Design Build Contract Completion Checklist
Design Build Contract Completion Checklist
Project No.: -
Project Name:
YES NO Agreement
1) Design/Build Contractor’s Legal Name, Address, and Telephone
Number:
Step 4 DB40
DESIGN/BUILD CONTRACT COMPLETION CHECKLIST
YES NO Agreement
Step 4 DB40
Page 2 of 7
DESIGN/BUILD CONTRACT COMPLETION CHECKLIST
YES NO Agreement
YES NO Agreement
Step 4 DB40
Page 4 of 7
DESIGN/BUILD CONTRACT COMPLETION CHECKLIST
YES NO Agreement
28) State the designated individual for the DB who will receive notices
(default will be President for VP stated in DB’s Proposal):
Step 4 DB40
Page 5 of 7
DESIGN/BUILD CONTRACT COMPLETION CHECKLIST
YES NO Agreement
31) The Project Architect shall inspect the Project at intervals appropriate to
the type and stage of construction progress. Number of Project visits /
month during construction phase:
32) The DB shall conduct a minimum of how many job conferences each
month.
33) The DB shall attend how many full day Partnering sessions:
(Example: one session at beginning of design and one session at
beginning of construction.)
34) The DB Contractor shall prepare a Facility Program as part of
PreConstruction Services
37) State if you require interim record drawings and specs as a requirement
for acceptance of Substantial Completion (to assist Owner in operation
of facility until Final Completion is accomplished.)
Step 4 DB40
Page 6 of 7
DESIGN/BUILD CONTRACT COMPLETION CHECKLIST
List of Exhibits
YES NO N/A
Owner’s Specifications
39) Owner’s Special Conditions with Attachments
40) Attachment “A” - Prevailing Wage Rate Determination
41) Attachment “C” - Project Sign Layout
42) Project Insurance (OCIP)
43) Project Planning and Scheduling
44) Project Administration
45) Project Quality Control
46) Storm Water Management and Controls
47) Project Commissioning
48) Project Close Out Requirements
49) Cast Bronze Dedicatory Plaque
50) PDRI for Buildings
51) Allowable General Conditions Line Items
52) Guaranteed Maximum Price Proposal Form
53) Guidelines for the Preparation of the GMP
54) Payment and Performance Bonds
55) Security Bond Form
56) Construction Manager’s Personnel and Monthly Salary Rate
57) Constructability Implementation Program
58) Policy on Utilization, Historically Underutilized Businesses
59) HUB Subcontracting Plan for Pre-Construction Phase Services
60) Additional Services Proposal
61) Payee Information Form (UT Austin Projects ONLY)
The PM shall turn in the completed checklist with the Agreement to the Contarct Manager for processing
and execution.
Completed By: Date:
Step 4 DB40
Page 7 of 7