Rohtak Jind
Rohtak Jind
VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates Pvt Ltd in
NHAI Infrastructure Developers (P) Ltd (JV) association Vedom Engineering Services Pvt
Ltd.
VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates Pvt
NHAI Ltd in association Vedom
Infrastructure Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.
S.No Area of Wt.of Tray Wt.of Tray with Wt. of Material Spraying Rate Specified
Tray (m2) (gm) Sample (gm) (gm) (Kg/10M2) Limit
1
2
3
4
5
6
7
8
9
10
11
12
19
13.2
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Remarks:
National Highways Authority of A Joint Venture of VRC Construction (I) Intercontinental Technocrates Pvt Ltd in
India. Pvt. Ltd & S&P Infrastructure association Vedom Engineering Services Pvt
Developers (P) Ltd (JV) Ltd.
37.5 100
26.5 90-100
19.0 83-99
13.20 54-67
4.75 35-47
2.36 28-35
0.300 9--17
0.075 2--8
Remarks:
Location Tested by
45 100
37.5 92-100
26.5 74-90
13.20 57-71
4.75 37-49
2.36 31-41
0.300 12--20
0.075 4--8
Remarks:
Description 1 2
Weight of Empty Flask (gm)
GMM
AVERAGE GMM
Remarks :
4
###
5
###
6
###
Average Average
7
###
8
###
9
###
Average Average
Sieve size (mm) Weight Retained Cum. Wt. Retained % retained % passing JMF Limits
in gm in gm
Remarks :
Type of layer : (As Per AASHTO T-230 & AASTHO T_310) Testing By :
SIDE: Specified Compaction DBM & BC (Gmm) Equal or More than 92 % Date of Testing:
Core ID Date of Paving Offset Thickness/ SSD Sample Wt. Volume in (cc) Density gm/cc Lab Density
Chainage Depth of core Wt. In Air (g) Wt. in Water (g) % of Compaction
no (m) (g) (gm/cc)
(mm)
SAMPLE CARD
Date of Sample :
Chainage :
Sample Location :
Type of Sample :
Quantity :
Sampled By :
Tests Required :
Reference Code :
Remarks :-
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From Km.
347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana
SAMPLE CARD
Date of Sample :
Chainage :
Sample Location :
Type of Sample :
Quantity :
Sampled By :
Tests Required :
Reference Code :
Remarks :-
Location Tested by
Wt.of dry sample :- gms Wt. of sample after washing :- gms
100
75.0
19.0
4.75
2.00
0.425
0.075
Soil Classification
Gravel (Soil Particles > 4.75 mm)
Sand (Soil Particles < 4.75 mm & >0.075 mm)
a) Coarse Sand (4.75 mm to 2.00 mm)
a) Medium Sand (2.0 mm to 0.425 mm)
a) Fine Sand (0.425 mm to 0.075 mm)
Silt & Clay (Soil Particles < 0.075 mm)
Remarks :-
Specified Limits
Dry Density (gm/cc)
MDD
Activity
(gm/cc)
Emb. Up to 3 meter 1.520
Emb. Height > 3 meter 1.600
Sub-Grade 1.750
Test Method
Method of used Modified
Rammer wt 4.89 Kg.
No. of blows 25 / 55
Moisture content % No. of Layers 5
Remarks :-
ATTERBERG'S LIMIT
As per IS:2720,Part-5
Laboratory Job No. Date Sampled
Type of Material Sampled by
Source Date Tested
Location Tested by
Description Liquid Limit Plastic Limit
Determination No. 1 2 3 4 1 2
No. Of Blows/Penetration in mm
Container No.
Wt. of Container (W1)
Wt. of Container + Wet Soil (W2)
Wt. of Container + Dry Soil (W3)
Wt. of Water (W2 - W3)
Wt. of Dry Material (W3-W1)
(W2 - W3)
×100
Moisture Content (W3-W1)
Average PL
Specified Limits
Activity LL (Max) PL (Max)
EMB/SGD 50 25
GSB 25 6
WMM - 6
Remarks
No of Blows
Remarks :-
Location Tested by
Trial No.
SI. No. Description Unit
1 2
( Vd-Vk )
4 Swell Index = ×100 %
Vk
5 Average %
Remarks :-
Penetration in mm
Calibration Factor :- Standard Piston area :- 19.63 sqcm
CBR value (%)
Penetration Piston Load CBR Reportable value
(mm) (kg) Penetration at (%)
2.5 mm 5.0 mm
2.5
5.0
VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates Pvt Ltd
NHAI Infrastructure Developers (P) Ltd (JV) in association Vedom Engineering
Services Pvt Ltd.
Remarks :-
12.5 100
2.36 0-5
0.600 10-55
0.150 0-6
Pan Wt.
Remarks :-
63.0 50.0
50.0 40.0
40.0 31.5
31.5 25.0
25.0 20.0
20.0 16.0
16.0 12.5
12.5 10.0
10.0 6.3
TOTAL (GMS) A= B= C= D=
Specified Limit :
Remarks :
Location Tested by
Remarks :-
IS Sieve size Weight Retained Cum. Retained Cum. Retained Passing Specification Limits as per
Wt. Mort&h Table 400-13
53.0
100 100
45.0
95 100
22.4
60 80
11.2
40 60
4.75
25 40
2.36
15 30
0.600
8 22
0.075
0 5
WMM Gradation & Curve
100
90 Lower Limit
80 Upper Limit
70
60
50
% of Passing
40
30
20
10
0
0.0 0.1 1.0 10.0 100.0
IS Sieve Size (mm)
Remarks :-
EPC Contractor's Representative Authority Engineer's Representative
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting
Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left
Out In NHDP) In State Of Haryana
75 100 100
53 80 100
26.5 55 90
9.5 35 65
4.75 25 55
2.36 20 40
0.425 10 15
0.075 0 5
GSB Gradation & Curve
100
90
80
Lower Limit Upper Limit
% of Passing
70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
IS Sieve Size (mm)