,9288 4,0000 0,00305 3,0223 0,0302
5 4,00 2 0,2430 0,0720 0,0771 0,8807 1,7570 0,8965 5,2900 0,00215 3,9366 0,0197
6 8,00 4 0,3410 0,0980 0,1049 0,7758 1,6590 0,8540 16,0000 0,00064 5,5777 0,0139
7 2,00 0,2940 -0,0470 -0,0503 0,8261 1,7060 0,8413
8 0,25 0,2260 -0,0680 -0,0728 0,8989 1,7740 0,8700
CONSOLIDATION TEST
Project : GOR Sukoharjo
Location : Sukoharjo, Jawa Tengah
Boring No. : BH-1
Depth : 9,50-10,00 m Date : 06/12/2019
Made by : Ponimin
1,40
1,20
1,00
0,80
Void ratio, e
0,60
0,40
0,20
0,00
1,50
cv x 10E-2 cm2/s
1,00
0,50
0,00
Cc = 0,35
2
po = 0,73 kg/cm
eo = 1,141
CONSOLIDATION TEST
PROPERTIES SPECIMEN
2
CLASSIFICATION MH CROSS SECTIONAL AREA A (cm ) 31,67 INIT. WATER CONTENT Wo % 42,14
SPECIFIC GRAVITY (G) 2,60 HEIGHT OF SPECIMEN Ho (cm) 2,00 INITIAL VOID RATIO eo 1,111
LIQUID LIMIT (LL%) 72,31 DRY WEIGHT Wd (gr) 78,01 DEGREE OF INITIAL SAT. So % 98,61
PLASTIC LIMIT (PL%) 42,56 SUBSTANCE HEIGHT Hs (cm) 0,947
GRADATION
PRESSURE Dial reading Change of Ht Change in Void ratio Final Ht. at 1/2 * t90 CV COMPRESSIVE COEFF. OF
OF LOAD
P DP at end of load void ratio e = e' - De end of load Average of STRAIN VOL. COMP.
DH = r - r'
Ht
2 2 r, cm cm De=(DH/Hs) H = H' -DH De% 2
mv (cm /kg)
kg/cm kg/cm d = (H+H')/4
1,1111 2,00 minute cm2 / sec.
0,00
0
1 0,25 0,25 0,0410 0,0410 0,0433 1,0678 1,9590 0,9898 0,4900 0,02826 2,0500 0,0820
2 0,50 0,25 0,0530 0,0120 0,0127 1,0551 1,9470 0,9765 0,6400 0,02106 0,6126 0,0245
3 1,00 0,5 0,0990 0,0460 0,0486 1,0066 1,9010 0,9620 1,9600 0,00667 2,3626 0,0473
4 2,00 1 0,1630 0,0640 0,0676 0,9390 1,8370 0,9345 6,7600 0,00183 3,3666 0,0337
5 4,00 2 0,2330 0,0700 0,0739 0,8651 1,7670 0,9010 7,8400 0,00146 3,8106 0,0191
6 8,00 4 0,3100 0,0770 0,0813 0,7838 1,6900 0,8643 15,2100 0,00069 4,3577 0,0109
7 2,00 0,2850 -0,0250 -0,0264 0,8102 1,7150 0,8513
8 0,25 0,2420 -0,0430 -0,0454 0,8556 1,7580 0,8683
CONSOLIDATION TEST
Project : GOR Sukoharjo
Location : Sukoharjo, Jawa Tengah
Boring No. : BH-1
Depth : 13,50-14,00 m Date : 06/12/2019
Made by : Ponimin
1,20
1,00
0,80
Void ratio, e
0,60
0,40
0,20
0,00
3,00
2,50
cv x 10E-2 cm2/s
2,00
1,50
1,00
0,50
0,00
0,1 1,0 10,0 100,0
Cc = 0,31
2
po = 1,00 kg/cm
eo = 1,111
CONSOLIDATION TEST
PROPERTIES SPECIMEN
2
CLASSIFICATION MH CROSS SECTIONAL AREA A (cm ) 31,67 INIT. WATER CONTENT Wo % 49,19
SPECIFIC GRAVITY (G) 2,58 HEIGHT OF SPECIMEN Ho (cm) 2,00 INITIAL VOID RATIO eo 1,352
LIQUID LIMIT (LL%) 79,04 DRY WEIGHT Wd (gr) 69,49 DEGREE OF INITIAL SAT. So % 93,89
PLASTIC LIMIT (PL%) 38,63 SUBSTANCE HEIGHT Hs (cm) 0,850
GRADATION
PRESSURE Dial reading Change of Ht Change in Void ratio Final Ht. at 1/2 * t90 CV COMPRESSIVE COEFF. OF
OF LOAD
P DP at end of load void ratio e = e' - De end of load Average of STRAIN VOL. COMP.
DH = r - r'
Ht
2 2 r, cm cm De=(DH/Hs) H = H' -DH De% 2
mv (cm /kg)
kg/cm kg/cm d = (H+H')/4
1,3517 2,00 minute cm2 / sec.
0,00
0
1 0,25 0,25 0,0420 0,0420 0,0494 1,3023 1,9580 0,9895 0,4900 0,02824 2,1000 0,0840
2 0,50 0,25 0,0770 0,0350 0,0412 1,2611 1,9230 0,9703 1,0000 0,01330 1,7875 0,0715
3 1,00 0,5 0,1110 0,0340 0,0400 1,2211 1,8890 0,9530 1,3225 0,00971 1,7681 0,0354
4 2,00 1 0,1790 0,0680 0,0800 1,1412 1,8210 0,9275 7,8400 0,00155 3,5998 0,0360
5 4,00 2 0,2520 0,0730 0,0858 1,0554 1,7480 0,8923 4,0000 0,00281 4,0088 0,0200
6 8,00 4 0,3420 0,0900 0,1058 0,9495 1,6580 0,8515 2,8900 0,00355 5,1487 0,0129
7 2,00 0,2900 -0,0520 -0,0611 1,0107 1,7100 0,8420
8 0,25 0,2580 -0,0320 -0,0376 1,0483 1,7420 0,8630
CONSOLIDATION TEST
Project : GOR Sukoharjo
Location : Sukoharjo, Jawa Tengah
Boring No. : BH-2
Depth : 3,50-4,00 m Date : 06/12/2019
Made by : Ponimin
1,60
CH
#
1,40
#
1,20
Void ratio, e
1,00
0,80
0,60
0,40
3,00
cv x 10E-2 cm2/s
2,00
1,00
0,00
po' = 0,334
pc' = 1,563
Cr = 0,066
Cc = 0,412
eo = 1,352
CONSOLIDATION TEST
PROPERTIES SPECIMEN
2
CLASSIFICATION MH CROSS SECTIONAL AREA A (cm ) 31,67 INIT. WATER CONTENT Wo % 45,04
SPECIFIC GRAVITY (G) 2,45 HEIGHT OF SPECIMEN Ho (cm) 2,00 INITIAL VOID RATIO eo 1,063
LIQUID LIMIT (LL%) 88,78 DRY WEIGHT Wd (gr) 75,24 DEGREE OF INITIAL SAT. So % 100,00
PLASTIC LIMIT (PL%) 67,92 SUBSTANCE HEIGHT Hs (cm) 0,970
GRADATION
PRESSURE Dial reading Change of Ht Change in Void ratio Final Ht. at 1/2 * t90 CV COMPRESSIVE COEFF. OF
OF LOAD
P DP at end of load void ratio e = e' - De end of load Average of STRAIN VOL. COMP.
DH = r - r'
Ht
2 2 r, cm cm De=(DH/Hs) H = H' -DH De% 2
mv (cm /kg)
kg/cm kg/cm d = (H+H')/4
1,0625 2,00 minute cm2 / sec.
0,00
0
1 0,25 0,25 0,0140 0,0140 0,0144 1,0481 1,9860 0,9965 0,2500 0,05614 0,7000 0,0280
2 0,50 0,25 0,0250 0,0110 0,0113 1,0367 1,9750 0,9903 0,3600 0,03850 0,5539 0,0222
3 1,00 0,5 0,0580 0,0330 0,0340 1,0027 1,9420 0,9793 1,9600 0,00691 1,6709 0,0334
4 2,00 1 0,1110 0,0530 0,0547 0,9480 1,8890 0,9578 2,8900 0,00449 2,7291 0,0273
5 4,00 2 0,1720 0,0610 0,0629 0,8851 1,8280 0,9293 2,2500 0,00542 3,2292 0,0161
6 8,00 4 0,2490 0,0770 0,0794 0,8057 1,7510 0,8948 4,0000 0,00283 4,2123 0,0105
7 2,00 0,2080 -0,0410 -0,0423 0,8480 1,7920 0,8858
8 0,25 0,1480 -0,0600 -0,0619 0,9099 1,8520 0,9110
CONSOLIDATION TEST
Project : GOR Sukoharjo
Location : Sukoharjo, Jawa Tengah
Boring No. : BH-1
Depth : 5,50-6,00 m Date : 06/12/2019
Made by : Ponimin
1,20
CH
#
1,00
#
0,80
Void ratio, e
0,60
0,40
0,20
6,00
5,00
cv x 10E-2 cm2/s
4,00
3,00
2,00
1,00
0,00
0,1 1,0 10,0 100,0
po' = 0,466
pc' = 2,519
Cr = 0,069
Cc = 0,303
eo = 1,062
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67 cm2
2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 7200 10800 14400 21600 21600
h2 cm 178,9 178,8 178,7 178,6 178,5
Coefisient of permeability, k cm/sec 1,22E-08 1,83E-08 1,83E-08 1,62E-08 2,03E-08
Average
1,66E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67 cm2
2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,8 178,7 178,6 178,5
Coefisient of permeability, k cm/sec 2,43E-08 2,43E-08 2,43E-08 2,43E-08 2,44E-08
Average
2,43E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67 cm2
2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 46800
h2 cm 178,9 178,8 178,7 178,6 177,6
Coefisient of permeability, k cm/sec 2,43E-08 2,43E-08 2,43E-08 2,43E-08 2,63E-08
Average
2,47E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,7 178,6 178,5 178,4
Coefisient of permeability, k cm/sec 2,43E-08 3,25E-08 3,25E-08 3,04E-08 2,92E-08
Average
3,06E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,7 178,6 178,5 178,4
Coefisient of permeability, k cm/sec 2,43E-08 3,25E-08 3,25E-08 3,04E-08 2,92E-08
Average
3,06E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,8 178,5 178,1 177,9 177,7
Coefisient of permeability, k cm/sec 4,87E-08 7,31E-08 7,31E-08 6,71E-08 6,35E-08
Average
6,26E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,7 178,4 178,2 178 177,7
Coefisient of permeability, k cm/sec 7,30E-08 6,50E-08 6,50E-08 6,10E-08 6,35E-08
Average
6,71E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,8 178,7 178,6 178,5
Coefisient of permeability, k cm/sec 2,43E-08 2,43E-08 2,43E-08 2,43E-08 2,44E-08
Average
2,43E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 46800
h2 cm 178,9 178,8 178,7 178,6 177
Coefisient of permeability, k cm/sec 2,43E-08 2,43E-08 2,43E-08 2,43E-08 3,76E-08
Average
2,70E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,85 178,8 178,7 178,5
Coefisient of permeability, k cm/sec 2,43E-08 1,62E-08 1,62E-08 1,83E-08 2,44E-08
Average
2,03E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 68400
h2 cm 178,7 178,4 178,1 178 170,5
Coefisient of permeability, k cm/sec 7,30E-08 7,31E-08 7,31E-08 6,10E-08 1,11E-07
Average
7,83E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,8 178,7 178,6 178,5
Coefisient of permeability, k cm/sec 2,43E-08 2,43E-08 2,43E-08 2,43E-08 2,44E-08
Average
2,43E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 1800 3600 5400 7200 9000
h2 cm 177,8 175,3 173,4 171,8 170,3
Coefisient of permeability, k cm/sec 5,86E-07 9,22E-07 9,22E-07 8,94E-07 8,68E-07
Average
8,36E-07
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2
PERMEABILITY TEST
Dimensions of sample :
Diameter = 6,35 cm A = 31,67
2
cm2
Sample height = 1,95 cm a = 2,54 cm
L = 1,95 cm
h1 = 179,00 cm
Test no. 1 2 3 4 5
Elapsed Time sec 3600 7200 10800 14400 18000
h2 cm 178,9 178,8 178,7 178,6 178,5
Coefisient of permeability, k cm/sec 2,43E-08 2,43E-08 2,43E-08 2,43E-08 2,44E-08
Average
2,43E-08
Coefisient of permeability, k cm/sec
aL h1
k 2,303 x log
At h2