Trim and Stability Booklet
Trim and Stability Booklet
Trim and Stability Booklet
-
Vulcano M CLOSES:I)-1/ I.:::HI 1/1
lU RL
: lJLL DUKE 1 l
:
VOLCANO M
ADOR
MEDNAV INTERNATIONAL s L ''
'DERA SPANISH . .
I lO 9251743
I STRUCTOR VULCAN FACTORIES
'\i Al. DlSTlNTIVA ECCA
1.3.-CLASSIFICATION/OH
1.4.-F?EGL.MENTS
The following calculations, carried out by Factoras Vulcano, are based on the rules and requirements of:
amendments
C6digo in force internationally for the construction and equipment of ships carrying hazardous chemicals 1
•
1.5.-REFEREHCIAS
The calculations are carried out using the FORAN version 50 program.
Coordinates origin:
Positive X values: forward of the stern perpendicular
Valon:s And positives: to port
Positive Z values: on the baseline
CamScanner
Machine Translated by Google
FACTORIES 910008-A STABILITY MANUAL AND .
'~ VULCANO, SA DfR. fNGENIERIA
I
Vulcano SfTCICJN
pmyc-c
I>OC. _j IH: V.
I I (1()()00 I 7 I
0-7,\ LOAD AL TERNA DENSITY 0.7 T/M3 !- L:: ,-\ i<Ci -\ II. 7
-I"ilvU LLE ~ . vt\D,' \ l.7S LOAD 0.7 T/\13 S,
\LIIM 1.2 .. \ LOAD AL TERNA
DENSITY I .2 TI\IJ 1.2L LOAD 1.2 T/M3 ARRIVAL 1.2 s
LOAD 1.2 T/M3 OUTPUT
.
·
;: . : ......
•'
\' •
LOADING HANKS
BALLAST ANCHORS ·!:·:··.:.
CamScanner
Machine Translated by Google
FACTORIES 91 0008-A MANUAL 0 E EST AB ILl DAD y 1------=D:......:.I:....:..:R.__,IN_G_E_N:-
~lk VULCANO, SA ffi_Rr.IA :-:-::-:--1 TRIMADO SECCIO!'J TOGETHER
rtl~ l,!c.;
Vulcano M
-GENERAL INFORMATION
GENERAL INSTRUCTIONS
GENERAL INSTRUCTIONS AGAINST CAPSE
FIXED BALLAST
,
OPERATING PROCEDURE REFERRED TO WEATHER CONDITIONS .
STABILITY CONSIDERATIONS
STABILITY RITERIA AND REGULATIONS
MINIMUM REQUIREMENTS FOR INTACT VESSEL0 ,;1;; .;; ,~ ; ...
,..-r·;' • ,J ·, ;: ., .. ~ .. ;• ":·.
STABILITY RELATIONS AFTER BREAKDOWNS ... .-.. \ .
. INIMUM REQUIRED FOR VESSEL YESTERDAY.\ ·. . ,j \t
MAXIMUM ADMISSIBLE MOMENTS . ·• '·.":
INTRODUCTION
RHYME I
TRIMADO 2
TRIMADO 3
RHYME -I
l
RHYME O-
UR VAS KG-MAX
TRIMADO I
IMAGE
MAD03
MAD0-1
IMADO
IMADO I
IMAD0 2
MAD03
RHYME -I
CamScanner
Machine Translated by Google
r- ---------------~-
.. . - .
1
'
~~ Ministry of Hunger
ESPANA
Spain :: iji'JJI &t. General Directorate of Mercantile Manna ..
.-f---· --M -
·,1-, 'JIGO, on 11/20/2003 and in the presence of the authorized Official, the stability tests of the ·~ , ~ u were carried out , in accordance with that established in the
Recognition Regulation of Merchant Ships and Vessels and in the · Mrntstenales of July 29 , 1970.
·
Deck thickness , including the actual thickness of the lining in the vertical of the Free Board: 13 mm.
Maximum load draft 9,500 m. for a Summer Free Board 3912 mm.
STABILITY TEST
Entity that carries out the experience ........................................... ............ IZAR - FERROL
Weights used and their location EIGHT PESOS, FOUR ON EACH BAND (BR. 76.14 TNS AND 77.38 TNS) LOCATED IN CBT.
UPPER BETWEEN FRAMES 70 AND 140
Average distance of translation of the weights ........................................... .............. 20,570 m.
Measured deviations : 1° ............. 272 mm; 2° ............. 276 mm; 3° ............. mm.
Height of the metacenter above the base for the flotation of the experience: ........................ 13.66 m.
Ordinate of the center of gravity on the threaded base (KG): ................................................... .9.30 m.
Abcissa of the Center of Gravity in Thread, from Ia pp (XG): ................................... ..... 62.59 m.
NOTE A.-The drafts cited in the stability report are actual drafts in the markings, which are referred to the lower depth of the keel, making
it necessary to subtract 15 mm. to obtain the layout.
CamScanner