- ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations, Engineering & Marketing to ensure effective co-ordination, implementation & communication
of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development (C ) 4M Change (D) Alternate Process Control
PROCESS OWNER : QA / Designer
By what (Equipment material) Risks : By whom (personal, training, know-how, skills):
MS Excel 1.) No timely review of Changes result in delay in implementation -Appropriate knowledge of Product and process
2.) Communication gap b/w customer and internal department for change evaluation
-Appropriate knowledge of Customer and IATF 16949
systems for change evaluation
Inputs: Outputs:
1) Customer & Internal Complaints 1) Technical verification of change prior to approval
2) Customer Engg. Change Note 2) Approved P/ECN - Proper verification of impact on
3) Localization, source change, VA/VE customer or IATF 16949
4) Capacity Constraints c/ms,resource 3) Cost impact verification
optimization 4) Customer approvals (wherever required)
Change Point Control System 5) Pre & post modified parts Inventory management
6) Communication of change at Gemba
7) Updated DFMEA & PFMEA and other relevant
documents standardized (if any)
8) Release of revised documents and proper disposal
of obsolete documents
9) Alternate Control Method / Updated 4M Change
How (instructions, procedures, Performance Indicators:
methods) 1) Change Request Note (Design and Process)
1) APQP and PPAP guidelines raised and pending status
2) Design verification
3) Lab Validation (wherever required)
PAGE - 01 OF 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations,Engineering & Marketing to ensure effective
co-ordination, implementation & communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
11 QA Quality Assurance
12 Engg. Engineering
13 c/m Countermeasures
Page 02 of 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations, Engineering & Marketing to ensure effective co-ordination, implementation &
communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
(A) - Products in Production
Job flow Resp Checking Point Document / Format
Start
Registration of P/ECRN Quality Assurance -Duly approved by the deptt. Head - PCRN
of Initiating deptt. - ECRN
-Review Technical shall not exceed
D
10 working days
OK
OK
Engg.
Cost Impact
verification
by cost cell?
Not OK
OK Send the rejected Copy Engg. -Register the rejected P/ECRN with -ECRN Monitoring Sheet
to Initiator
remarks in Summary -PCRN Monitoring Sheet
A Finish
Approve P/ECRN and update QA and Engg. Update P/ECN details -ECN
P/ECN -PCN
PAGE - 04 OF 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations, Engineering & Marketing to ensure effective co-ordination, implementation &
communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
(A) - Products in Production
Job flow Resp Checking Point Document / Format
B
Approval By
Approval NO QA For PCN - Manufacturing Head -ECN
of P/ECN C
For ECN - Engineering Head -PCN
YES
Is Customer
QA -As per Customer Specific require- -Customer Specific Format
Notification
required? ments
NO
Yes
Yes
Customer Engg. / QA -ECRN Monitoring Sheet
Allot E/PCN No.
approval
received? -PCRN Monitoring Sheet
First supply after change Engg. -Attach Tag identification changed -Identification
implementation parts supply
Finish
PAGE - 05 OF 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations, Engineering & Marketing to ensure effective co-ordination, implementation &
communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
(B) - Products under development
Job flow Resp Checking Point Document / Format
Start
Finish
PAGE - 06 OF 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations, Engineering & Marketing to ensure effective co-ordination, implementation &
communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
(C) - 4M Change Control in Production
Job flow Resp Checking Point Document / Format
Start
Approval from QA is must & from QA - Incase of Men, Operator Skill 4 M Change Sheet
customer (if required) Matrix to be referred with verification
of first 5 piece
Finish
PAGE - 07 OF 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations, Engineering & Marketing to ensure effective co-ordination, implementation &
communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
(D) - Alternate Process Control Method
Job flow Resp Checking Point Document / Format
Start
Before starting using alternate control QA Review of alternate process control Deviation Note / Register
method, approval from QA is must as
per Procedure - Deviation Process operation on daily basis to verify
implementation of standard work
Before shipping product that was QA To be informed to customer if List of Alternate Process
inspected or tested using alternate
method, inform to customer (if required) approval of alternate process control Control Method
method not taken from customer
(preferabbly during PPAP)
Finish
PAGE - 08 OF 09 SIGNATURE - MR
TITLE : CHANGE POINT CONTROL SYSTEM DOCUMENT NO. - ENG-P-03
IATF 16949:2016 Clause Ref. - 7.5.2, 7.5.3, 7.5.3.2.2, 8.5.6 ISSUE - 00
ISSUE DATE - 01.04.17
PURPOSE : The steps to be followed by Manufacturing, Operations,Engineering & Marketing to ensure effective
co-ordination, implementation & communication of design/process changes
SCOPE : All products and processes (A) in Production and (B) Under development
Page 09 of 09 SIGNATURE - MR