The Software Process

 Chapters 3 & 4
Slide Set to accompany
Software Engineering: A Practitioner’s Approach, 8/e
by Roger S. Pressman and Bruce R. Maxim

Slides copyright © 1996, 2001, 2005, 2009, 2014 by Roger S. Pressman

For non-profit educational use only


May be reproduced ONLY for student use at the university level when used in conjunction
with Software Engineering: A Practitioner's Approach, 8/e. Any other reproduction or use is
prohibited without the express written permission of the author.

All copyright information MUST appear if these slides are posted on a website for student
use.

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 1
Agenda
 Software Process Structure
 Process Models

2
Software Process Structure

3
Software Process
 “A process defines who is doing what,
when and how to reach a certain goal.”
Ivar Jacobson, Grady Booch, and
James Rumbaugh

 Process defines the approach that is taken as


software is engineered

 Framework for activities, actions, and tasks


 required to build high-quality software

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 4
Activity, Action and Task
 Activity strives to achieve a broad objective
 Applied regardless of the application domain, size of
the project, complexity of the effort,...
 e.g., modeling, communication, …

 Action encompasses a set of tasks that produce a major


work product
 e.g., architectural design (major product: an architectural
design model).
 Task focuses on a small, but well-defined objective that
produces a tangible outcome
 e.g., conducting a unit test

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 5
A Generic Process Framework
Process framework
Framework activities
work tasks
work products
milestones & deliverables
QA checkpoints
Umbrella Activities

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 6
Framework Activities
VS
Umbrella Activities
 Framework activities are
applicable to all software
projects, regardless of
their size or complexity
 Umbrella activities are
applicable across the
entire software process
 Complement framework
activities
 Applied throughout a
software project

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 7
Framework Activities
 Communication
 Collaborate with the customer and stakeholders
 Intent: to understand objectives and to gather requirements
 Planning
 Software project plan (risks, resources, products, schedules,..)
 Modeling
 Analysis of requirements
 Design
 Construction
 Code generation and Testing
 Deployment
 The software is delivered to the customer
 The customer evaluates the product and provides feedback 8
Notes on Framework Activities
 These five generic framework activities can be
used for the development of different systems
(from small and simple to large and complex)
 The details of the process is quite different in each
case, but the framework activities remain the same
 For many software projects, framework
activities are applied iteratively
 Applied repeatedly through a number of iterations
 Each iteration produces a software increment
 An increment provides a subset of overall features
 Software is gradually completed

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 9
Typical Umbrella Activities
 Software project tracking and control
 Risk management
 Software quality assurance
 Technical reviews
 Measurement
 e.g., lines of code, code complexity, customer satisfaction
score, cycle time, cost variance, schedule variance,…
 Software configuration management
 Reusability management
 Work product preparation and production
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 10
Process Adaptation
 Software process is not a rigid prescription
 It should be adaptable
 to the problem,
 to the project,
 to the team.
 Conclusion:
 A process adopted for one project might be significantly
different than a process adopted for another project

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 11
Adapting a Process Model
 The overall flow of activities, actions, and tasks and the
interdependencies among them
 The degree to which actions and tasks are defined within
each framework activity
 The degree to which work products are identified and
required
 The manner which quality assurance activities are applied
 The manner in which project tracking and control activities
are applied
 The degree to which the customer and other stakeholders
are involved with the project
 The level of autonomy given to the software team
 The degree to which team organization and roles are
prescribed

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 12
Example: Adapting a Task Set
 Action: Requirements gathering
(an important action during the communication activity)
 Task set for a small  Task set for a large and
and simple project complex project
1. Make a list of stakeholders for the project
2. Interview each stakeholder separately to
determine overall needs
3. Build a preliminary list of functions and features
based on stakeholder input
4. Schedule a series of facilitated application
specification meetings
5. Conduct meetings
6. Produce informal user scenarios as part of
each meeting
7. Refine user scenarios based on stakeholder
feedback
8. Build a revised list of stakeholder requirements
9. Prioritize requirements
10. …. 13
Process Flow
(also called work flow)

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 14
Linear Flow
 Linear process flow executes each of the five
framework activities in sequence, beginning
with communication and culminating with
deployment

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 15
Iterative Flow
 Iterative process flow repeats one or more of
the activities before proceeding to the next

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 16
Evolutionary Flow
 Evolutionary process flow iterates the
activities in a “circular” manner
 Each circuit through the five activities leads to
a more complete version of the software

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 17
Parallel Flow
 Parallel process flow executes one or more
activities in parallel with other activities
 For example, modeling for one aspect of the
software might be executed in parallel with
construction of another aspect of the software

a time slot

18
Process Patterns
 A process pattern
 Describes a repeatable process-related problem,
 Identifies the environment in which the problem has
been encountered, and
 Suggests one or more proven solutions to the
problem.
 Each pattern must include:
 Pattern name, intent, type, initial context, problem,
solution, and resulting context
 Example: Pattern name=RequirementsUnclear
 Problem: Requirements are hazy or nonexistent
• stakeholders are unsure of what they want
 Solution: A description of the prototyping process
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 19
Process Pattern Types
 Stage patterns—defines a problem associated
with a framework activity for the process.
 Task patterns—defines a problem associated
with a software engineering action or work
task
 Phase patterns—define the sequence of
framework activities that occur with the
process

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 20
A Sample Process Pattern

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 21
Process Models

22
Process Model
 A specific roadmap for software engineering
It defines the flow of all activities, actions and tasks,
the degree of iteration,
the work products,
and the organization of the work that must be done
 Different process models:
 Traditional models, Evolutionary models, Agile models, …
 Different models are suitable for different projects
 Software process model ≈ Software process ≈
software development methodology ≈
software development life cycle ≈
software development process
23
Prescriptive Models
 Prescriptive process models advocate an orderly approach
to software engineering
 They strive for structure and order in software
development
 Sometimes referred to as “traditional” process models

 Examples: Waterfall, Spiral,…

 Prescriptive process models define a prescribed set of


process elements and a predictable process flow
 Process elements: framework activities, actions, tasks,
work products, quality assurance, and change control
mechanisms
 They prescribe a process flow (also called work flow)

24
The Waterfall Model
Communicat ion
project init iat ion Planning
requirement gat hering estimating Modeling
scheduling
analysis Const ruct ion
tracking
design De ployment
code
t est delivery
support
f eedback

 The waterfalls model, sometimes called the classic life cycle


 A systematic, sequential approach to software development
 The oldest paradigm for software engineering
 A linear process model: progress is flowing steadily
downwards (like a waterfall)

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 25
Problems with Waterfall
1. Real projects rarely follow the sequential flow that the
model proposes
 After-the-fact changes are prohibitively costly (if not
impossible)
2. Difficult for the customer to state all requirements explicitly
3. The customer must have patience
 A working version will not available late

 A major blunder, if undetected until the working program


is reviewed, can be disastrous
4. “Blocking states” problem

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 26
The Applicability of Waterfall
 When the requirements for a problem are well
understood and reasonably stable

 This situation is often encountered when well-


defined adaptations or enhancements to an existing
system must be made
 E.g., an adaptation to an accounting software because of
changes to government regulations

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 27
The V-Model
 A variation of the
waterfall model
 A variation in the
representation
 No fundamental
difference
 V-model is also
linear

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 28
The Incremental Model
 There are many situations in which initial software
requirements are reasonably well defined
 But we need to provide a limited set of software
functionality to users quickly
 Then refine and expand on that functionality in later
releases
 In such cases, we choose a process model that is
designed to produce the software in increments
 Combines linear and parallel process flows

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 29
The Incremental Model

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 30
The Incremental Model
 Each linear sequence produces deliverable
“increments” of the software
 The first increment is often a core product
 Basic requirements are addressed
 But many supplementary features remain undelivered
 The core product is used by the customer
 A working version will be available late sooner
 Based on evaluation results:
 A plan is developed for the next increment
 The core product is modified to better meet the customer needs
and the delivery of additional features
 This process is repeated until the product is completed

31
Example
 Word-processing software developed using the
incremental paradigm:
 In the first increment: deliver basic file
management, editing, and document production
functions
 In the second increment: more sophisticated editing
and document production capabilities
 In the third increment: spelling and grammar
checking
 In the fourth increment: advanced page layout
capability
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 32
Evolutionary Process Models
 Software, like all complex systems, evolves over time
 Grows and changes
 In these situations, you need an evolutionary model:
1. Business and product requirements often change as
development proceeds, making an end product unrealistic
2. A set of basic requirements is well understood, but the
details of product have yet to be defined (not soon)
 Evolutionary models are iterative
 Two common evolutionary models:
 Prototyping
 Spiral

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 33
Iterative vs. Incremental?
 An iterative process makes progress through continuous
refinement
 The final product may be quite different from the initial
product

 An incremental process makes progress through small


increments
 Releasing small
features at a time
depending on their
priorities

34
Evolutionary Models: Prototyping
 What is a prototype?
 An early sample, model, or release of a product
 Benefit?
 To get valuable feedback from the users early in the
project
 To be sure of the efficiency of an algorithm, the
adaptability of an operating system, or …
 Better understand what is to be built when
requirements are fuzzy
 It can be used within the context of any process
model

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 35
Prototyping
 Two kinds of prototypes:
1. Throwaways
 may be too slow, too big,
awkward in use or all three
2. Evolutionary
 slowly evolves into the actual system

 The problems of prototyping:


1. Stakeholders see what appears to be a working version
of the software
2. As a software engineer, you often make implementation
compromises in order to get a prototype working quickly

36
Evolutionary Models: The Spiral
 Using the spiral model, software is developed in a
series of iterations (i.e., evolutionary releases).
 During early iterations, the release might be a model
or prototype.
 During later iterations, increasingly more complete
versions of the engineered system are produced
 It is a risk-driven model
 Better understand and
react to risks
 A realistic approach to the
development of large-
scale systems
37
Still Other Process Models
 Component based development—the process to
apply when reuse is a development objective
 Formal methods—emphasizes the mathematical
specification of requirements
 AOSD—provides a process and methodological
approach for defining, specifying, designing, and
constructing aspects
 Unified Process—a “use-case driven, architecture-
centric, iterative and incremental” software
process closely aligned with the Unified Modeling
Language (UML)
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill, 2014). Slides copyright 2014 by Roger Pressman. 38
Further Reading

39
The End

40
Further Study: Other Process
Models

41
Component-Based Development
 The component-based development comprises
applications from reusable components
 Commercial off-the-shelf (COTS) software
components
 Developed by vendors

 Provides targeted functionality with well-


defined interfaces that enable the component
to be integrated into the software

42
The Formal Methods
 Formal methods enable you to specify, develop, and
verify a software by applying mathematical notation
 They provide a mechanism for eliminating many of
the problems that are difficult to overcome using
other software engineering paradigms.
 Ambiguity, incompleteness, and inconsistency can be
discovered and corrected more easily—not through ad
hoc review, but through the application of mathematical
analysis
 The formal methods approach has gained adherents
for safety-critical software systems
 e.g., aircraft avionics, medical devices, etc.

43
Aspect-Oriented Software
Development (AOSD)
 Core concerns vs. Cross-cutting concerns
 Core concerns: primary functionality of the system
(business logic)
• E.g., place a new order
 Cross-cutting concerns: concerns that cut across
multiple system functions, features, and information

44
Aspects
 An aspect is a representation
of a cross-cutting concern.
 Example:
 Authentication
 Log
 …

 Aspects modularize
cross-cutting concerns
that would otherwise
end up scattered across
several modules.
45
AOP vs. OOP

 AOP is not a competitor for OOP


 it emerged out of OOP paradigm
 AOP extends OOP by addressing few of its problems
 AOP introduces neat ways to implement crosscutting
concerns in a single place
 which might have been scattered over several places
in the corresponding OOP implementation
 AOP makes the program cleaner and more loosely
coupled
 So, it is not AOP vs OOP
 It is AOP with OOP

46
AOP—An Example
 Note: Everything that AOP does could also be done without it by
just adding more code
 AOP just saves you writing extra codes

 Assume you have a graphical class with many "set...()" methods


 After each set method, the data of the graphics changed
 thus the graphics need to be updated on screen

 Assume to repaint the graphics you must call "Display.update()“


 The classical approach is to solve this by adding more code. At
the end of each set method you write:

47
AOP—An Example (cont.)
 If you have 3 set-methods, that is not a problem
 But if you have 200 (hypothetical), it's getting real painful to add
this everywhere
 Also whenever you add a new set-method, you must be sure to
not forget adding this to the end
 otherwise you just created a bug

 AOP solves this without adding tons of code, instead you add an
aspect:

 And that's it! Instead of writing the update code yourself, you just
tell the system that after a set() pointcut has been reached, it
must run this code.
 No need to update 200 methods, no need to make sure you
don't forget to add this code on a new set-method 48
AOP—An Example (cont.)
 Additionally you just need a pointcut:

 That means:
 if a method is named "set*" (* means any name might follow
after set),
 regardless of what the method returns or what parameters it
takes
 and it is a method of MyGraphicsClass

 and this class is part of the package "com.company.*",

 then this is a set() pointcut.

 And our first code (previous slide) says:


 "after running any method that is a set() pointcut, run the
following code.
49
AOP—An Example (cont.)
 Everything described in this example can be
done at compile time.
 The pre-processor of AOP can just modify your
source
 e.g. adding Display.update() to the end of
every set-pointcut method, before even
compiling the class itself

50
Further Study: Risk Analysis

51
Assessing Project Risk
 Is project scope stable?
 Does the software engineering team have the right mix
of skills?
 Are project requirements stable?
 Does the project team have experience with the
technology to be implemented?
 Is the number of people on the project team adequate to
do the job?
 Do all customer/user constituencies agree on the
importance of the project and on the requirements for the
system/product to be built?
 …

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 52
Risks Due to the Customer
Questions that must be answered:
• Have you worked with the customer in the past?
• Has the customer agreed to spend time with you?
• Is the customer willing to participate in reviews?
• Is the customer technically sophisticated?

• Is the customer willing to let your people do their


job—that is, will the customer resist looking over your
shoulder during technically detailed work?
• Does the customer understand the software
engineering process?

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 53
Risks Due to Process Maturity
Questions that must be answered:
• Have you established a common process framework?
• Is it followed by project teams?
• Do you have management support for
software engineering ?
• Do you conduct formal technical reviews?
• Are CASE tools used for analysis, design and
testing?

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 54
Technology Risks
Questions that must be answered:
• Is the technology new to your organization?
• Are new algorithms, I/O technology required?
• Is new or unproven hardware involved?
• Does the application interface with new software?
• Is a specialized user interface required?
• Are you using new software engineering methods?
• Are you using unconventional software development
methods, such as formal methods, AI-based approaches,
artificial neural networks?

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 55
Staff/People Risks
Questions that must be answered:
• Are the best people available?
• Does staff have the right skills?
• Are enough people available?
• Are staff committed for entire duration?
• Will some people work part time?
• Do staff have the right expectations?
• Have staff received necessary training?
• Will turnover among staff be low?

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 56
Recording Risk Information

Project: Embedded software for XYZ system


Risk type: schedule risk
Priority (1 low ... 5 critical): 4
Risk factor: Project completion will depend on tests which require
hardware component under development. Hardware component
delivery may be delayed
Probability: 60 %
Impact: Project completion will be delayed for each day that
hardware is unavailable for use in software testing
Monitoring approach:
Scheduled milestone reviews with hardware group
Contingency plan:
Modification of testing strategy to accommodate delay using
software simulation
Estimated resources: 6 additional person months beginning in July

These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 8/e
(McGraw-Hill 2014). Slides copyright 2014 by Roger Pressman. 57