0% found this document useful (0 votes)
59 views23 pages

Rohtak Jind

Uploaded by

sandeep singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views23 pages

Rohtak Jind

Uploaded by

sandeep singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.

800 Of NH-71 And Connecting Link


From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In
NHDP) In State Of Haryana

Client:- EPC Contractor Authority Engineer

VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates Pvt Ltd in
NHAI Infrastructure Developers (P) Ltd (JV) association Vedom Engineering Services Pvt
Ltd.

COMPRESSIVE STRENGTH OF CONCRETE CUBE (IS : 516)


Location : Date of Casting :
Structure : Date of Testing :
Component : Water-Cement Ratio :
Grade of Concrete : % Admixture (If Any) :
Cement Content (Kg/m3) : Area (mm2) : 22500
Size of Cube (mm) : 150*150*150 Age (Days) :
Avg. Comp.
Weight Density Strength Strength
Testing Date Age of Cube (gm) (gm/cc) Load (KN) (N/mm2) Remarks
(N/mm2)

EPC Contractor Representative Authority Engineer Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana
Client EPC Contractor Authority Engineer

VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates Pvt
NHAI Ltd in association Vedom
Infrastructure Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.

SPRAY RATE OF PRIME COAT/TACK COAT


As Per IS Code : 8887 & IRC : 16
Sample Description : Date of Sampling :
Source : Sampled By :
Location : Date of Testing :
Proposed Use : Tested By :

S.No Area of Wt.of Tray Wt.of Tray with Wt. of Material Spraying Rate Specified
Tray (m2) (gm) Sample (gm) (gm) (Kg/10M2) Limit

1
2
3
4
5
6
7
8
9
10
11
12

EPC Contractor's Representative A.E./Client 's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link
From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In
NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer

A Joint Venture of VRC Construction Intercontinental Technocrates Pvt Ltd in


National Highways Authority of (I) Pvt. Ltd & S&P Infrastructure association Vedom Engineering Services Pvt
India.
Developers (P) Ltd (JV) Ltd.

DRY GRADATION OF AGGREGATE FOR BC (GRADE-II)

(MORT&H TABLE 500-18)


Lab Job No. Date of Sampling
Type of Material Sampled by
Source of Material Date of Testing
Location Tested by
Proposed Use Total Wt.(Gms)

IS Sieve Wt. Cumulative Passing Specification limits


(mm) Retained WT Retained % Retained % % (MORT&H TABLE
(g) 500-10) & JMF

19

13.2

9.5

4.75

2.36

1.18

0.600

0.300

0.150

0.075
Remarks:

Submitted by: Witnessed By :

EPC Contractors Representative Authority Engineers Representative


Name : Name :
Date: Date:
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link
From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP)
In State Of Haryana

Client EPC Contractors Authority Engineer

National Highways Authority of A Joint Venture of VRC Construction (I) Intercontinental Technocrates Pvt Ltd in
India. Pvt. Ltd & S&P Infrastructure association Vedom Engineering Services Pvt
Developers (P) Ltd (JV) Ltd.

DRY GRADATION OF AGGREGATE FOR DBM (GRADE-II)


(MORT&H TABLE 500-10)
Lab Job No. Date of Sampling
Type of Material Sampled by
Source of Material Date of Testing
Location Tested by
Proposed Use Total WT (Gms.)

IS Sieve Wt. Cumulative Passing Specification limits


(mm) Retained WT Retained % Retained % % (MORT&H TABLE
(g) 500-10) & JMF

37.5 100

26.5 90-100

19.0 83-99

13.20 54-67

4.75 35-47

2.36 28-35

0.300 9--17

0.075 2--8
Remarks:

Submitted by: Witnessed By :

EPC Contractors Representative Authority Engineers Representative


Name : Name :
Date: Date:
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link
From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In
NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer

A Joint Venture of VRC Construction Intercontinental Technocrates Pvt Ltd in


National Highways Authority of (I) Pvt. Ltd & S&P Infrastructure association Vedom Engineering Services Pvt
India. Developers (P) Ltd (JV) Ltd.

DRY GRADATION OF AGGREGATE FOR DBM (GRADE-I)


(MORT&H TABLE 500-10)
Lab Job No. Date of Sampling

Type of Material Sampled by

Source of Material Date of Testing

Location Tested by

Proposed Use Total WT (Gms.)

Wt. Specification limits


IS Sieve Retained WT Retained % Cumulative Passing (MORT&H TABLE
(mm) Retained % %
(g) 500-10) & JMF

45 100

37.5 92-100

26.5 74-90

13.20 57-71

4.75 37-49

2.36 31-41

0.300 12--20

0.075 4--8
Remarks:

Submitted by: Witnessed By :

EPC Contractors Representative Authority Engineers Representative


Name : Name :
Date: Date:
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link
From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP)
In State Of Haryana

Client EPC Contractors Authority Engineer

National Highways Authority of Intercontinental Technocrates


VRC Construction (I) Pvt. Ltd & S&P Pvt Ltd in association Vedom
India. Infrastructure Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.

Maximum Specific Gravity of Material Test (GMM)


(AASTHO T - 209, ASTMD 2041)
Sample Description : Date of Sampling :

Source/Location : Date of Testing :

Proposed Use : Sampled By :

Type of Mix : Binder Content :

Description 1 2
Weight of Empty Flask (gm)

Weight of Flask + Sample (gm)

Weight of Flask + Sample + Water (gm)

Wt. of Flask + Water (mm)

GMM

AVERAGE GMM

Remarks :

Checked By: Witnessed By :

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From Km. 347.800 Of NH-71 To
Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana
Client EPC Contractors Authority Engineer
Intercontinental Technocrates Pvt Ltd in
National Highways Authority of India. VRC Construction (I) Pvt. Ltd & S&P Infrastructure Developers
association Vedom Engineering Services Pvt
(P) Ltd (JV)
Ltd.

DBM & BC MIX DESIGN (MARSHALL METHOD)


Source of Sample : Type of Material : Casting Date:
Location : Bulk specific gravity of aggregate, oven-dry basis (Gsb) : Testing Date:
Grade of Bitumen : Specific gravity of Bitumin (Gb): Proving Ring Factor :
Type of Material : Effective specific gravity of composite aggregate (Gse) :
% Bit by Wt of Specimen.in grams Bulk Max. Air voids % % Voids Stability, KG
sp.gr.of sample (VA) VMA filled with
wt.of mix Weight Weight SSD Bulk Density (loose) ((Gmm- 100- Bitumen
Sl. (Gmm) Gmb)/ ((Gmb*Ps) (VFB) Correction Corrected
Sample in air in water Weight volume (Gmb) Reading Measured factor for Flow
No. 100/((Ps/Gse) Gmm)*10 /Gsb) ((VMA-VA)/ Stability
(Pb) (g/cc) +Pb/Gb) 0 VMA)*100 Different (Kg) (mm)
in air (cc) Kg Volume

4
###
5
###
6
###
Average Average

7
###
8
###
9
###
Average Average

EPC Rep… A.E./Client Rep..


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana
Client EPC Contractor Authority Engineer

VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates


NHAI Infrastructure Developers (P) Ltd (JV) Pvt Ltd in association Vedom
Engineering Services Pvt Ltd.

BITUMEN EXTRACTION & GRADATION (ASTM D 2172)


Sample Description: Date of Sampling:
Source: Date of Testing:
Proposed Use: Tested By:
Location: Sample No. :
Sr. Description Sample No. 01 Sample No. 02 Remarks
No.
a Sample No.
b Wt. of Filter paper Before Extraction w3(gm)
c Wt. of Sample Before Extraction w2(gm)
d Wt. of Filter Paper After Extraction w3(gm)
e Wt. of Sample After Extraction w2(gm)
f Wt. of aggregate in Filter Paper w5 = w4 - w3 (gm)
g Wt. of Bitumen Extraction w7=w1-w6(gm)
h % Bitumen content in mix = (w7/w1)x100
I Bitumen content in JME tolerance ±0.3%
Sieve analysis after Extraction Total Weight :

Sieve size (mm) Weight Retained Cum. Wt. Retained % retained % passing JMF Limits
in gm in gm

Remarks :

EPC Contractor's Representative Client/AE's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A
(Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer

National Highways Authority of India. Intercontinental Technocrates Pvt Ltd in


VRC Construction (I) Pvt. Ltd & S&P Infrastructure Developers (P) Ltd (JV) association Vedom Engineering Services Pvt Ltd.

CORE DENSITY TEST -DBM/BC


Location: By Core Cutting / Nuclear Density Gauge Date of Core Cutting:

Type of layer : (As Per AASHTO T-230 & AASTHO T_310) Testing By :

SIDE: Specified Compaction DBM & BC (Gmm) Equal or More than 92 % Date of Testing:

Core ID Date of Paving Offset Thickness/ SSD Sample Wt. Volume in (cc) Density gm/cc Lab Density
Chainage Depth of core Wt. In Air (g) Wt. in Water (g) % of Compaction
no (m) (g) (gm/cc)
(mm)

1 2 3 4 5 6 7 8 (8-7)= 9 (6/9)= 10 11 (10/11X100)=12


1
2
3
4
5
6
7
8
9
10
Remarks :

Submitted by: Witnessed By :

EPC Contractors Representative Authority Engineers Representative


Name : Name :
Date: Date:
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From Km.
347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractor Authority Engineer


Intercontinental Technocrates
NHAI VRC Construction (I) Pvt. Ltd & S&P Infrastructure Pvt Ltd in association Vedom
Developers (P) Ltd (JV) Engineering Services Pvt Ltd.

SAMPLE CARD
Date of Sample :
Chainage :

Sample Location :

Type of Sample :

Quantity :

Sampled By :

Tests Required :

Reference Code :

Remarks :-

EPC Contractor's Representative Authority Engineer's Representative

Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From Km.
347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractor Authority Engineer


NHAI VRC Construction (I) Pvt. Ltd & S&P Infrastructure Intercontinental Technocrates
Developers (P) Ltd (JV) Pvt Ltd in association Vedom

SAMPLE CARD

Date of Sample :

Chainage :

Sample Location :

Type of Sample :

Quantity :

Sampled By :

Tests Required :

Reference Code :

Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer

Intercontinental Technocrates Pvt Ltd


National Highways VRC Construction (I) Pvt. Ltd & S&P
in association Vedom Engineering
Authority of India. Infrastructure Developers (P) Ltd (JV)
Services Pvt Ltd.

GRAIN SIZE ANALYSIS OF SOIL


As per IS 2720,(Part-4)
Laboratory Job No. Date of Sampled
Type of Material Sampled by
Source Date of Tested

Location Tested by
Wt.of dry sample :- gms Wt. of sample after washing :- gms

Wt. Of Material % Cumm. Wt.


IS Sieve % Wt. Retained % Passing Remarks
Retained Retained
(mm)
(gms)

100

75.0

19.0

4.75

2.00

0.425

0.075

Soil Classification
Gravel (Soil Particles > 4.75 mm)
Sand (Soil Particles < 4.75 mm & >0.075 mm)
a) Coarse Sand (4.75 mm to 2.00 mm)
a) Medium Sand (2.0 mm to 0.425 mm)
a) Fine Sand (0.425 mm to 0.075 mm)
Silt & Clay (Soil Particles < 0.075 mm)

Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode
Under Bharatmala (Left Out In NHDP) In State Of Haryana

Client:- EPC Contractor Authority Engineer

VRC Construction (I) Pvt. Ltd & S&P


NHAI Intercontinental Technocrates
Infrastructure Developers (P) Ltd (JV)
Pvt Ltd in association Vedom
Engineering Services Pvt Ltd.

MODIFIED PROCTOR COMPACTION TEST FOR SOIL


As per IS:2720,Part-8
Laboratory Job No. Date of Sampled
Type of Material Sampled by
Source Date of Tested
Location Tested by
Mould No. :- Wt. of Mould (W1) :- Volume of Mould (V) :-
Description Unit Test 1 Test 2 Test 3 Test 4 Test 5 Test 6
Water Added %
Wt. of wet soil+mould,W2 gm
Wt. of wet soil,W3=W2-W1 gm
Wet Density of soil,Yb=W3/V gm/cc
Determination of Moisture Content
Container No
Wt. of Container,W4 gm
Wt. of wet sample+cont, W5 gm
Wt. of dry sample+con, W6 gm
Wt. of water, W7=W5-W6 gm
Wt. of dry sample, W8=W6-W4 gm
Moisture content,w=100*W7/W8 %
Dry Density,Yd=100*Yb(100+w) gm/cc
GRAPH Result From Graph
MDD gm/cc
OMC %

Specified Limits
Dry Density (gm/cc)

MDD
Activity
(gm/cc)
Emb. Up to 3 meter 1.520
Emb. Height > 3 meter 1.600
Sub-Grade 1.750
Test Method
Method of used Modified
Rammer wt 4.89 Kg.
No. of blows 25 / 55
Moisture content % No. of Layers 5
Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana
Client EPC Contractors Authority Engineer
Intercontinental Technocrates Pvt Ltd in
NHAI VRC Construction (I) Pvt. Ltd & S&P
association Vedom Engineering Services
Infrastructure Developers (P) Ltd (JV)
Pvt Ltd.

ATTERBERG'S LIMIT
As per IS:2720,Part-5
Laboratory Job No. Date Sampled
Type of Material Sampled by
Source Date Tested
Location Tested by
Description Liquid Limit Plastic Limit
Determination No. 1 2 3 4 1 2
No. Of Blows/Penetration in mm
Container No.
Wt. of Container (W1)
Wt. of Container + Wet Soil (W2)
Wt. of Container + Dry Soil (W3)
Wt. of Water (W2 - W3)
Wt. of Dry Material (W3-W1)
(W2 - W3)
×100
Moisture Content (W3-W1)
Average PL

Result From Graph


Liquid Limit %
Plastic Limit %
Plasticity Index
Moisture Content

Specified Limits
Activity LL (Max) PL (Max)
EMB/SGD 50 25
GSB 25 6
WMM - 6
Remarks

No of Blows
Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer

Intercontinental Technocrates Pvt


NHAI VRC Construction (I) Pvt. Ltd & S&P
Ltd in association Vedom
Infrastructure Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.

FREE SWELL INDEX


As per IS 2720,(Part-40)
Laboratory Job No. Date of Sampled

Type of Material Sampled by

Source Date of Tested

Location Tested by

Trial No.
SI. No. Description Unit
1 2

1 Wt. of the soil sample gms

2 Volume of soil specimen read from the graduated cc


cylinder filling with distilled water (Vd)

3 Volume of soil specimen read from the graduated cc


cylinder filling with kerosene (Vk)

( Vd-Vk )
4 Swell Index = ×100 %
Vk

5 Average %

Note: Maximum Allowable limit: 50 %

Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From Km. 347.800 Of
NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer


National Highways Authority of VRC Construction (I) Pvt. Ltd & S&P Infrastructure Intercontinental Technocrates Pvt Ltd in association
India. Developers (P) Ltd (JV) Vedom Engineering Services Pvt Ltd.

CALIFORNIA BEARING RATIO


( As per IS 2720, Part - XVl )
Lab. Job No. Date of Sampled
Type of Material Sampled by
Source Date of Tested
Location Tested by
Period of soaking MDD (gm/cc)
Wt. of surcharge OMC (%)
Condition of specimen at test :- Type of Compaction Static/Dynamic
Unit Weight of sample and moisture content Determination
Number of Blows
Soaking Soaking Soaking
Condition of sample
Before After Before After Before After
Mould No Unit
Wt.of mould., W1 gm
Wt.of Wet sample + mould, W2 gm
Wt.of Wet sample, W3 =W2-W1 gm
Volume of mould / sample., V cc
Wet Density of Sample Yb=W3/V gm/cc
Container No.
Wt.of container., W4 gm
Wt.of wet sample + cont., W5 gm
Wt.of dry sample + cont., W6 gm
Wt.of water., W7 = W5 - W6 gm
Wt.of dry sample.,W8 =W6 - W4 gm
Moist. Content, m= W7/W8 x100 %
Dry density of sample Yd=Yb/(100+m)x100 gm/cc
Load - Penetration test data Mould No. :- Mould No. :- Mould No. :-

1) Calibration Factor = kgf Proving Ring Proving Ring Proving Ring


Penetration in mm Dial gauge Load in kg Dial gauge Load in kg Dial gauge Load in kg
Reading Reading Reading
2) Standard Piston area = 19.63 sqcm
0.5
1.0
3) Standard Load
1.5
Penetration Unit St.Load 2.0
in mm in kg/sqcm 2.5
70 4.0
2.5
(1370 kg) 5.0
105 7.5
5
(2055 kg) 10.0
CBR Value at 2.5 mm (%)
CBR Value at 5.0 mm (%)
Average CBR Value at 2.5 mm (%) :- Average CBR Value at 5.0 mm (%) :-
Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting
Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left
Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer


Intercontinental Technocrates Pvt Ltd
National Highways VRC Construction (I) Pvt. Ltd & S&P
in association Vedom Engineering
Authority of India. Infrastructure Developers (P) Ltd (JV)
Services Pvt Ltd.

CALIFORNIA BEARING RATIO


(As per IS 2720, Part-XVI)
Laboratory Job No. Date of Sampled
Type of Material Sampled by
Source Date of Tested
Location Tested by
Period of soaking MDD (gm/cc)
Wt. of surcharge OMC (%)
Condition of specimen at test Type of Compaction Static / Dynomic
Mould No No. of Blows
Load in Kg

Penetration in mm
Calibration Factor :- Standard Piston area :- 19.63 sqcm
CBR value (%)
Penetration Piston Load CBR Reportable value
(mm) (kg) Penetration at (%)
2.5 mm 5.0 mm
2.5
5.0

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer

VRC Construction (I) Pvt. Ltd & S&P Intercontinental Technocrates Pvt Ltd
NHAI Infrastructure Developers (P) Ltd (JV) in association Vedom Engineering
Services Pvt Ltd.

SIEVE ANALYSIS REPORT OF FINE AGGREGATE


( As per IS 2386 , Part - I )
Lab.Job no. Date Of Sampling
Type of Material Sampled by
Source Date of Tested
Location Tested by
Proposed Use Testing Method

Wt of Dry sample before wash through 75 micron sieve :- gms


Wt of Dry sample after wash through 75 micron sieve :- gms

Cum.wt. Cum. Cum. Cum. % Passing as per


IS Sieve Size Wt. Retained Retained Retained Passing Specification Remarks
mm gm gm % % Zone - l Zone - ll Zone - lll
10 100 100 100 Silt Content =
%
4.75 90 - 100 90 - 100 90 - 100
2.36 60 - 95 75 - 100 85 - 100
1.18 30 - 70 55 - 90 75 - 100
Zone =
0.600 15 - 34 35 - 59 60 - 79
0.300 5 - 20 8 -- 30 12 -- 40
F.M =
0.150 0 - 10 0 - 10 0 - 10
0.075 < 3% for Natural Sand &
As per IS 383
< 15% for Crushed sand

Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under
Bharatmala (Left Out In NHDP) In State Of Haryana
Client EPC Contractors Authority Engineer
Intercontinental Technocrates
NHAI VRC Construction (I) Pvt. Ltd & S&P Infrastructure
Pvt Ltd in association Vedom
Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.

SIEVE ANALYSIS REPORT OF COARSE AGGREGATE


( As per IS 2386 , Part - I )
Lab.Job no. Date of Sampled
Type of Material Sampled by
Source Date of Tested
Location Tested by
Proposed Use Testing Method Dry Sieve Analysis
C.A - 20mm
C.A - 10mm
F.A - River Sand
Total wt. gms
Sieve Wt. Cum. Cum. Cum. % Passing as per IS 383
Size Retained Retained Retained Passing

mm ( gm ) ( gm ) % % 40 mm 20 mm 10 mm 20mm Gr. All in


Aggregate
63 100 100 100 100 100

40 85 - 100 100 100 100 100

20 0 - 20 85 - 100 100 95-100 95-100

12.5 100

10 0-5 0 - 20 85 - 100 25-55

4.75 0-5 0 - 20 0-10 30-50

2.36 0-5

0.600 10-55

0.150 0-6

Pan Wt.

Remarks :-

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting
Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left
Out In NHDP) In State Of Haryana
Client EPC Contractor Authority Engineer

NHAI VRC Construction (I) Pvt. Ltd & S&P Intercontinental


Infrastructure Developers (P) Ltd (JV) Technocrates Pvt Ltd

FLAKINESS AND ELONGATION INDICES


(IS : 2386 , PART I)
Sample Location : Date Sampled :
Source of Materials : Date Tested :
Description of Sample : Type of Material :

Sieve Size (mm) Weight of Agg.


Weight of Agg. Retained
Weight Retained Weight of Agg. Passing on Length Guage after
Retained on
(gm) Thickness Guage (gm) retaining on Thickness
Thickness Guage (gm)
Passing Retained Guage (gm)

63.0 50.0
50.0 40.0
40.0 31.5
31.5 25.0
25.0 20.0
20.0 16.0
16.0 12.5
12.5 10.0
10.0 6.3

TOTAL (GMS) A= B= C= D=

Flakiness Indices = {(C / A) } X 100 =

Elongation Indices = { (D / B)} X 100 =

Combined Flakiness and Elongation Indices = {(C / A) + (D / B)} X 100 =

Specified Limit :

Remarks :

EPC Contractors Representative Authority Engineers Representative


Name : Name :
Date: Date:
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting Link From
Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State
Of Haryana

Client EPC Contractors Authority Engineer

Intercontinental Technocrates Pvt Ltd in


NHAI VRC Construction (I) Pvt. Ltd & S&P association Vedom Engineering Services Pvt
Infrastructure Developers (P) Ltd (JV) Ltd.

AGGREGATE IMPACT VALUE TEST


( As per IS 2386, ( Part-lV ) )
Lab Job No. Date of Sampling

Type of Material Sampled by

Source of Material Date of Testing

Location Tested by

Proposed Use Hight of Fall 380 MM +-5 MM

Sl.No. Description No. Of Blows -15 Unit Test 1 Test 2

Weight of surface dry sample passing 12.5 mm. and retained on


1 10 mm. IS sieves,W1 (gm)

2 Weight of fraction passing on 2.36 mm.sieve after the test,W2 (gm)

3 Weight of fraction retained on 2.36 mm.sieve after the test,W3 (gm)


4 Loss in wt. of aggregate W4 = W1 - (W2 + W3 ) (gm)
5 Aggregate Impact Value ( A .I .V.) = ( W2 / W1 ) x 100 %

6 Average value of ( A. I .V.) %

Note :- If W4 > 1 gm., Repeat the test

Remarks :-

Specified Limits As Per Items CONCRETE GSB WMM DBM BC SMA


IS:383 & MoRTH Vth
Reavision Specified Limits (%)
45 30 40 30 27 24 18
Max.

Checked By: Witnessed By :

EPC Contractor's Representative Authority Engineer's Representative


Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And
Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode
Under Bharatmala (Left Out In NHDP) In State Of Haryana
Client EPC Contractors Authority Engineer
Intercontinental Technocrates Pvt Ltd
NHAI VRC Construction (I) Pvt. Ltd & S&P in association Vedom Engineering
Infrastructure Developers (P) Ltd (JV) Services Pvt Ltd.

GRADATION OF WET MIX MACADAM


as per Mort&h Table 400-13
Lab Job No. Date of Sampling

Type of Material Tested by

Source of Material Date of Testing

Location Proposed Use

Total Sample Weight = gms

IS Sieve size Weight Retained Cum. Retained Cum. Retained Passing Specification Limits as per
Wt. Mort&h Table 400-13

(mm) (gms) (gms) (%) (%) Lower Upper

53.0
100 100
45.0
95 100
22.4
60 80
11.2
40 60
4.75
25 40
2.36
15 30
0.600
8 22
0.075
0 5
WMM Gradation & Curve
100
90 Lower Limit
80 Upper Limit
70
60
50
% of Passing

40
30
20
10
0
0.0 0.1 1.0 10.0 100.0
IS Sieve Size (mm)

Remarks :-
EPC Contractor's Representative Authority Engineer's Representative
Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.800 Of NH-71 And Connecting
Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A (Balance Work) On EPC Mode Under Bharatmala (Left
Out In NHDP) In State Of Haryana

Client EPC Contractors Authority Engineer


Intercontinental Technocrates Pvt
NHAI VRC Construction (I) Pvt. Ltd & S&P Ltd in association Vedom
Infrastructure Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.

GRADATION FOR GSB Grade-I


as per MoRT&H Table 400-1
Lab job No. Date of Sampling

Type of Material Sampled by

Source of Material Date of Testing


Location Tested by
Proposed Use Offset From
Total Sample Wt. :- gms

Specification Limits as per


IS Sieve size Weight Retained Cumu. Retained Cumu. Retained Passing MoRT&H Table 400-1

( mm ) ( gms ) ( gms) (%) (%) Lower Limit Upper Limit

75 100 100

53 80 100
26.5 55 90
9.5 35 65
4.75 25 55
2.36 20 40
0.425 10 15
0.075 0 5
GSB Gradation & Curve
100
90
80
Lower Limit Upper Limit
% of Passing

70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
IS Sieve Size (mm)

EPC Contractor's Representative Authority Engineer's Representative


Six Laning of Mandi Dabwali (Punjab / Haryana border) – Chautala Road section from Proposed Mandi
Dabwali Bypass (Design Ch. 27.400) to Chautala(Design Ch. 62.200) of NH-54 under Bharatmala Pariyojna
(Design Length 34.800 km) in the State of Haryana under Hybrid Annuity Mode

Client EPC Contractors Authority Engineer


Intercontinental
VRC Construction (I) Pvt. Ltd & S&P Infrastructure Technocrates Pvt Ltd in
NHAI association Vedom
Developers (P) Ltd (JV)
Engineering Services Pvt Ltd.

FIELD DENSITY TEST BY SAND REPLACEMENT METHOD


(As per IS 2720, Part-28)
RFI NO RFI Dated
Chainage/Location Testing Date
Layer No Tested by
Source of Material MDD (gm/cc)
Bulk Density of Sand,Ys OMC (%)
FIELD DENSITY MEASUREMENT
Pouring Cylinder No
Pit Location Km
Offset from C/L m
Layer thickness mm
Wt. of wet material from hole, Ww gm
Wt. of Sand +Cylinder before pouring,W1 gm
Wt. of Sand +Cylinder after pouring, W2 gm
Wt. of Sand in Cone, W3 gm
Wt, of Sand in hole W4=(W1-W2-W3) gm
Volume of Pit, V=W4/Ys cc
Wet density of material, Yb=(Ww/V) gm/cc
MOISTURE CONTENT:-by dry method
Wt. of wet sample, S1 gm
Wt. of dry sample, S2 gm
Wt of water, W=S1-S2 gm
Moisture content, m=100*w/S2 %
MOISTURE CONTENT:-by Rapid Moisture Metre
Rapid moisture metre No
Moisture Metre Reading %
Calibration Chart Reading %
Moisture content, m %
RESULTS
Dry density,Yd=100*Yb/(100+m) gm/cc
Compaction obtained=(Yd/MDD)*100 %
Average Compaction %
Required Compaction %
Remarks :-

EPC Contractor's Representative Authority Engineer's Representative