GENERAL NOTES {ELECTRICAL)

1. THE ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITli


THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS OF
THE LATEST EDITTON OF THE PHILIPPINE ELECTRICAL CODE (PEC). a::n:::::n
LEGEND:

1-18 WATIS TUBE TYPE LED LIGHTING


® I~

THE RULES AND REGULATION OF THE LOCAL ENFORCING A~ORITY FIXTURE


AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY THE (FLUSH MOUNTED)
ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION OF A
DULY REGISTERED ELECTRICAL ENGINEER. 15 WATIS BULB TYPE LED LIGHTING
1100
FIXTURE ON 4"0 PLASTIC RECEPTACLE
2. THE ELECTRICAL SERVICE POWER 15 !·PHASE, 2-WIRE 230V AC,
60 Hz.
DUPLEX ORDINARY OUTLET
3. WIRING METHOD SHALL BE AS FOLLOW:
a. FEEDERS AND RISERS • INTERMEDIATE METALLIC CONDUIT MAIN BRKR:60AT2P.
BRANCH:2X20AT2P,2X30AT2 STAIRCASE
b. LIGHTING, POWER RECEPTACLE • POLYVINYL CHLORIDE CONDUIT
FLUSH ED MOUNTED LIGHT SINGLE SWITCH
51
4. ALL WIRES SHALL SE COPPER AND THERMOPLASTIC INSULATED W/ PLATE COVER
TYPE "THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE
MINIMUM SIZE OF THE WIRE FOR POWER AND LIGHTING CIRCUIT FLUSHED MOUNTED LIGHT DOUBLE SWITCH
52
HOME RUN SHALL BE 3.5 mm2 AND INSULATED FOR 60 VOLTS. W / PLATE COVER

Ji
SMALLEST RACEWAY SHALL BE LSmm TRADE/NOMINAL SIZE.

5. ALL OUTLET BOXES SHALL BE GALVANIZED GAUGE NO. 16 DEEP


TYPE WITli FACTORY KNOCKOUTS.
CIRCUIT HOMERUN ,,9=
I I
/----~
I I
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND 2e- ... ,
I
:
I

APPROVED TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF


USAGE. 2 - -- - t..::p:'::s:~-~':2:::::=:.;..:.=':5?=~s::=lfl-;jJ -- - -- - -- - -- -
SERVICE ENTRANCE
7. GROUNDING SYSTEM SHALL BE PROVIDED TO AU LIGffTING AND CONNECTED TO 2-' --------
EXISTING ELECTRICAL
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE
REQUIREMENTS. AC SOURCE
~ I! ~i___ _,,,~ 2D=i
8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOW:

a. LIGHT SWITCH L.20 m. ABOVE FINISH FLOOR ~-L--~-----~-~-----


~' I
b. CONVENIENCE OUTLET 0.30 m. ABOVE FINISH FLOOR
I
c. PANEL BOARD 1.50 m. ABOVE FINISH FLOOR

LOAD SCHEDULE & COMPUTATION: GROUND


CONNECTTON
GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAYOUT
PANELBOARO: MOP FLUSH MOUNTED, Panel Box, 6 Branches RISER DIAGRAM SCALE I: 5 0 M. SCALE l: 5 0 M.
CKT.
LOAD DESCRIPTION Li:o AMPS. BRKR. SIZE OF CONDUCTOR IN CONDUIT
NO.

LIGHTINGOUTLET 1300 5.65 20 2 · 2.0mm2 THHN WIRE STRANDED IN 15mm <b PVC

CONVENIENCE OUTITT 1800 7.83 30 2· 3.5mm2 THHN WIRE STRANDED+ 1·2.0mm2 THHN WIRE (G) IN 20mm 0 P\IC

CONVENIENCE
OUTLET 1800 7.83 30 2- 3.Smm2 THHN WIRE STRANDED+ 1·2.0mm2 TliHN WIRE(G) IN 20mm e PVC.

SPARE 1500 6.52

~r-r
SPARE 1500 6.52
1600
TOTAL 7,900 MAIN FEEDER: 60 Amp Bolt · On Type, 2P, 2'JfN AC, IOWC

Total Connected Loads: 7,900.00 VA


IL= 7,900/230 = 34.35 Amperes

Use: 2 · 8.0mm2 THHN Wire Stranded+ 1 · 5.Smm2 THHN Wire (G) Stranded ,n 25.4mm0 RSC
STAtRCASE
I
I

I
----------------------------·-··-··--·-----J--------------··-·-·--
1

t ' I l ;:f ':. I

0 J - .-- - -y- ·----··:::·: ··-----~~- - - - - - - - - -ri 0- ,~ - !


§
t _: _I_ ~t==:~=;,.:..;==='====!E:o!
....

0-JL__ ---------
~
: :. -- -- -1- - _ I
ooO
TO CALACA,
I
:-------"ML-------i--------'3~500..,_
! L_-.:.:_-_-~---------)
z--L-
~RVKE
EHTAAt«:E
-~-1-- I
'-+··--------- .. ------------------···--·· ------------··r-------------------3500
JROOfUN•
I

-------------------------900 ---1
:

i
r-
j
BALA YAN
PROPER
-~~-------lSl)O
TO CALATAGAN, ~<& GROUND FLOOR POWER LAYOUT
SECOND FLOOR POWER LAYOUT
LIAN, NASUGBU ~\S SCALE I: 5 0 M.
SCALE l: 5 0 M.
@ LOCATION
S C A L E
M A P
ti T S

PROJECT NA.ME A.ND LOCATION: SHEET CONTEJIIT: mo, REVIEWE : SUBMITTED BY: RECOMMEflDltiG APPROVAL. APPROVED BY: SET NO. SHEET NO.
REPUBllCOfTliE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS ANO HIGHWAYS GENERALNOTES (ELECTRICAL) RHOMAR B. MACAUNDONG
lfGEND
OFFICE OF THE DISTRICT ENGINEER
BATANGAS I DISTRICT ENGINEERING OFACE
CONSTRUCTION OF
MULTI-PURPOSE BUILDING,
(BARANGAY HALL),
RISEROIAGRAM
LOAD SCHEOt.A.E ANO COMPUTATION
LOCATION MAP
GROLND R.OOR LIGHTINGLAYOUT
PREPARED:
ARCHITECTII

VIVI FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO


0
BRGY. MALALAY, BALAYAN,BATANGAS SECOtiD R.OORUGHTING lAYOUT
GROUND R.OOR POWERLAYOUT
SECOND FlOOR i:QWER 1.AYOJT
GINA B. GUINTO
EHGIUEER II
EHGINEER II
0.UL ....
CHIEF, PLAtHUNG & DESIGN SECTION ASSISTANT DISTR.lCT ENGINEER OJSTRICT ENGINEER ~
©
5400 1600
r
1
1600

0-- ____ FIREIWALL ] .,.....~_


------,-
'
©-·--: --.--- ;
~
~ !
1 I
©-- ~·-------,
----.---.-
·-----,

·~ Pl'R PIPE WATER ~--·-·······"··------ .. ---,Alsomm. ~ PVC(VSTR)


I
SUPPLYUNE

l---=-J ·--·-·---··A.l
I
0--1---- -----1 @-1-1-----

0--l _ ------------- -------·- 0-!__! -----1. ------------- ----' ---~-


GI/ I. 100mm.~ 100mm.~
DOWNSPOUT DOWNSPOUT
SM I
CV

....
1·~ PPR PIPE FROM EXISTING :
WATER SUPPLY LINE---=

SECOND FLOOR WATER LAYOUT


SCALE I: 40 M.

GROUND FLOOR WATER LAYOUT


SCALE I: 4 0 M.

PROJECT NAME AUD LOCATIOH: SHEET CONTENT: mo, SUBMITTED BY: RECOMMENOING APPROVAL: APPROVED BY: SET NO. SHEET NO.
A.EPUOUC ()fl flt( P .. uw1~S


OEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR WATER LAYOlJT


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF SECOND FLOOR WATER LAYOlJT
BATANGAS I DISTRICT ENGJNEERJhGOFflCE MULTI-PURPOSE BUILDING,
PREPARED: VIVI FLORENCIA G. CORDOVA BENCIO A. AGUZAR
eAT~ASCHV (BARANGAY HALL), JOEL F. LIMPENGCO 4
BRGY. MALALAY, BALAYAN,BATANGAS VINC ENGUIEER ti CHIEF, PLANNING & DESIGN SECTION ASSISTANT OISTRJCT ENGINEER DISTRICT ENGINEER
,.

GENERAL NOTES (SANITARY)


LEGEND:
ALL PLUMBING WORKS HEREIN SHALL BE EXUCUTED IN ACCORDANCE TO THE PROVISION OF THE PHILIPPINE PLUMBING
CODE,THE NATIONAL BUILDING CODE ANO THE RULES AND REGULATIONS OF THE LOCAL MUNIOPALITY. SYMBOL DESCRIPTION
2700
COORDINATE THE DRAWINGS THE DRAWINGS WITH THE OTHER RELATED DRAWINGS AND SPEOFICATIONS THE
ENGINEER AND/OR THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND HEREIN.

ALL PIPES SHALL BE INSTALLED AS INDICATED,ANY RELOCATION REQUIRED FOR PROPOER EXECUTION OF THE PLUMBING
® WATER SERVICE METER

WORK SHALL BE WITH PRIOR APPROVAL OF THE ENGINEER AND/OR THE ARCHITECT. I>< GATE VALVE (l" 0 BRASS)

PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION,OEPTH AND INVERT ELEVATIONS OF ALL
r-, CHECK VALVE (l" 0 BRASS)
EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.
WC WATER CLOSET (PORCELAIN)

ALL SLOPES FAN DOR HORIZONTAL DRAINAIGE SHALL MAITAIN ONE PERCENT (0.01) AND ONE-HALF PERCENT (0.01) 1/2
PERCENT (0.005) MINIMUM UNLESS OTHERWISE SPECIFIED IN THE DRAWING.
LAV LAVATORY (PORCELAIN) I
WATER SUPPLY PIPE TO FIXTURES SHALL BE SIZED IN ACCORDANCE WITH THE MANUFACTURERS
FD FLOOR DRAIN (STAINLESS STEEL)
I
RECOMMENDATION. co CLEAN OUT
-
J__ -- ·-r
VSTR VENTILLATION STACK THRU ROOF
ALL BRANCHES OF FIXTURE OR GROUP OF FIXTURES SHALL BE PROVIDED WITH AIR CHAMBER MADE OF CAPPED VERTIAL
EXTENSION PIPE. --/.V/ ~
ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED AT 100 PSi FOR A PERIOD OF TWO (2) HOURS BEFORE BURRIEO WATER LINE I
v
OR COVERED. GALVANIZED IRON (G.I.) PIPES DIRECTLY IN CONTACT WITH THE SOIL SHALL BE PROVIDED WITH THE
TWO COATS OF MELTED ASPHALT AND WRAPPED WITH JUTE CLOTH SOAKED IN MELTED ASPHALT.
SEWER LINE ,_§_~~-------------------~
PLAN
THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE THE WORK WITH THE SEWER ANG
STORM ORAINAIGE LINE EFFLUENT DISPOSAL POINT ANO WATER LINE SERVICE CONNECTING/ TAPPING POINT.

ALL PIPES SIZES ANO OTHER OIMENTIONS ARE IN MILLIMETER (mm) UNLESS OTHERWISE SPECIFIED. I ~~-
1,
~1
1500

MH
- -
AIRSPACE
2700

·~-~,
,....
D
900

MH

- -
1
.____J

LEACHING
4"THK. CHB
---
---
CHAMBER
WALLw/
- ~
.
10mm.0VERT.
.,
.
0
BARS@
~ OEGESTIVE
BOOmm.M.O.C
& 10mm.0
CHAMBER HOR. BARS@
<l 800mm. M.O.C.
" <l a
• • •
<l
-a • o
cl -
!":-.
'I ~ ~
"'----- 14-lOmm. • LONG BAAS &.
S-10mm. f SHORTBARS &

1650 1050

DETAIL OF SEPTIC VAULT


SCALE I: 20 M.

METRIC VI E W
M.
TO CALATAGAN, ('-\~
LIAN, NASUGBU ~~® C LOCATION
f-----+-------------------
P -2 NOT TO SCALE
MAP

PROJECTNAME AHO LOCATION: SHEET CONTENT: SUBMITTED BY: RECOMMENDINGAPPROVAL: APPROVED BY: SET NO. SHEET NO.
R[Pl.8LICOFT~PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF LEGEND
BATANGAS I DISTRICT ENGINEERINGOA'ICE MULTl-PURPOSE BUILDING, DETAIL OF SEPTIC VAULT
6A.l4.NGASCIT'Y (BARANGAY HALL), ISOMETRIC VIEW
PREPARED: FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO 4
• BRGY. MALALAY, BALAYAN,BATANGAS LOCATION MAP CHIEF, PlAHNIHG &. OESIGH SECTIOU ASSISTAITT DISTIUCT ENGINEER DISTRICT ENGINEER

You might also like